Cement Plant management and technical staff trainingCement Plant Operation like CCR operator (Kiln, Vertical (Raw Mills and Cement MCement plant Budget planning, its implementation and controlTrouble shooting of the process and equipment's usedEnergy reduction and cost savings in Cement productionUtilization of manpower and its optimizationPlanning yearly turnarounds and coordinating the shutdowns activitiesLoss prevention and Industrial safety
·

وظّف هذا الشخص

أرسل عرض عمل مباشرة لهذا المرشح

Cement Plant management and technical staff trainingCement Plant Operation like CCR operator (Kiln, Vertical (Raw Mills and Cement MCement plant Budget planning, its implementation and controlTrouble shooting of the process and equipment's usedEnergy reduction and cost savings in Cement production

نبذة

Looking for position in large reputable organization, to actively contribute in the success of the organization growth, by working in challenging position where the company can fully utilize my experience, benefits from my skills and in turn allow me the opportunity to pursue my career advancement goals and further enhancing my overall knowledge.

الخبرة

Manager Production - Al Ain CEMENT FACTORY - Al Ain (UAE)

(2021-12)

Plant capacity: 10000 TPD OPC by (M/S Sinoma China)

  • Operational In charge for Unit Crushers, Kiln, VRMS, VCMS and Packing Plant

Process in Charge (From Crusher to Packing Plant) - ALKHALIJ CEMENT COMPANY (QIG) - Qatar

(2011-05 - 2021-12)

Line-1 5800 TPD (OPC &SRC) by M/ FLSMIDTH Denmark. Line-2 5800 TPD (OPC &SRC) by M/ FLSMIDTH Denmark

  • Operational In charge for Unit Crushers, Kilns, VRMS, VCMS and Packing plant

Shift Supervisor (VRM, Kiln and Cement Mills) - SOUTHERN PROVINCE CEMENT COMPANY - Saudi Arabia

(2008-06 - 2011-04)

Plant capacity: 5000 TPD OPC by (M/S Sinoma China)

  • Operational In charge In Shift for Unit, Kiln, VRM and Cement Ball Mills

Assistant Manager Production - KOHAT CEMENT COMPANY LIMITED - Pakistan

(2002-10 - 2008-05)

Line-1 1800 TPD (OPC) by M/S Uzinexportimport (UEI) of Romania. Line-2 450 TPD (OPC white) by M/S Babcock Germany. Line-3 6700 TPD (OPC) by M/S Sinoma China

  • Can Operate kiln, Raw Mill and Cement Mills from CCR
  • Preparation of production plan according to production target set by higher management
  • Responsible for kiln, Raw Mill and Cement Mill process and operation to achieve the production targets and KPI by optimizing the (kiln Raw Mill (VRMS) and Cement Mills VRM and Ball Mills) process including guiding for the CCR operators and training them on Kiln and Mill Trouble Shooting
  • Write the operation procedures for Kiln and Mills, Monitoring the kiln and Mill parameters to reach the max production and reducing energy consumption level
  • Analyze the process problems and find solutions for them and write RCA for problems
  • Training and evaluating CCR operators
  • Follow up for production Process and efficiency of the unit's raw mill, kiln, and cooler and cement mills on 24 hours basis
  • A regular and constant vigilance communication with quality control department to achieve the production targets according to quality control standards
  • Supervising/coordinating with head of maintenance by scheduling maintenance stoppages
  • Supervising/coordinating with head of Electrical by scheduling maintenance work and calibration of instrument
  • Applying proper procedure (Burning and Grinding) with strict respect for the plant environment, safety and cement quality standards
  • Coordinating with Head of Quality Control regarding any important problem in the process line or quality control results
  • Supervising/coordinating of kiln shutdown mills shutdown for General Maintenance
  • Supervising/Coordinating Inventory of materials (Clinker, Lime stone, Gypsum and Iron ore etc :)
  • Supervising/coordination refractory requirement for Kiln, Cooler, TAD and Pre heater
  • Inspection of Refractory Bricks condition in Kiln, Cooler TAD and Preheater and make a plan for Schedule stoppage for Change
  • Supervising/coordination refractory Installation of Kiln, Cooler, TAD and Pre heater in annual Stoppages and in emergency Stoppages

التعليم

Bachelor of Science (B.Sc.) - Chemical Engineering - N-W.F. P University of Engineering and Technology Peshawar (2002-10)

Higher Secondary School Certificate (HSSC) - Islamia College Peshawar

المهارات

CHEMICAL ENGINEER-PRODUCTION MANAGER

التقييمات