أرسل عرض عمل مباشرة لهذا المرشح
Dear Sir,
Please find attached resume for the post of Maintenance Engineer/Electrical Engineer.
Previously worked in Abu Dhabi(NOV) and Saudi Arabia(GSW) as a Maintenance Team Lead and Electrical Engineer respectively.
12 years of good Maintenance work Exposure in handling plant and Machine Maintenance along with team handling, good problem solving capabilities and Decision making.
Capable of handling entire maintenancne activities without any supervision.
Preventive Maintenance, Breakdow Maintenance, Crane Maintenance,5S,Mtbf ,mttr,spare parts planning,vendor Management,AMC ,CAPA,Kaizen,plasma cutting machine ,High speed water jet cutting,Cnc bending machines, CNC machines with fanuc and Siemens controls and Galvanizing process,Furnaces and calibration of instruments are few areas of my expertise.
0504268959
I am looking for the position of Maintenance Engineer/Electrical Engineer in any steel plant where I can utilize my 12 years of expertise in handling Plant ,facilities and machinery maintenance.
Duration:25th July 2020 to 8th Nov 2021. Designation: Shift Incharge (Electrical Engineer)
Area of Responsibility:-
2)Assist in troubleshooting and repairing of mechanical, hydraulic, and pneumatic, furnaces and electrical/electronic equipment including but not limited to programmable logic controls(PLC), fanuc and Siemens controls cnc machines, SCADA,HMI.
4)Handling Galvanizing plant maintenance actives like Gas fired furnace(lpg),trouble shooting of furnace PID Control panels, blower,Temperatire variations,drives,Burner controllers,Cranes maintenance activities,quenching tank,acid tank,flux tank,Heaters,flame rod sensors etc.
9)Assist Dept in maintaining spare parts for overall plant by raising material request through SAP,AIMMS for electrical,mechanical,electronics etc by close follow up with purchase team and external vendors.
10)Assist Maintenance HOD in providing daily ,weekly and month report required for generation of Monthly KPI report,Breakdown Analysis report,Critical spare list and any other issue related to plant breakdown.
Designation: Maintenance Team Lead.
Duration:26th Dec 2018 to 20th Oct 2019 Designation:Maintenance Team Lead.
Area of Responsibility:-
Duration:5th May 2018 to 15th Sep 2018 Designation:Electrical Engineer.
Area of Responsibility:-
Duration: 1st Feb 2017 to 20th March 2018 Designation:Asst.Manager Service
1)Managing team of service engineers with their service visit at client locations.
2)Managing day today complaints from clients by providing service support and spare parts.
3)Day today Follow up with clients to ensure timely completion of service visit and ensure that clients problems are fully resolved.
4)Spare parts planning as per clients P.O and ensure that it is timely delivered and critical stocks are maintained in store.
5)Payments follow up for pending payments from client side and ensure it is timely received as per monthly targets.
6)Keeping track of engineers expenses (to and fro,loading boarding )are done as per company rules and are within limits.
7)Ensuring day today machine installation,AMC and trials are conducted within provided time frame with proper documentation.
8)Working on SAP module for material request , Consumabule spare and Critcical spare parts.
Duration: 1ST Jan 2013 To 2nd Jan 2017 Designation: Sr. Electrical Engineer
Division: Forging and CNC.
Company Profile: Bebitz Flanges Works Pvt Ltd is a 100% export oriented unit. M/s BFWPL popularly known as BEBITZ Flanges is a sub diary unit of its parent company M/s Flanschenwerk BEBITZ GmbH which was started in 1911 to produce all varieties of stainless steel, carbon & alloy steel. The parent company M/s Flanschenwerk BEBITZ GmbH was acquired by the Viraj group in Dec 2003 and since then its operation is running successfully in BEBITZ Germany.
Area of Responsibility:-
3)Trouble Shooting ,Preventive & Breakdown maintenance of CNC machine likeVMC,CNC lathe(Ace micromatic,jyoti, lokesh and special purpose machine like muratec, gnutti and porta.
Stabilizer, compressor (250 cfm and1000 cfm), cranes (5 ton to 30 ton).
1)ELECTRONIC
ENGINEERING FROM AMRUTVAHINI COLLEGE OF ENGINEERING (PUNE UNIVERSITY),MAY 2009.
2)DIPLOMA IN ELECTRONICS ENGINEERING FROM JAIHIND POLYTECHNIC,(MUMBAI UNIVERSITY),APRIL 2006.