UAE-Licensed Electrical Engineer and ADNOC-Approved HSE Officer with 10+ years of experience across Oil & Gas, Refinery, EPC Construction, and Solar Power projects in the UAE and Pakistan. Proven track record in MV/LV switchgear installation, testing & commissioning, transformer maintenance, and cable termination on live refinery process units (ISOM, DHDS, AMU, SRU) and multi-megawatt power infrastructure, including the 1500 MW Al Ajban Solar Project. Combines hands-on QA/QC inspection, ITP/RFI documentation, and NCR/punch-point close-out with NEBOSH IGC, IOSH, and OSHA-certified safety discipline (PTW, LOTO).
Delivers compliant, reliable electrical installations to IEC/ANSI standards on schedule-critical EPC and shutdown/turnaround programs.
الخبرة
Electrical Engineer at Senlin Building & Construction LLC (2025-01 – Present)
1500 MW Al Ajban Solar Project (EPC)
- Leading electrical construction activities on a 1500 MW utility-scale solar PV project, coordinating with EPC contractors and consultants on installation, testing, and handover in full compliance with approved drawings, IEC standards, and safety regulations.
- Coordinating site electrical teams end-to-end, from task allocation through fault diagnosis, to keep construction milestones on schedule and minimize rework.
- Reviewing installation drawings and material take-offs, and preparing technical documentation to support new works and design modifications.
- Conducting QA/QC inspections on electrical installation work against approved drawings and ITPs; raising and closing out NCRs and punch points ahead of client and consultant walkdowns.
- Verifying material and equipment conformance (MTCs, calibration certificates, datasheets) against project specifications prior to installation and energization.
Sr. Electrical Officer at Attock Refinery Limited (ARL) (2020-01 – 2025-01)
ARL Expansion / Up-gradation Project
- Delivered installation and commissioning of transformers, MV/LV switchgear, and electrical panels during the ARL Expansion/Up-gradation Project, supporting continuous safe refinery operation.
- Executed Hi-Pot, Polarization Index (PI), Insulation Resistance (IR), and multifunctional relay testing & setting to IEC/ANSI standards, ensuring equipment met acceptance criteria prior to energization.
- Led preventive maintenance, oil testing/treatment, and full overhaul of 11kV/440V distribution transformers, reducing unplanned failures and extending asset life.
- Refurbished aging MCC and Power Center panels, extending equipment service life; supported plant startups across ISOM, DHDS, AMU, SRU, Preflash, and SGS units during scheduled shutdowns.
- Installed and commissioned a 20 MW diesel generating station, including transformers, MV/LV panels, MCC, PDP, and UPS systems, from erection through energization.
- Applied Permit-to-Work (PTW) and Lock-Out/Tag-Out (LOTO) procedures throughout high-voltage maintenance and shutdown activities, maintaining a zero-incident safe working environment.
- Carried out QA/QC checks and witnessed testing (Hi-Pot, PI, IR, relay setting) against IEC/ANSI acceptance criteria, maintaining test records and inspection reports for handover packages.
- Ensured installation and commissioning work complied with approved ITPs and QA/QC procedures, supporting punch-point clearance and RFI sign-off during shutdown startups.
Electrical Supervisor at Pakistan Oilfields Limited (2016-01 – 2020-01)
- Supervised electrical installation, cable laying, and termination activities across oilfield process and utility sites, ensuring work met approved drawings and specifications.
- Directed cable tray routing, panel installation, and wiring for field electrical systems, ensuring full compliance with drawings and safety standards.
- Performed testing, glanding, jointing, and termination of MV/LV Raychem cables up to 400mm² for underground and overhead installations.
- Performed QA/QC inspection of cable installation, glanding, and termination work, verifying compliance with approved drawings and specifications before sign-off.
- Maintained inspection and test records for field electrical work to support quality documentation and audit readiness.