Mourad Mohammed
Sr Commissioning Engineer
وظّف هذا الشخص
أرسل عرض عمل مباشرة لهذا المرشح
نبذة
I have more than 7 years of experience in testing and commissioning.
During this period, I worked on more than 10 projects (Power Planets and substations) in different countries (Qatar, KSA, UAE, Iraq, and Egypt).
I tested (GIS SWGR from 66 to 500 KV, Transformers, LV&MV SWGRS, and Protection relays from simple to advanced).
I am familiar with (ABB, GE, Siemens, and Micom protection relays) and with IEC61850 which I made Goose communication at LV SWGR to achieve the required interlocks.
I have a passion for continuous learning, troubleshooting, and new challenges.
الخبرة
- Create a schedule of commissioning activities for each stage of the process.
- Review and revise project drawings and schematic diagrams.
- Review and revise Project Protection Devices Configuration.
- Perform all the tests for Protection Relays (Siemens, ABB, Micom, GE).
- Perform power plant/substation commissioning activities.
- Review and test plant interlocking (powerhouse - Substation).
- Responsible for preparing red markup copy and as-built drawing for all involved systems.
- Perform all the tests needed in GIS (500 KV, 400 KV, 220 KV, 132 KV, 66KV, 33 KV, and 22 KV), (LCC scheme checking, interlock, Breaker timing, contact resistance, Hi-pot test, and partial discharge)
- Familiar with IEC61850 for protection relays (Siemens, ABB, and Micom) Goose massage between Relays and Station signals for SAS.
- Prepare all the test sheets for the tests and compare the results with the international standards (IEC).
- Performing training internally for my colleagues and externally to the owner.
- GIS Substation
- Shatra 220/132/11KV GIS Substation in Iraq in 2021
- Maysan 220/132/11KV GIS Substation in Iraq in 2020
- Manshite Nasser 220/66/11 KV GIS Substation in Egypt in 2019
- SUEZ GULF 500/220/22 KV GIS SUBSTATION in Egypt in 2018
- 132/11KV AL WUKAIR 11 Substation in Qatar in 2017
- 500KV Beni Sueef Substation GIS in Egypt in 2017
- 220KV ATTAQA GIS SUBSTATION in Egypt in 2016
- Power Plant
- Aweer Power Station” H” Phase IV in UAE in 2022
- Layyah Combined Cycle Power Plant in UAE in 2021
- 4800MW Beni Sueef combined cycle power plant, pahse1 (6*400MW) Gas turbines, fast track turn-key project in Egypt in 2016.
- JEDDAH SOUTH THERMAL POWER PLANT STAGE-I as manpower for HYUNDAI HEAVY INDUSTRIES CO in KSA in 2016.
- 320MW Mahmoudia simple cycle power plant, 2*160 MW Gas turbines, fast track turn-key project in Egypt in 2015.
- 640MW Attaqa simple cycle power plant, 4*160 MW Gas turbines, fast track turn-key project in Egypt in 2015.
التعليم
Bachelor's degreeFaculty of Engineering, Alexandria University, Electrical Power and Machine Department, Egypt 2013.Certifications
- Train The Training Course at 2021.
- 400 GIS commissioning and testing training at Toshiba Hama Kawasaki, Japan in 2019.
- PMP Preparation Course in 2019.
- Basic Operation Training from SIEMENS Power Academy on August 9-20, 2015
- Electrical Maintenance Training from SIEMENS Power Academy on August 23-27, 2015.