تخطي إلى المحتوى الرئيسي
Muhammad Shaukat Ali

Muhammad Shaukat Ali

HVAC & Chiller

كفاءة
Abu Dhabi, أبوظبي0عضو منذ ٢٣ مايو ٢٠٢٢
·

وظّف هذا الشخص

أرسل عرض عمل مباشرة لهذا المرشح

نبذة

1.Installation , opration maintinence of Heavy Equipments like Chilled Water Pump, Heat Exchangers, AHU’S etc. 2.

Hydro

Testing of Chilled Water Piping. 3.

Chemical

Flushing for Chilled Water System. 4.

Plant Room

Operation and Maintenance. 5.

Quantity Take

Off &

• Procurement - Involved in the Quantity Takeoff &

• Procurement for MS,GI,SS,HDPE,U,PVC,PPR, C.S Pipes, Fittings, etc For Process Plant and Building Services.

6. Installation - Full In charge for the Installation of Chilled Water Piping for Building Services HVAC System.

7. Supervising the Erection of PI,FIRE, G.I Ducting for AHUs, FAHUs, FCUs and Make Up air Fans with Accessories (Motorized Dampers, Volume Control Dampers, Fire Dampers Final Fixtures).Fire Rated M.S Ducting for Kitchen Extract, Aluminum Ducting For Dish wash.

8. Supervising the Water &

• Air balancing of the HVAC System by Handling the Modern &

• Traditional Water &

• Air Balancing Equipments such as Digital Water Meter, Bolometer, Micro Manometer, Anemometer, U Tube–Manometer, Tachometer, Clamp meter etc. 9.

Providing

Drawing and Information to Contractors and Site Personnel.

10. Ensuring the quality & complying the client specification.

11. Site Co-Ordination with other services. 12.

Arranging

Inspection of Installed Services for TAB of HVAC System.

13. Checking and Certifying Bills of Contractors.

14. Maintenance of the HVAC Systems &

• Trouble shooting. 15 Coordination with side Management and Order the Metarial as per drowing .15 Order the Material as per side requeir and Drawing .

الخبرة

1.Installation of Heavy Equipments like Chilled Water Pump, Heat Exchangers, AHU’S etc. 2.

Hydro

Testing of Chilled Water Piping. 3.

Chemical

Flushing for Chilled Water System. 4.

Plant Room

Operation and Maintenance. 5.

Quantity Take

Off &

• Procurement - Involved in the Quantity Takeoff &

• Procurement for MS,GI,SS,HDPE,U,PVC,PPR, C.S Pipes, Fittings, etc For Process Plant and Building Services.

6. Installation - Full In charge for the Installation of Chilled Water Piping for Building Services HVAC System.

7. Supervising the Erection of PI,FIRE, G.I Ducting for AHUs, FAHUs, FCUs and Make Up air Fans with Accessories (Motorized Dampers, Volume Control Dampers, Fire Dampers Final Fixtures).Fire Rated M.S Ducting for Kitchen Extract, Aluminum Ducting For Dish wash.

8. Supervising the Water &

• Air balancing of the HVAC System by Handling the Modern &

• Traditional Water &

• Air Balancing Equipments such as Digital Water Meter, Bolometer, Micro Manometer, Anemometer, U Tube–Manometer, Tachometer, Clamp meter etc. 9.

Providing

Drawing and Information to Contractors and Site Personnel.

10. Ensuring the quality & complying the client specification.

11. Site Co-Ordination with other services. 12.

Arranging

Inspection of Installed Services for TAB of HVAC System.

13. Checking and Certifying Bills of Contractors.

14. Maintenance of the HVAC Systems &

• Trouble shooting. 15 Coordination with side Management and Order the Metarial as per drowing .15 Order the Material as per side requeir and Drawing .

-

التعليم

Auto cad

8 years experience UAE

Strong knowledge

التقييمات