Mukesh Tiwari
Project Engineering Manager
وظّف هذا الشخص
أرسل عرض عمل مباشرة لهذا المرشح
نبذة
PMP® certified Mechanical Engineer with over 22 years of expertise in Power Plant Engineering and Project Management. Experienced in end-to-end coordination of Steam Turbine Generator (STG) packages, OEM interface alignment (GTG/STG/HRSG) and Boiler-Turbine integration for optimal performance. Demonstrated capability in delivering complex Thermal and Combined Cycle Power Plant projects with strict adherence to technical specifications and timelines across multi-stakeholder environments.
Combines deep technical engineering knowledge with Data Science expertise to drive project analytics, cost optimization and risk mitigation.
الخبرة
Managed HRSG, GT and ST interface alignment and ensured seamless integration of STG auxiliaries (BFP, CEP, CW pumps), achieving 100% compliance with OEM specifications and system performance requirements.
- Led proposal engineering and contract finalization for major STG packages and auxiliary systems (Fuel Gas Compressor, Fuel Gas Conditioning System, BFP, CEP, CWP, ECP) supporting EPC execution objectives.
- Coordinate technically with OEMs for GTG, STG, and HRSG to ensure seamless interface matching and reduce design conflicts, enabled clash-free 3D model reviews and timely approvals.
- Facilitated weekly design review meetings with Owner (YTL Power Seraya) and OE (Jacobs), aligning deliverables with project milestones, ensured on-time submission of design packages.
- Secured regulatory approvals from PCS, NEA and EEOA in close coordination with WSP enabled timely clearances for downstream design, manufacturing and construction activities.
- Led HAZOP and SIL workshops to identify and mitigate operational risks; embedded recommendations into design to strengthen process safety.
- Monitored deliverables from S&L and L&T-S&L, ensuring adherence to project timelines and budget constraints.
- Reviewed mechanical documents for contract compliance, scope accuracy and cost impacts; prevented scope creep and potential claims through early issue resolution.
- Acted as liaison between technical teams, project managers and stakeholders to ensure clear communication.
- Identified and implemented process improvements in technical workflows.
- Applied lessons learned to optimize future project performance.
- Communicate technical challenges effectively to non-technical audiences.
التعليم
- Project Management Professional (PMP®) | Project Management Institute
- Post Graduate Program in Data Science | Purdue University (Simplilearn), 2022-2023
- Post Graduate Certificate in International Business and Finance | IIFT Delhi, 2018-2019
- Bachelor of Engineering in Mechanical Engineering | HCET, Jabalpur, 1998-2002