Pramod Salgaonkar
Director of Engineering
نبذة
Accomplished Director of Engineering & Sustainable Manager with extensive experience in leading engineering teams and implementing sustainable practices. Proven track record in reducing environmental impact and operational costs through strategic planning and risk assessment. Expertise in project management, team leadership, and construction management, with a focus on continuous improvement and high-quality results.
Successfully directed cross-functional teams to meet project milestones within budget and time constraints. Committed to maintaining a competitive edge by analyzing market trends and technological advancements. Career goals include further advancing sustainable engineering initiatives to drive innovation and efficiency.
Hardworking and reliable construction professional with physical stamina and job knowledge to handle any site need. Skilled in completing manual jobs and operating equipment.
Reliable
Installation and Commissioning Construction Worker with hands-on expertise in setting up and calibrating complex systems. Strong background in troubleshooting, ensuring seamless operations, and maintaining safety standards. Proven track record of collaborating with diverse teams to deliver high-quality projects on time.
Brings commitment to excellence, effective problem-solving skills, and focus on client satisfaction. Confident in hands-on work with solid background in teamwork and problem-solving. Skilled in following instructions, ensuring safety, and maintaining quality standards.
Eager to apply adaptability and strong work ethic to contribute to successful installation and commissioning projects.
الخبرة
Director of Engineering & Sustainable Manager - Accor Novotel Mumbai International Airport - Mumbai, India
(2025-03)
- Conducted comprehensive risk assessments for projects, interiors & civil implementing mitigation strategies to minimize impact on deliverables.
- Cultivated a team-oriented environment that encouraged open communication, creativity, and accountability amongst engineering personnel.
- Championed the adoption of sustainable engineering practices, reducing environmental impact and operational costs.
- Streamlined engineering processes through the implementation of automation tools, reducing manual effort and error rates.
- Cultivated work environment focused on personal responsibility, continuous improvement and delivering high-quality results.
- Coordinated strategic plans for administrative services management and optimization to best use available resources.
- Analyses market trends and technological advancements to inform strategic planning and maintain competitive edge.
- Presented technical and project updates to executive leadership and stakeholders, securing buy-in and support for engineering initiatives.
- Directed cross-functional teams in the execution of project plans, meeting all milestones within budget and time constraints.
- Established performance metrics and KPIs to monitor project progress and engineer productivity, driving continuous improvement
- Property Green key successfully certified with all the sustainable requirement
- Implemented plan for HLP reduction by almost 7% than last year since last 4month avg trend is 9.2%
- Major focus on equipment's maintenance and fine tuning to reduce energy consumption
- STP water added UF and start using in Cooling Tower water body and washrooms
- Added VFD for one chiller ROI – 18months savings 12% in electricity
Pre-opening Chief Engineer- Projects and Operations - Marriott Vashi-Navi Mumbai - Navi Mumbai, India
(2023-04 - 2025-03)
This was a great experience to execute entire MEP, interiors, and civil projects with multiple resources and challenges, played a major role on equipment's selection and fulfill owners and Marriott acceptations and guidelines. In the installation and commissioning of all the major equipment, quality certification, co-ordination for snagging compilation, and smooth handover to the operations team on time with all sustainable products, with required best practices training for HODs and associates.
- Developed comprehensive project plans, outlining scopes, timelines, and resources, facilitating smooth execution.
- Review PBR, Drawings and share inputs with concern stakeholders
- Coordinated with clients to define project objectives and requirements, ensuring alignment with business goals.
- Presented project proposals and reports to senior management, articulating project value and securing necessary approvals.
- Negotiated contracts with suppliers and service providers, securing favorable terms and quality resources for projects.
- Facilitated regular team meetings and stakeholder updates, fostering open communication and collaborative problem-solving.
- Established proper control procedures and standards to maintain safe, functional machinery.
- Oversaw the development of project documentation, maintaining clear and accurate records throughout project lifecycles.
- Cultivated strong relationships with clients, stakeholders, and team members, building a culture of trust and cooperation.
- Monitored service delivery and intervened proactively to correct problems.
- Spearheaded initiatives to improve project management processes, resulting in a 15% increase in team efficiency.
- Maintained records of cold calls, presentations, closed deals and follow-up activities.
- Analyze plans, survey reports, maps and other data related to project design
- Reviewing permit application & licenses.
- Taken advantage of early joining and lead the project used technical expertise to use sustainable products and minimize the operations and maintenance cost
- All the equipment's negotiated with 5 years AMC to save future inflations
- Push to procure all VFD base Chillers with chillers optimizations & BMS
- Fulfilled all the documents required for hotel opening.
- 100% LED and EC fans installed
- Property opened with LEED certification GOLD
- FLS audit Brand Standard Audit and FSSAI Audit successfully completed
- Awarded by Marriott and MRG owners for successfully property opening contributions
Director of Engineering - Le-Meridien Gurgaon - Delhi, India
(2018-01 - 2023-04)
- Monitored staff performance and developed improvement plans.
- Streamlined engineering processes through the implementation of automation tools, reducing manual effort and error rates.
- Advised senior management on facilities needs and delivered ongoing operational support.
- Orchestrated the overhaul of legacy systems, modernizing infrastructure without disrupting ongoing business operations.
- Investigated issues impacting organizational operations and service delivery to understand root causes, prepare detailed reports and recommend corrective actions.
- Set up business contracts, obtained signatures and processed paperwork.
- Implemented Automation
- HLP Savings 29% vs 2019 by retrofit projects 100% retrofit LEDs
- STP made 100% operational
- Best well-maintained property in APEC – Recognition by Marriot team 2022
- Maintenance upkeep +21 points since 4.5years tenure 2018 to 2023
- Rectified 90% construction defects and made 100% rooms saleable
- FLS audit Brand Standard Audit and FSSAI Audit successfully completed
Chief Engineer - Courtyard Marriott Chakan Pune - Pune, India
(2015-04 - 2017-12)
- Established proper control procedures and standards to maintain safe, functional machinery.
- Built strong working relationships with other teams, coordinating with relevant personnel to solve complex and deadline-dependent issues.
- Surveyed mechanical systems and equipment to guarantee excellent working order.
- Conducted routine inspections of propulsion systems, identifying and rectifying potential issues promptly.
- Conducted comprehensive risk assessments on key engineering processes, implementing preventative measures to mitigate potential issues.
- Kept equipment in compliance with design specifications and safety standards.
- Collaborated with classification societies and regulatory bodies during audits and inspections, maintaining vessel certification. Demonstrated correct use and maintenance of all types of hand, power and specialized tools, operating safely on daily basis. Provided technical leadership in crisis situations, quickly devising and executing solutions to restore operations.
- Monitored engineering process from conceptual phase through construction, helping to execute projects on time and within budget.
- Kept maintenance logs and confidential records safe on database to enable tracking history, in compliance with privacy regulations. Coordinated and performed routine maintenance on marine vehicles and equipment, identifying and resolving any faults or issues
- Nominee for GEL 2016 (Global Engineering Award)
- Department of the year 2016/2017/2018
- Rectified Heavy leakage by using local supplies which was from pre-opening
- FLS audit Brand Standard Audit and FSSAI Audit successfully completed
- IBR boiler HSD operated converted into PNG Saving of 46% On Fuel.
Assistant Chief Engineer Pre-opening Projects and Operations - Courtyard Marriott International Airport - India
(2010-02 - 2015-04)
- Monitored engine, machinery and auxiliary equipment performance while standing watch. Maintained accurate records of operations completed.
- Carried out measures to prevent or minimize pollution at sea.
- Carried out planned and preventative maintenance for optimum equipment and systems performance levels. Repaired and maintained hydraulic systems, limiting operational downtime and maximizing vessel safety.
- Inspected electrical, hydraulic and mechanical systems.
- Maintained clear understanding of maritime law and compliance requirements affecting operations. Managed level of fuel by reordering at optimal times.
- Reported defective equipment to senior engineers, enabling swift resolution to minimize operational disruption. Trained and mentored junior officers in various aspects of ship operation.
- Utilized comprehensive working knowledge of vessels operations and marine practices and manage engineering demands.
- Coordinated timely repair and servicing of tender engines and winches.
- Applied electrical engineering principles to successfully manage vessel electrical and mechanical systems.
- Led team of engineers in planning, designing, and implementing maintenance strategies for complex machinery, significantly reducing downtime.
- Analyses performance data to identify areas for improvement, leading to the implementation of innovative solutions that improved reliability.
- Conducted in-depth analyses of system failures, identifying root causes and developing long-term solutions to prevent recurrence.
- Successfully added 1 more floor during hotel operational with the shutdown of all the utilities.
- FLS audit Brand Standard Audit and FSSAI Audit successfully completed
- Courtyard Marriott Mumbai Manager of the quarter Year 2012
- Hotel made operational with minimum snagging and sustainable product
Pre-opening Projects and Operations - Mina Seyahi complex - Dubai, United Arab Emirates
(2008-04 - 2010-01)
Le Méridien, Westin, and Beach Resort and Marina Dubai DIMC. Hotel and Resort: Mina Seyahi Complex (Le Méridien, Westin, and Beach Resort and Marina Dubai DIMC) From 1st April 2008 to January 2010 (Pre-Opening Team)
HVAC Engineer - Voltas Ltd. - India
(1997-06 - 2000-02)
Industrial: Voltas Ltd. HVAC Department - June 1997 to February 2000.
- Chiller installation testing and commissioning on Mumbai, Delhi, and Kolkata Navy ship.
التعليم
B-Com - Commerce - Mumbai Kalina University (2002)
B-Tech - Mechanical Engineering (2007-08)
