Nabih Elias Azzam & Partners (L.L.C), Abu Dhabi – UAE Aug 2015 to March 2019
Position: Quantity Surveyor – Mechanical
Projects
- Najmat Tower Abu Dhabi –RR5–C1 – Detailed Design Estimate
- PI Infrastructure at Sas Al Nakhl – Detailed Design Estimate
- Kart Zone – Schematic and Detailed Design Estimate
- Private Beach House (Maiisam) – Detailed Design Estimate
- Al Jimi Mall Phase 2 & 4 Al Ain, UAE - Schematic and Detailed Design Estimate
- PI Support Facility at Sas Al Nakhl – Detailed Design Estimate
- Damac Projects , Damac Navitas, Damac Aykon, Damac Sales Office – Detailed Design Estimate
- Entisar Tower at Sheikh Zayed Road, Dubai – Detailed Design Estimate
- Al Nasser Commercial & Residential Building, Khalifa City A, Abu Dhabi. – Detailed Design Estimate
- Labor Accomodation Plot# 8110203 at Al warsan 3, Dubai. – Detailed Design Estimate
- Construction of L3 Zone at La mer project at jumeirah – Detailed Design Estimate
- Professional Summary (Cont’d)
- Community Center at Saadiyat Island, Abu Dhabi – Detailed Design
- Al Nassem Al Qudra at Al Ain United Arab Emirates – Schematic Design to Detailed Design
- Private villa for Mr. Abdullah Nasser Hwailell at Saadiyat Island Abu Dhabi - Schematic Design to Detailed Design
- Al QANA, Al Maqta Abu Dhabi – Detailed Design
- Wahat Al Zaweya THE SOUQ, Al Faqa’a-Al Ain – Schematic to Detailed Design
- Wahat Al Zaweya Womens Community Centre, Al Faqa’a-Al Ain – Schematic to Detailed Design
Duties and Responsibilities
- Pre-Construction Quantity Take off and Detailed Bill of Quantities for Mechanical, Plumbing and Fire Protection Works.
- Provide Support in Structural, Architectural and Electrical Works whenever needed in order to meet the
Deadline of the submissions.
- Cost Study and Value Engineering.
- Evaluate variation orders from site, as per management.
Duties and Responsibilities
- Providing of schematic estimate on the early stage on tenders.
- Managing all incoming tenders, scheduled deliverables.
- Preparation of Tender Estimate, Bill of Quantities and measure quantity as per tender drawings.
- Checking material quantities of BOQ against consultant issued BOQ
- Pricing the Bill of Quantities.
- Identification of materials not specifically mentioned in the BOQ but included on the scope of works.
- Attending Site Visit, Client Meeting for better understanding of the actual requirements.
- Provide technical clarifications.
- Managing of supplier list.
- Preparation of packages for subcontractor’s / supplier’s
- Coordinating to subcontractor / supplier to get competitive price.
- Preparation of comparison sheet for sub contracts and supplier’s material cost
- Value engineering
- Valuation of sub contract payments, checking of actual installed material base on IFC drawings and ayments.