SWITCHGEAR, ELECTRO MECHANICAL COMPANY | March 2021 – Present
- TAQA-Distribution Project: Designed detailed shop drawings for the supply, installation, and replacement of aging LV 6/8 Feeder Pillars & Service Turrets.
- NOC Coordination & Conflict Management: Prepared detailed conflict drawings and utility layouts for obtaining NOCs from major authorities, including ADDC, du, Etisalat, Tabreed, TWS, and Water departments, ensuring zero-clash infrastructure design.
- Infrastructure for 96 Villas (Qasr Al Jurf): Developed comprehensive electrical infrastructure and housing layouts for a large-scale residential development.
- Al Ain Infrastructure Works (Stages 24, 25 & 26): Drafted electrical service crossings and internal road infrastructure layouts for various municipal areas.
- Primary Substation (Al Shwaib): Generated detailed technical drawings for the installation of a 2x20 MVA 33/11kV Package Unit, including power cable routing.
- Baniyas ER - 11kV Load Transfer: Produced 11kV cable route designs and load transfer schemes for the extension at EB11 PRY1.
AL AJJAJ LIMITED CO. QATAR (AALCO GROUP) | AutoCAD Draftsman | Feb 2016 – May 2019
- Lusail Metro Station, Qatar: Managed detailed layouts for cable trays, lighting, and small power systems.
- Qatar Power Transmission Expansion: Executed detailed cable route designing, coordination layouts, and as-built drawings.
AL JABER & PARTNERS, CONT. CO. | AutoCAD Draftsman | Jan 2014 – Dec 2015
- Irrigation & Infrastructure Projects: Prepared detailed shop drawings for Irrigation Pipe Networks, including pipe routing, valve chamber details, and trench sections.
- Power System Expansion (Phase VII): Handled detailed cable route designing, coordination layouts, and route marker location drawings.
AL BARRAK ELECT. CONT. CO. | AutoCAD Draftsman | March 2007 – Feb 2013
- Detailed cable route designing• Cable coordination layout. Route marker location drawing.
As-Built Detailed cable route Drawing.