Career Objective A position in an engineering and related discipline providing an opportunity to make a strong contribution to the organizational goals through continued development of my professional skills.
NATIONAL PETROLEUM CONSTRUCTION COMPANY (NPCC) (Abudhabi , UAE)
Address : Mussafah , Abudhabi
Position Title : Installation Engineer Heavy Lift and Transport
Period : October 2013 upto present
NPCC, as an established global construction company, provides Clients total Engineering, Procurement and Construction (EPC) services in the development of offshore and onshore Oil and Gas fields for the Arabian Gulf and the regional markets.
NPCC expanded its engineering capability for designing onshore & offshore facilities, loading terminals, storage tanks, pressure vessels and pipelines. Presently, NPCC has over 300 dedicated engineering staff to support the ongoing operations. The design team is fully equipped with latest state-of-the-art computers/softwares to meet engineering challenges.
Mammoet Middle East (Dubai, UAE) – Previous Company
Address : Jebel Ali Free Zone (South)
Position Title : Heavy Lift Engineer
Period : June 2012 upto September 2013
Company Profile :Mammoet Middle East is based in Dubai (UAE) and operates in the United Arab Emirates, Qatar, Oman, Saudi Arabia, Kuwait, Yemen, Jordan, Syria, Lebanon, Bahrain, Mauritius and East Africa. Since 1974 Mammoet Middle East has carried out many prestigious projects in the Gulf region.
Mammoet (s) Pte Ltd Mammoet Romstar Sdn Bhd has been assessed and certified as meeting the requirements of ISO 9001:2000 for the following activities: Commercial, engineering and operation support for provision of transportation and erection of heavy/oversized and general project cargo.
Al Jaber heavy Lift & Transport LLC (Abu Dhabi, UAE) – Previous Company
Address : Mussafah Industrial Area, Abu Dhabi
Position Title : Heavy Lift Engineer
Period : 26th of May 2010 up to 23rd of May 2012
Company Profile: The Company has an integrated quality system designed around the requirements of ISO 9001:2000, ISO 9001, ISO 14001 and OHSAS 18001. Al Jaber Heavy Lift and Transport LLC, a member of the Al Jaber Group, specializes in the full range of lifting and transportation services from hire and trip basis to the execution of totally engineered and managed “factory to foundation” projects comprising marine and overland transportation and erection of cargo at site.
Projects (From 26th May 2010 till present)
Client: SAUDI ARAMCO (SAUDI ARABIAN OIL COMPANY)
The Saudi Arabian Oil Company awarded CRPO for demolition of an existing four (4) Production Platforms (Jackets & Topsides) at Safaniyah offshore field, as well as carrying out Engineering, Procurement, Fabrication, Transportation, Installation, Hookup and Pre-commissioning in Safaniyah field of 4 Slipover Jackets of the 4 Pile Standardized Electrified Design (SSS). These platform jackets will have nine (9) conductor slots, with boat landings along with Risers and J-tubes (for ICCP, Power & Umbilical’s), and will have water depths ranging from 14.9m to 22.3m.
Client: ONGC OIL & NATURAL GAS CORPORATION LIMITED - INDIA The R-12 and R-Series 5 Platforms & Pipeline Project involves primarily works for installation of four (4 nos.) well head platforms, one (1 no.) well head cum riser platform, intra field submarine pipelines for intra field well fluid transportation and for evacuation to Heera. The handling/separation/pumping of well fluid shall be carried out on ONGC hired jack up mobile offshore processing unit (MOPU-by others), which shall be Bridge, connected to existing R-12A platform. The project scope also includes topside modifications on existing R-12A and HRA platforms.
Client: ONGC OIL & NATURAL GAS CORPORATION LIMITED - INDIA
Life Extension of Well Platforms (LEWP) Project (Tender-3) involves primarily works for Decommissioning, Removal and Replacement of existing Topside Decks (along with all facilities except Christmas tree) by New Decks at the following 10 unmanned Well Platforms connected to the five process complexes NQO, MNW, WIN, BHS and SHP in Mumbai High North (MHN) and Mumbai High South (MHS) Fields.
Client: Larsen & Toubro Limited (LTHE
Scope the project is mainly to:
Lifting scope :-
Weight range : 400 Te up to 3800Te
Total number of erection : 20
Jacket Launching : 5800 Te
Client: Zakum Development Company (ZADCO)
Scope the project is mainly to:
Lifting scope:-
Weight range : 60 Te up to 2240Te
Total number of erection : 180
Client: ADMA-OPCO
ADMA-OPCO is developing several new oil fields in its offshore concession areas i.e. Umm Lulu (UL), SARB and NASR (NS). The new program objective is aligned and integrated with ADMA’s corporate strategic objective for the mid-term total sustainable production target of 1 MMSTBOPD.
Package-1:
EPC Package 1 (Six new Wellhead Towers, all risers, infield pipelines, 20” Main Oil Line and Riser Platform Jacket) has been combined with EPC Package 3 (Brownfield Tie-ins and Modifications to EPS Wellhead Tower Platforms WHT-4 and WHT-6) into the Scope of Work, which is now referred to as Package 1.
Lifting scope :-
Weight range : 60 Te up to 2500 Te
Total number of erection : 50
Includes detailed engineering, procurement fabrication, offshore removal & installation of existing/new boatlandings. The services included Refurbishment/Replacement of boatlandings in ZAP, WIP, RP , GG-II, GIP,UTP, PGB, EP & WIP platforms
Shaybah NGL Program (Saudi Aramco Oil Company):
Heavy lifting works at different plants (Pkg#1/2/3/4), divided over 5 locations within a radius of 50 [km].
The project includes a newly build 'NGL plant' (Pkg#1/2/3) and the expansion of 4 'Gas and Oil Separation plants' (Pkg#4; GOSP 1/2/3/4).
The total quantity of the items to be lifted is about 450 [-], concerning; Compressors, Drums, Flare Stacks, Transformers, etcetera.
The weight varies from 50 [Te] up to 1100 [Te] per item.
For the execution of the heavy lifting works, the following cranes will be used:
Client: Pars Oil & Gas Company
Project: South Pars Gas Field Development project Phases 22 ,23 & 24
Location: Assaluyeh, Iran
Lifting scope :-
Weight range : 25 Te up to 494 Te
Total number of erection : 188
Transport and marine scope:-
Weight range : 50 Te up to 250Te
Total number of cargo : 50
Preparing method statement, Job Safety Analyses (JSA) and Task Risk Assessment (TRA), Ground bearing pressure calculation for cranes lifting and rigging activities and stability calculations for transport equipment for the all the transport activities.
The transportation of the two reactors from the Jebel Ali Port to DUBAL and installation of Reactors on to foundation by means of jacking and skidding operation
3.2million USD project
Client: SK Engineering & Construction
Project: Ruwais refinery expansion package -1 (EPC – 1)
Location: Ruwais, UAE
Lifting scope :-
Weight range : 25 Te up to 1,234Te
Total number of erection : 125
Transport and marine scope:-
Weight range : 50 Te up to 1,250Te
Total number of cargo : 397
Anticipated barge trips : 36
Involved in preparing work pack for Lifting and Transportation activities work side by side with SK Engineering & Construction for approval of work pack from client (Takreer and PMC of Jacobs).
Preparing method statement, Job Safety Analyses (JSA) and Task Risk Assessment (TRA), Ground bearing pressure calculation for cranes lifting and rigging activities and stability calculations for transport equipment for the all the transport activities.
Involvement in Erecting 125 Lifts and Transport with category of class 1and 2.Inside the construction Plant.
Worked with the Biggest Crawler cranes in the fleet such as Demag CC8800-1 Twin (3200Te Capacity), Demag CC8800-1 (1600Te Capacity), Demag CC2800-1 (600 Te capacity) ,Demag CC2500-1 (500Te Capacity),Demag 2600 (500Te Capacity),
Demag 2500 (450Te Capacity),Demag CC2500 (450Te capacity),Hitachi SCX2800
& SCX1200.Equipment includes small crawler and Telescopic crane ranging from 50Te to 250Te Capacity.
Worked with transport activities of modules and Heavy long Column inside a construction
Plant (max.94.0m length and 11.0m Dia and the weight of 1,250Te (The world heaviest crude column). Equipment involved are SPMT 3rd Generation, Commetto Trailers, Flat bed & Lowbed
Trailers with Prime movers.
Involvement in Site survey and Transportation of Heavy long column and Modules from outside main road and inside plant and erecting the vessel onto the foundation using
3200 Te Crawler crane
Lifting and installation of Motors, compressors, Transformers, pressure vessels and also erecting of flare stack
The removal and re-installation of various vessels weighing from 10 Te up to 66Te The job also involved jacking, skidding and transportation tasks.
Topaz Engineering ADYARD.
Conventional trailers and landing craft.
SK Engineering & Construction) –Ruwais-UAE.
LANGUAGES KNOWN:-
● ENGLISH (speaking, reading, writing).
● HINDI (speaking, reading, writing).
● MALAYALAM (speaking, reading, writing).
● TAMIL (speaking).
I consider myself familiar with the Mechanical Engineering aspects and am confident of my ability to work in a team. I hereby declare that all the information provided is true to the best of my knowledge.
Professional & Academic Qualification
Graduation: B. Tech in Mechanical Engineering, From Calicut University, Kerala, India.