Senior Mechanical Site Engineer June2022-Present
Sky International Technical Work L.L.C, Dubai, UAE
Project Title:(4B+G+44F+MECH+R) Residential and Commercial BuildingLocation:Spiral Tower at Al Sufouh, DubaiPeriod:June 2022-PresentResponsibilities:
- Prepared builders’ and shop drawing layouts for drainage and water supply as per the DEWA and DM regulations
- Proposed modification to the approved design drawing with calculations resulting in a 15% project cost reduction for consultant approval
- Executed: floor-by-floor limitations (quantity take-off) that reduced approximation needs and iterations
Project Title:
(G+5P+30F+MECH+R) Residential and Commercial Building Location:6 Creek Towers at Ajman, UAEPeriod:September 2022-PresentResponsibilities:
- Performed all plumbing calculations and designed the schematic drawings (line diagrams) for the towers
- Produced the drawings for the consultant for the approval of the Drainage and Water Supply NOC
- Assisted in the tender submission by pricing the plumbing works for the project based on the schematic design
Senior Mechanical Site Engineer July 2018-June 2022
Flamingo City Building Contracting L.L.C, Dubai, UAE
Project Title:(UG+G+3P+19F+R+UR) Residential and Commercial BuildingLocation:Al Nahda, DubaiPeriod:November 2021-June 2022Status:The project is currently in the design stage.Project Title:(UG+G+3P+10F+R+UR) Residential and Commercial BuildingLocation:Al Jaddaf, DubaiPeriod:Dec 2020-Oct 2021 Responsibilities:
- Improved teamwork efficiency by 25% by making the plumbing design as simple as possible.
- Decreased 10 to 15% wastage by frequent housekeeping and effective utilization of materials
- Monitored HVAC and firefighting subcontractors’ installations based on the progress of work at the site
Project Title:
(UG+G+3P+11F+R+UR) Residential and Commercial BuildingLocation:Al Jaddaf, DubaiPeriod:December 2019-December 2020Responsibilities:
- Utilized huge quantities of dead stock available at the store by performing minor modifications in the plumbing design
- Achieved all works according to contract specifications, approved design drawings, and method statements
- Calculated, verified, and submitted HVAC and firefighting subcontractor bills
Project Title:
(UG+G+2P+9F+R+UR) Residential and Commercial BuildingLocation:Muhaisnah, DubaiPeriod:July 2018-December 2019Responsibilities:
- Invented a new method of installation of the sleeves on the slab, resulting in 80% material and labor cost savings
- Monitored the store stock inventory repeatedly before the placement of material requests to avoid excess quantities
- Resolved unexpected technical difficulties that might arise frequently during work
Mechanical Site Engineer May 2015-Jun 2018
Envicon Emirates (Nael and Bin Harmal Group), Abu Dhabi, UAE
Project Title:Saadiyat Beach Apartments Location:Saadiyat Island, Abu DhabiPeriod:February 2017-June 2018Responsibilities:
- Ordered or purchased all the long lead items in a timely and cost-effective manner
- Trained on-site plumbing installation methods and techniques for team members
- Developed drawings required for fabrication of all plumbing items like catch basins, sand traps, etc.
Project Title:
Al-Shuaiba Residential Complex 162 Villa by MusanadaLocation:Al-Shuaiba, Al AinPeriod:May 2015-February 2017Responsibilities:
- Raised inspections, site daily reports, estimates, and all applicable monitoring reports are given regularly
- Carried out regular inspections for all plumbing activities
- All the water and sewage lines installed were inspected and tested for leak-free joints