محمد عبدالله
Survey & BIM Technical Office Specialist
استعن بخدماته
اطلب عرض سعر بدون التزام
نبذة
Technical Surveying and Engineering Drawing Specialist with more than 25 years of experience in technical office management, oil&gas projects, infrastructure works, and large-scale construction projects across Egypt and Saudi Arabia. Strong expertise in surveying operations, engineering drawing preparation, reviewing technical layouts, and supervising multidisciplinary site activities. Highly skilled in preparing Shop Drawings and As-Built Drawings according to approved engineering standards and project specifications.
Proven ability to coordinate between project departments, resolve technical conflicts, and maintain high execution accuracy during all project phases. Successful track record in delivering strategic and national projects in cooperation with international consultants and governmental authorities.
الخبرة
Technical Office Survey Manager - Petrojet - Gahdam – Manfalut – Assiut, Egypt
(2019-02 - 2026-05)
Hydrocracking Project – Gahdam – Manfalut – Assiut | For ANOPC under Tecnimont Italy Supervision
- Achieved more than 98% accuracy in reviewing surveying works and engineering drawings, reducing execution conflicts during construction phases
- Managed all surveying technical office activities and reviewed execution drawings according to approved technical specifications
- Supervised surveying operations and determined coordinates and elevations for industrial facilities and equipment
- Prepared and reviewed Shop Drawings and As-Built Drawings while coordinating with different departments to ensure execution accuracy
- Followed up field activities and resolved technical clashes before implementation on site
Head of Technical Surveying&Engineering Drawing Department - Petrojet - Ain Sokhna Port, Egypt
(2016-05 - 2019-02)
Phosphate Export Facilities Project – Ain Sokhna Port | Military Authority Project
- Contributed to accelerating technical approvals by 15% through improving review and coordination procedures
- Prepared surveying layouts and execution drawings for roads, utilities, and piping systems
- Reviewed civil and infrastructure works to ensure compliance with approved engineering drawings
- Coordinated with site teams and monitored project execution according to scheduled timelines
- Prepared technical reports covering work progress, modifications, and project status updates
Head of Technical Surveying&Engineering Drawing Department - Petrojet - Al Shatt – Ismailia, Egypt
(2014-03 - 2016-05)
Strategic Project for 12 Petroleum Storage Facilities – Al Shatt – Ismailia | Military Authority Project
- Improved surveying and technical office efficiency by 20% through organized planning and workflow management
- Supervised surveying and setting-out activities for petroleum storage facilities and industrial structures
- Prepared and reviewed longitudinal and cross sections for roads, pipelines, and civil works
- Followed excavation and backfilling activities and performed quantity calculations according to execution drawings
- Prepared final As-Built Drawings based on actual site modifications and completed works
Survey Specialist - Petrojet - Suez, Egypt
(2013-02 - 2014-03)
New Suez Canal National Project
- Maintained 100% surveying accuracy without significant deviations during execution stages
- Executed surveying works and controlled axes and elevations using advanced surveying equipment
- Monitored excavation and backfilling activities according to approved coordinates and technical requirements
- Prepared daily surveying reports and coordinated with execution teams on site
- Reviewed field measurements and ensured compliance with engineering specifications and project drawings
Survey Specialist - Petrojet - Yanbu, Saudi Arabia
(2012-01 - 2013-02)
Oil Storage Renovation Project – Yanbu – Saudi Arabia | Luberef Company under Saudi Aramco Supervision
- Maintained full compliance with Saudi Aramco surveying standards and project requirements
- Performed surveying and setting-out works for oil storage facilities and industrial structures
- Reviewed pipeline layouts and industrial utility drawings to ensure engineering accuracy
- Prepared final As-Built Drawings according to actual project execution
- Determined equipment locations and monitored installation works according to engineering plans
Survey Specialist - Petrojet - Gabal El Zeit – Red Sea, Egypt
(2010-05 - 2012-01)
Bahrania&Al Amal LNG Station Project – Gabal El Zeit – Red Sea
- Reduced surveying errors by 18% through continuous technical follow-up and monitoring activities
- Executed surveying works for LNG stations and industrial facilities
- Prepared longitudinal and cross sections for utilities and pipeline systems
- Reviewed execution drawings and coordinated implementation activities with work teams
- Verified elevations and coordinates to ensure accurate field execution
Survey Specialist - Petrojet - Romana – Sinai, Egypt
(2008-07 - 2010-05)
LNG Station Project – Romana – Sinai | NESPCO Petroleum Company
- Improved field execution efficiency through continuous updates of technical drawings
- Executed surveying and setting-out works for station facilities and associated utilities
- Prepared and updated execution drawings according to project modifications
- Followed up field works and ensured compliance with approved engineering drawings
- Participated in resolving technical and surveying issues during execution stages
Survey Specialist - Petrojet - Port Said, Egypt
(2006-04 - 2008-07)
Oil Storage Renovation&Replacement Project – GABCO Fields for Petrobel – Port Said
- Achieved high accuracy levels in coordinates and elevations for petroleum facilities during project execution
- Executed surveying works for civil structures, pipelines, and industrial facilities
- Reviewed coordinates and elevation data related to equipment, tanks, and utility systems
- Prepared execution drawings and required modifications according to field activities
- Coordinated with different departments to resolve technical and surveying issues on site
Survey Specialist - TabarakGroup - Egypt
(2002-02 - 2006-03)
Contributed to implementing residential and tourism projects according to approved engineering plans
- Participated in constructing Fantazia Resort Chalets – Ras Sedr
- Participated in developing Janat 1&2 Projects on Cairo–Alexandria Desert Road
- Executed surveying and setting-out works for civil and architectural projects
- Followed project execution and verified elevations and coordinates according to technical drawings
Survey Specialist - Talaat MostafaGroup - Cairo, Egypt
(2001-03 - 2002-02)
Participated in planning and executing large-scale residential projects with high engineering accuracy
- Worked on Phase 3 of Al Rehab City Project
- Participated in planning Madinaty City – Cairo
- Executed surveying and setting-out works for residential and infrastructure facilities
- Reviewed engineering drawings and coordinated with project teams during execution stages
Survey Specialist - Nile General Company for Roads - Egypt
(2000-07 - 2001-03)
Contributed to implementing desert road projects according to technical specifications
- Participated in constructing Assiut–Sohag Desert Road
- Executed surveying works and determined road axes and elevation levels
- Prepared longitudinal and cross sections for road construction activities
- Followed excavation and backfilling works while maintaining coordinate accuracy
التعليم
Surveying Sciences - Technological Institute of Surveying Sciences – Assiut (1999 - 2000)