WORK EXPERIENCE:
1- Nass Contracting – BAHRAIN • May-2017 – June-2022
Sr. Civil Engineer (Bridge, Road, Structure, Building, Infrastructure)
Sh. Jaber Highway Upgrade, Alba & Nuwaidrat Interchanges Project at 52.08 Million BD, Al Fateh Highway upgrades Project at 40.5 Million , Bapco Modernization Programme (BMP) at 4.1Billion King Faisal Corniche Development Bahrain: Substructure Works Package (Stage 1 works) at 3.7 Million
South Bahrain Loop Road (SBLR) Stage 2 (Package A) at 13 Million BD
Client: Ministry of Works, Roads Project Municipalities Affairs & Urban Planning
Consultant: Parsons Global Services Limited, MSCEB
ROLE AND RESPONSIBILITY:
- Managed projects construction site with proper Planning, budgeting, scheduling, cost control, and resource allocation. Oversaw the construction 06nos Bridge (Pilling, Pile cap, Girder-Post tensioning/cable stressing, grouting) LT-TURN (550M), U- TURN (100M), HAWAR Interchange (405Mx2Lane) and JABER Bridges of (275Mx2Lane) Interchange, Structures, Infrastructure works and Pumping Station.
- Managed projects of Buildings (Foundations, Column, Landscaping work), Finishing work external facilities of a building and hard landscaping works, execution of all structure works such as concrete, formwork, and reinforcement.
- Managed projects of Road works (cutting & Embankment filling), Sub base, Road Base.
- Drainage work and Utility drawing as per approved grading plan, profiles surfaces, alignments, templates, pipe network, Installation of ducts & gullies and styles associated with each as per Technical specifications and Quality control.
- Provided technical and professional engineering support services in design, construction drawing, and specifications before construction.
- Responsible for necessary and reviewed contract shop drawings with approved plans & specifications prior to construction. Also prepared of BBS for all types of structures (Pile, Pile cap, Pier/Column, Box Girders, Slab) and detail working drawings of 468 Nos Piling, 50 Nos. Pile cap, 62 Nos. of Piers/Abutment, 47 Nos of Box Girder and Slabs, Web Post Tensioning Profile, Stressing, Grouting and POT Bearing.
- Responsible of day-to day Site Management as per program and coordination of the technical and engineering activity. Prepared Wastage report, 3 weeks look ahead programmed, monthly progress reports and subcontractor bill certificate verification.
- Responsible for all activity final inspection with client, consultant and ministry for preparation of final billing also prepared as built drawing.
- OIL & Gas – Preparation and Responsible for the requirement PTW approval MS/RAMS and coordination with BAPCO, TATWEER PETROLEUM, ALBA FACTORY.
- All the safety measure for the progress has been monitoring, conducting weekly Safety tool box as per HSE Standard. Oversaw quality control and health and safety matters for construction teams
- I have completed projects for leading organization. I led the construction team and drive quality and cost efficiencies.