Pular para o conteúdo principal
Wagner Tahan

Wagner Tahan

Mid-level TX/RX Operations and Maintenance Analyst

Talento
Uberaba, MGMembro desde 26 de julho de 2026
SIAE MW SystemsPadtec DWDMSite acceptance documentationHuawei End-to-End process
·

Contratar esta pessoa

Envie uma proposta de trabalho diretamente para este candidato

SIAE MW SystemsPadtec DWDMSite acceptance documentationHuawei End-to-End process

Sobre

To work as a coordinator and project inspector in the telecommunications sector and related fields, aiming to expand my knowledge and that of my team, adding value to the company and fostering mutual growth, while maintaining a leadership-oriented focus on quality in telecommunications service delivery.

Experiência

Mid-level TX/RX Operations and Maintenance Analyst - Icomon Tecnologia LTDA - Uberlândia Regional, Uberaba Base – MG

(2019-08)

Work involving site inspections, corrective and preventive maintenance on transmission systems, and oversight of deployment project acceptance.

  • Huawei WL Systems (2G, 3G, 4G, and 5G)
  • Huawei, NEC, Ericsson, and SIAE MW Systems
  • Huawei Metro Low-Capacity Systems
  • Ciena and Padtec DWDM
  • Nokia HL04, Cisco HL05
  • Coordination of 3G/4G and MW installations (Nextel New Locations)

Project Coordinator - Simprotel Telecomunicações LTDA - Curitiba – PR

(2017-03 - 2019-01)

Coordinating new 3G/4G installations and network expansions

  • Coordination of 4G installations (Nokia LTE700 project)
  • Coordination of 3G/4G and MW installations (Nextel New Locations)
  • Coordination of site decommissioning and reconfiguration (Nextel 2G/3G/MW)
  • Preparation of site acceptance documentation
  • Coordination of 3G/4G installations (Huawei WCDMA/LTE700 project)
  • Coordination of MW installations (Huawei project – Claro, TIM, Vivo)

Project Analyst – MW Infrastructure Requirements - Randstad Brazil (Accenture) - Curitiba – PR

(2016-07 - 2016-12)

  • Analysis of site documentation and EV (Earned Value) analysis to trigger TSSR; SCI control for site-sharing requests
  • TIM Site Acceptance Analysis of documentation and site acceptance (2G, 3G, and 4G)
  • Tracking acceptance status, vendor meetings, and planning for site cleanup activities

Project Coordinator - Huawei Serviços do Brasil - Curitiba – PR

(2013-09 - 2016-05)

Coordinating new 3G/4G installations and capacity expansions

  • Coordination of 3G and 4G installations (TIM project)
  • Coordination of 3G and 4G refarming installations (TIM)
  • Coordination of 3G and 4G installations (VIVO project)
  • Coordination of 3G and 4G installations (Claro project)
  • Cleanup and acceptance of 3G and 4G sites (TIM and Vivo)

Quality Auditor - Altran Technology - São Paulo – SP

(2012-09 - 2013-09)

Auditing 3G and Microwave (MW) site quality (Nextel – SP)

  • Verifying installation and infrastructure quality of existing sites (APM30, radios, etc.)
  • Verifying the quality of installation, acceptance, and cleanup teams
  • Conducting training for field teams facing technical or quality-related challenges
  • Evaluating the performance of MW and 3G teams before and after training

Installation Coordinator - Altran Technology - Curitiba – PR

(2011-06 - 2012-09)

Coordination in the WLL area for TIM 2G and 3G projects (Swaps and New Sites) – PR and SC regions

  • Swaps and site acceptance for TIM/Huawei GSM (PR, SC)
  • Swaps and site acceptance for TIM/Huawei UMTS (SC)
  • Deployment of new TIM/Huawei GSM sites (PR, SC)
  • TIM/Huawei TRX expansion (PR, SC)

Installation Coordinator - ENSEL Engenharia - Brasília – DF

(2010-07 - 2011-06)

Coordination in the WLL area for Claro 3G projects and Oi 2G/3G projects (Swap and New Sites) across the DF, GO, MT, MS, RO, and TO regions.

  • Expansion, swaps, and acceptance of Oi/Huawei GSM sites
  • Deployment of Huawei 3G systems for Oi in the Central-West region
  • Deployment of Huawei 3G systems for Claro in the Central-West region
  • Acceptance and activation of RETs (Remote Electrical Tilts)
  • Utilization of the Huawei End-to-End process

Installation Coordinator - Huawei do Brasil - Belo Horizonte – MG

(2009-06 - 2010-06)

Coordinated the Vivo GSM and 3G project for the Vivo MG network, focusing on deployment, integration and acceptance.

  • Expansion, swaps, and acceptance of GSM sites
  • Deployment of Huawei 3G systems in the Triângulo Mineiro region
  • Deployment of indoor 3G networks (shopping malls) in the Triângulo Mineiro region

Installation Coordinator and Field Inspector - Huawei do Brasil - Porto Alegre – RS

(2007-10 - 2009-06)

Coordinated infrastructure and installation for the entire Vivo GSM network in Rio Grande do Sul (phases 6, 7, and 8; Anatel sites). Worked as a field inspector, overseeing teams responsible for installation, optimization, and VSWR troubleshooting/remediation.

  • Huawei-Vivo Project – Rio Grande do Sul – Coordination of infrastructure and GSM equipment installation
  • BTS activation, TRX expansion, and installation supervision

Installation Supervisor and Team Lead - Hard Projetos e Telecomunicações - Uberlândia – Minas Gerais

(2005-03 - 2007-10)

Supervised and led teams during the installation, acceptance, and cleanup phases of various projects.

  • Nokia-Oi Project – Triângulo Mineiro region – 2nd BTS and NUSS expansion
  • Ericsson-Telemig Project – Eastern Minas Gerais – Resolution of outstanding issues and acceptance
  • Ericsson-Telemig Project – Western and Eastern Minas Gerais – Sector and cabinet expansion
  • Huawei-Telemig Project – Minas Gerais – Installation, integration, and acceptance
  • Huawei-CTBC Project – São Paulo – Resolution of outstanding issues and acceptance
  • Huawei-Oi Project – Minas Gerais – Installation, integration, and acceptance
  • Nokia-Claro Project – Federal District – Equipment swap (Alcatel to Nokia), installation, and swaps
  • Nokia-Claro Project – Mato Grosso – Equipment swap (Alcatel to Nokia), installation, and swaps

Installation Coordinator - UNA Projetos e Telecomunicações - Uberaba – Minas Gerais

(2003-05 - 2005-03)

Worked in structured cabling, radio-link installation, and site surveys; coordinated 8 field teams for GSM network installation.

  • Structured cabling for the Uberaba administrative center
  • Site survey for the integration of the São José do Rio Preto school network via radio link to CPQD (Campinas)
  • CTBC – Huawei Project – Triângulo Mineiro region
  • OI – Nokia Project – Triângulo Mineiro region
  • Coordination of infrastructure and installation of CTBC base stations (ERBs) – Minas Gerais

Installation Manager - Digisat Telecomunicações - Uberaba – Minas Gerais

(1998-06 - 2003-05)

Managed and installed satellite transmission equipment, as well as radio access (microwave) infrastructure and equipment.

  • Projects involving the installation of point-to-point, point-to-multipoint, and VSAT radio links (Clients included Embratel, Satipel, Bunge, Correios, Rede Globo, Prossegur, Federal Highway Police, ADM, Terra Network, among others)

Formação

Bachelor - Information Technology Management - Cruzeiro do Sul University

Competências

Mid-level TX/RX Operations and Maintenance Analyst

Avaliações