General Laborer - MARTINREA INDUSTRIAL - Vaughan, ON
(2026-03)
- Operated machinery for assembly and production line tasks to meet daily output goals.
- Maintained workplace safety protocols, ensuring compliance with industry regulations.
- Assisted in inventory management, facilitating accurate tracking of materials and supplies.
- Collaborated with team members to optimize workflow efficiency and reduce downtime.
- Conducted quality inspections on finished products to uphold company standards.
- Loaded, unloaded, and moved material to and from storage and production areas.
General labourer - LULULEMON - Mississauga, ON
(2025-09 - 2026-02)
- Picking customer / store orders
- Packing products (clothing, accessories)
- Processing outbound shipments
- Receiving inventory, returns, and damaged goods
- Maintained cleanliness and organization of workspaces to ensure compliance with safety standards.
General Labourer - METRO LOGISTICS - Mississauga, ON
(2025-07 - 2025-09)
- Accurately check, gather, verify and prepare products and orders
- Unload, inspect, and securely store items in their proper locations
- Lift and move heavier products _ perform repetitive bending, lifting, and standing
- Maintain and keep the warehouse clean, safe and organized
- Assisted team members in executing daily tasks, fostering collaboration and productivity.
Pipe Fitter Underground and IT Operator - MINING TOOLS (AngloGold Ashanti Mine redevelopment Project) - Obuasi, GHANA
(2022-09 - 2025-01)
- Operated IT for underground services.
- Maintained a clean, safe work area and adhered to safety procedures
- Assembled and installed mining equipment according to technical specifications.
- Conducted routine inspections, identifying and resolving mechanical issues promptly.
- Collaborated with engineers to improve installation processes for enhanced efficiency.
- Followed safe work practices, which included fall protection and personal protective equipment.
Pipe Fitter Underground and IT Operator - WAYOE ENGINEERING & CONSTRUCTION (SMPP Project, Newmont Goldcorp) - Kenyasi(Ahafo), GHANA
(2020 - 2022)
- Operate IT for ventilation works.
- Installed, alligned, and secured various piping systems in underground
- Performed hydrostatic pressure testing and leak checks
Pipefitter - WAYOE ENGINEERING & CONSTRUCTION (Dry Mining 2 Project Sierra Rutile) - Sierra Leone
(2019-01 - 2019-05)
- Installed and maintained piping systems in compliance with project specifications and safety standards.
- Conducted inspections to ensure system integrity, identifying and resolving potential issues proactively.
- Collaborated with cross-functional teams to streamline installation processes and enhance workflow efficiency.
- Trained junior pipefitters on best practices for installation techniques and safety protocols.
- Developed strategies for troubleshooting complex piping systems, reducing downtime during operations.
Pipe Fitter - GROUP FIVE CONSTRUCTION LTD. (Combination Project, AngloGold Ashanti) - Siguiri, GUINEA
(2017-05 - 2018-12)
- Read and interpreted isometric drawings and P&ID
- Performed pressure testing, pipe threading, and welding preparations
- Mentored apprentices and collaborated with foremen to meet project deadlines
- Fabricated and installed piping systems in accordance with project specifications and safety standards.
Pipe Fitter - GROUP FIVE CONSTRUCTION LTD. (Husab Project Joint Venture) - Swakop, NAMIBIA
(2015-11 - 2016-05)
- Installed and maintained piping systems
- Assisted welders and supervised apprentices
- Ensured strict compliance with site safety protocols
- Installed and maintained industrial piping fittings, valves, flanges and clamps to complete systems setup.