Driller at Foundation West Construction (2022-04 – 2024-02)
My knowledge of drilling with Ranger drilling and MC28, MC22, MC15, MC14, MC08, and Ho Drilling. For piles and anchors from 1" to 16" Diameters.
- Implement innovative drilling techniques to improve efficiency and accuracy on construction sites, leading to cost savings and timely project completion.
Core Driller at Earthdrilling (2020-08 – 2022-04)
- Oversaw crew of [Number] team members carrying out drilling, rig moving and day-to-day operations.
- Adhered to corporate and job site safety procedures to protect personnel and equipment.
- Prepared timely and accurate logs and field reports to help management make accurate decisions about ongoing operations.
- Trained crews on drill work procedures and safety.
- Connected sections of drill pipe using hand tools and powered wrenches and tongs.
- Observed pressure gauge and moved throttles and levers to control speed of rotary tables and regulate pressure of tools at bottoms of boreholes.
- Removed core samples during drilling to determine nature of strata being drilled.
- Installed monitoring wells, piezometers and inclinometers to support rig operations.
- Used test borings to collect, handle and log soil and rock samples and submitted for further analysis to identify critical concerns.
Core Driller (Sonic) at Boartlongyear (2009-10 – 2019-03)
- Oversaw crew of [Number] team members carrying out drilling, rig moving and day-to-day operations.
- Adhered to corporate and job site safety procedures to protect personnel and equipment.
- Prepared timely and accurate logs and field reports to help management make accurate decisions about ongoing operations.
- Trained crews on drill work procedures and safety.
- Connected sections of drill pipe using hand tools and powered wrenches and tongs.
- Observed pressure gauge and moved throttles and levers to control speed of rotary tables and regulate pressure of tools at bottoms of boreholes.
- Removed core samples during drilling to determine nature of strata being drilled.
- Installed monitoring wells, piezometers and inclinometers to support rig operations.
- Used test borings to collect, handle and log soil and rock samples and submitted for further analysis to identify critical concerns.
- Implement innovative drilling techniques to improve efficiency and accuracy in core drilling operations, staying up-to-date with industry trends and technologies to maximize productivity for Boartlongyear.