Electrical & Instrumentation Engineer - M/s. Powerica Ltd. - Mumbai
(2012-03)
- I am mainly looking for the construction activities of the power plants.
- I have done the pre commissioning and commissioning of the power plants.
- Installation of the electrical and instrument cable tray, junction box as per Drawing.
- Cable pulling and cable tracing both instrument and electrical site.
- check panel wiring, loop checking and coordinate with vendors.
- Instrument installation as per drawing.
Electrical & Instrumentation Engineer - M/s. Contemporary Target Pvt. Ltd. - Vadodara
(2009-12 - 2012-02)
- Looking for the tooth brush plant operation and maintenance.
- Responsible for the production and breakdown of plant.
- I was working on molding machines, tufting machines and CNC machines.
- Working on Air compressor and DG-Sets.
- Fault finding of machine for both of electrical and instrument side.
- Handling the labors and making planning schedule to maintenance.
Instrumentation Engineer - M/s. Al hugayet Contracting Est. - Saudi Arabia
(2009-03 - 2009-11)
worked in Saudi Arabia for prestigious project of king Abdullah University of science and technology the project is under control of Saudi Aramco our company supplies man power for this project to The Saudi Aramco. We directly reported to Aramco.This project area Is 9,000 acre and project cost is billion dollars.
- I am mainly looking for commissioning and pre commissioning activities On the site for building management system. I was coordinating with the Contractor for commissioning activities and gave him to punch list for errors. Was checking the entire instrument fitted as per drawings.
- Also worked on the fire alarm panel of Simplex and get commissioning out Of Public alarms systems as per drawings and standards. We checked Detector, Duct detector, fire dampers for all buildings. We also checked the Condition of fire damper close and open in case of fire and submit the Reports of testing and punch list to our in charge.
- checked the chilled water system and its instruments like Temperature Gauge, Pressure gauge, NRV and chilled water panel with it's I/OS. Loop checking of instruments. Also commissioning the solar system and its Panel I/OS.
- Worked on AHU and commissioning the panel and it's I/O. Loop checking For instruments.
- involved in all the commissioning and pre commissioning activities of all Building management systems.
Instrument foreman - M/s. Dodsal Engineering pte.Ltd. - Qatar
(2008-04 - 2008-08)
I was working in the prestigious project in the Ras laffan industrial city Ras Gas on shore expansion of train 6 &7 in Qatar. Dodsal is a sub contractor Of CTJV. (Chiyoda Tecnip Joint Venture)
- I take all the Safety Training conducted by Ras Gas, Ctjv and Dodsal. Like 100% tie up, confined space, heat stress, electrical Hazardous, H2S Training, Height training and Fire watches safety.
- Passed Ras Gas PTW and work as a foreman and allow filling permit for Cold and Hot work and supervise the all area.
- We follow all the Safety rules.
- I was worked in pipe rack area with my team it is hazardous and critical and need very safety for fire and leakage of H2S. I makes cable tray for Instrument and electrical for communication cable pulling, cable tracing In the pipe rack area.
- I also fitted instrument in the pipe rack area carefully. Work in a chemical Area, Sulphere area, Refrigeration area and ETP area.
- Control room, substation area makes cable tray, cable pulling and Junction box installed. Pressure gauge, Temperature gauge, Differential Pressure Transmitter, Level gauge and other instruments installed and Calibrated as per drawings. Read instrument drawings and plot plans.
- Daily submitted the site progress report and manpower report.
- Handling 20 person team and responsible to manpower and progress of Site.
- Filling hot work permit and cold work permit for requirement of site work.
- Punch list cleared given by Quality control department.
- Store items and other instruments checklist given to the site in charge.
Shift Engineer Electrical & Instrumentation - M/s. Goltens India pvt. Ltd. - Mumbai
(2007-05 - 2008-04)
- I am mainly looking for preventive and Breakdown maintenance of the plant.
- I worked with SLC 5/05 Allen Bradley makes & computerized monitoring SCADA system.
- Familiar with VCB Breaker (11 kV), 2.5MVA Transformer.
- Sound knowledge of Auxiliaries of DG-Set like FOPX/LOPX Separators, Cooling tower, Plate type Heat Exchangers, Air compressors.
Shift Engineer Electrical & Instrumentation - M/s. Powerica Ltd. - Mumbai
(2001-01 - 2007-04)
- I have the commissioning of DG-Set MAN B&W Holeby make of capacity 3.8 MW.
- I am mainly looking for the preventive and Breakdown maintenance of the Plant.
- I am also familiar with Synchronization of the DG-Set with Grid (11 kV &33kV).
- Worked with SLC 5/04 Allen Bradley makes &computerized monitoring SCADA System.
- Familiar with MicroLogix 1200, Panel view 300, SFC Breaker (11kV &33kV), VCB Breakers, 500 KVA & 5000 KVA Transformers.
- Well Knowledge about induction motors, Sensors, Transmitters, Pressure switches.
- Sound knowledge of Auxiliaries of DG-Set like FOPX/LOPX Separators, Cooling tower, Plate type Heat Exchangers, Air compressors etc.
Electrical & Instrumentation Engineer - M/s. Videocon Narmada Glass Ltd. - Bharuch
(1999-09 - 2000-08)
- Mainly concerned with preventive & Breakdown maintenance of TV Glass shell plant.
- Knowledge of maintenance of AC & DC motors, Limit switches, proximity -Switches, Solenoid valves and Photocell etc.
- Familiar with AC & DC Drives, PLC 5/25 Allen Bradley and Computerized System SCADA.
Electronics Engineer - M/s. Eata Electronics - Mumbai
(1998-04 - 1999-08)
- Handled the turnkey projects & also providing services to the customer and sales of Electronics range of product instruments for Mumbai region.