SENIOR DRILLING ENGINEERING MANAGER at UGV (UKRGASVYDOBUVANNYA) (2022-10 – 2023-03)
- I Managed Integrated Project Strategy to design horizontal wells at Dnieper Donets basin, Ukraine. Yablunivska 450 and Kernosivska 3, HPHT high risk wells.
- I Managed Geo-mechanics risk strategy for complex tight gas wells design at Dnieper Donets basin.
- I Managed BOD - Drilling Programs for horizontal wells. Advance Directional Drilling planning had been considered to achieve objectives. (DD, RSS, real time). Defined KPI's to be achieved.
SENIOR DRILLING ENGINEERING MANAGER at UGV (UKRGASVYDOBUVANNYA) (2019-09 – 2022-02)
INDEPENDEN CONTRACTOR FOR UGV
- As an engineering manager I created BoD for Buzivska, Slovyanska & Bogatoyska fields – UGV Horizontal wells project, advance directional drilling technology was considered for this project. (RSS)
- Engineering Manager for major reentry project (27 wells) – UGV sidetrack project.
- I Leaded Geo-mechanics risk strategy for complex tight gas wells at Dnieper Donets basin.
ENGINEERING MANAGER at GSP OFFSHORE (GROUP SERVICES PETROLEUM) (2017-12 – 2018-09)
- I Created Integrated Project Engineering Management bases for Epsilon Project, ENERGEAN offshore in Greece (Drilling and Completion).
- As an engineering manager leaded Kusey Marmara tender, offshore BOTAS Project in Turkey. Including advance directional technology drilling and completion for; 2 appraisal wells and 18 injector wells, plus 5 workovers.
PRINCIPAL, DRILLING & COMPLETION ENGINEERING at SCHLUMBERGER-IPM (2013-01 – 2016-04)
- I Managed upstream services and ensured client's needs were achieved as per their goals and objectives by developing new opportunities for well construction projects and generating and coordinating project business opportunities for all stage holders.
- I Led Drilling, Completion, and surface facilities performance, KPI's to improve business and operations efficiency and generate new contract models for: PDVSA, Rosneft, Chevron, ENI.
- I Led advance directional drilling technology application to achieve horizontal client objective's; Geosteering, RSS, MeshRite, perforated pipe, expandable screens, steam injection.
PROJECT ENGINEERING MANAGER at SCHLUMBERGER IPM (2011-01 – 2013-01)
- I Led first dewatering project management for wells construction in igneous environments.
- I Led Integrated project Management Oil & gas set up for mining projects.
BUSINESS DEVELOPMENT MANAGER at SCHLUMBERGER IPM (2010-01 – 2011-01)
- I Managed new business opportunities for geothermal development for; ENEL, ENAP, Hot Rock, Mulpun Energy, Magma Energy, Geoglobal Energy & Energia Andina.
- I Led Geothermal Drilling wells - model planning & Execution. GeothermEx.
- I Managed the strategy to rescued 33 miners trapped in San Jose Atacama Chile.
ENGINEERING MANAGER at SCHLUMBERGER WATER SERVICES (2009-01 – 2010-01)
- I Drilled 10 Carnalita Salt Wells at around 1200 meters (Vale Project – Carnalita).
- I Led vertical and directional well construction to recover Commercial Brine Dow Quimica – Brine (Wells – Mataradiba Isla, Vera Cruz & Bahia).
- I Managed well construction to recover Commercial Brine (Braskem – Brine Wells).
- I Led horizontal dewatering well. (Carajas Mining District - Dewatering Horizontal Wells).
PRINCIPAL DRILLING & COMPLETION ENGINEERING at SCHLUMBERGER IPM (2006-01 – 2009-01)
- I Managed well construction engineering for all tenders in Mexico and Central America. We got 7 Mega projects consisting over more than 1800 wells: Burgos 4 (300 gas wells), Burgos 5 (350 gas wells), Burgos 7 (400 gas wells), Chicontepec II &III (500 wells heavy oil), ATG I & II (300 wells heavy oil) by managing a team for complex multiservice.
GEOMECHANICS MANAGER at SCHLUMBERGER IPM (2005-07 – 2006-01)
- I Developed, managed and implemented geo mechanics for Hot Rock geothermal drilling project, at Bellhiem exploration basin, at Karl's rue.
ENGINEERING MANAGER at SCHLUMBERGER IPM (2005-01 – 2005-06)
- I Led project Management feasibility for 10 exploration wells, and 12 horizontal wells.
SPECIAL PROJECTS TEAM LEADER at SCHLUMBERGER IPM (2003-01 – 2005-01)
- I Managed well performance at Burgos basin by evaluating, developing and executing mitigation strategies for high-risk projects, and identifying opportunities and technologies to streamline project performance.
- I Led, Managed & Executed advance Risk Assessment for high-risk wells HPHT, developing a multidisciplinary team and creating geo mechanics models.
SENIOR DRILLING ENGINEER, TEAM LEADER at SCHLUMBERGER IPM (1996-12 – 2003-01)
- I Managed drilling well engineering to create geo mechanic models and mitigate risk for HPHT projects. North – South of Monagas east of Venezuela, and Lake of Maracaibo (Tomoporo Ceuta field, offshore Project)
- I Led Integrated BoD project for Inepetrol Offshore, Golf of Paria Venezuela, PDVSA, Total, ENI- LASMO, etc.
Offshore Drilling Operations Manager at Perforadora México (1993-01 – 1996-12)
South America Engineering Manager at Reed Camco (1991-01 – 1993-01)
Senior Drilling Engineer at PEMEX (1986-12 – 1991-01)