Electrician – Residential - Warburg Hutterite Colony - Warburg, AB
(2018-12 - 2019-02)
- Ensure CEC guidelines are followed while overseeing and inspecting the work of apprentices
- Install all electrical components in new 8 unit residential complex
Electrician- Industrial - PCL / Suncor - Fort Hills, AB
(2017-09 - 2017-11)
Secondary Extraction Project
- Install heat trace components (RTD), junction boxes and glanding termination
- Heat trace inspection walk downs
Electrician – Industrial - Integrated Mechanical Electrical (IME) - Fort McMurray, AB
(2017-07 - 2017-11)
Syncrude, De-watering Project
- Research and development of water extraction
- Terminate gland, commissioning KBAC
Electrician – Industrial - Vale, Nickle Processing Plant - Long Harbour, NL
(2016-01 - 2016-05)
- Cable tray, ground bond and cable pull, termination/glanding
- Rerouted fire alarm system and installed camera system
Electrician – Industrial - Neal - Bull Arm NL, Top Sides Module
(2015-05 - 2015-09)
- Cable tray, cable pull, grounding and bonding
- Fixtures, glanding terminate junction boxes
Electrician – Industrial - Kentz Engineers and Constructors - Kearl Lake Project, AB
(2014-06 - 2014-11)
- Medium voltage distribution systems, switchgear, MCC's, VFD's and motors
- Setting up and testing EHT parameters
- Commissioning of EHT circuits and controllers and program digitrone controllers
Electrician – Industrial - Gardiner Electric - Shefferville, NL
(2013-10 - 2013-12)
- Wire conveyer system, terminate glanding cable and E-house completion
Electrician – Industrial - PCL Intracon - Edmonton, Alberta
(2013-08 - 2013-08)
Kearl Lake – May
- Instrumentation fire and gas detection system inspection, lockout / tagout
- Grounding and bonding for welders, generators, trailers
- Glanding and terminating transformers, megger and point to point
Electrician – Industrial - Fluor Construction (Vale nickel process facility) - Long Harbour, NL
(2013-02 - 2013-05)
- Foreman for cable crew, E-house construction and completion
- Megger motors, report RFI as instructed, lock out tag out and inspect switch gear
Electrician – Industrial - Powellind Canada - Dawson Creek, BC
(2011-08 - 2012-03)
Spectra Energy-gas plant
- QA/QC inspection and document
- Construct MCC and install cabinets, inspect and verify MCC starters and controllers
- Grounding insulation resistance test for building structures
Electrician – Industrial - Ledcor - Fort McMurray
(2010-09 - 2011-06)
Albian Sands Project
- Heat trace locations using ISOS
- Safety inspections and maintenance for module elevator
Electrician – Industrial - MMR Constructors - Fort McMurray
(2008-11 - 2009-07)
Albian Sands Project
- Repair amerace airport runway lighting for the Canadian Base Operators
- Terminations instrument marshalling cabinets
- Pre-commissioning heat trace systems, program controllers thermon systems
- Inspect VFD's/switchgear prior to pre-commissioning
- Punch lists / QC / Heat trace