Qamar Ali asim
Project Site Manager — Power Transmission, Substations & Infrastructure
About
Results-driven Project Site Manager with 18 years' experience managing the detailed engineering, planning and execution of major power infrastructure projects, including power plants, grid stations, substations and 132kV–380kV overhead transmission lines (OHTL). Proven track record of delivering complex, multi-million-pound projects safely, on program and within budget, across client, consultancy and contractor roles in Pakistan and Saudi Arabia. Skilled in stakeholder management, site mobilization, quality assurance, cost control and cross-functional team leadership.
SEC-approved Project Site Manager seeking to bring this expertise to a UK-based infrastructure or energy contractor.
Experience
Project Site Manager - Haif Trading & Contracting Company - Riyadh, Saudi Arabia
(2024-01)
- Lead site delivery of the 132kV OHTL project connecting the substation to Riyadh Cement Factory and the 110kV OHTL project from Al Lith SS to NAQUA SS.
- Direct project planning, cost estimating and budget preparation; develop material and construction specifications for transmission works.
- Prepare design packages, material take-offs and procurement requisitions; track deliveries, inventory and documentation.
- Manage purchase orders, expense submissions, project schedules, progress reporting and quality records.
- Oversee change orders, including cost and schedule impact assessments, and provide technical support to field teams.
- Mobilize new sites, including soil investigation, batching plant setup and survey team deployment.
- Manage construction teams and plant to deliver OHTL and access road works to approved drawings and specification.
- Inspect erection materials and coordinate tower erection teams; calculate conductor stringing lengths and verify supply specification.
Project Site Manager (Civil) - University of Sargodha (UOS) - Sargodha, Pakistan
(2017-01 - 2024-01)
- Managed on-site delivery of the PKR 1,092 million UCET mega-project, from soil investigation and design approval through to execution, quality and safety compliance.
- Coordinated with the consulting engineer on quality control and quality assurance policy across the campus development.
- Prepared revised PC-1 cost estimates and vetting documentation for Government of Punjab approval.
- Reviewed and verified contractor Interim Payment Certificates (IPCs) against site progress.
- Chaired technical and financial issue-resolution meetings with the Project Director.
- Directed construction of all campus buildings and infrastructure, including roads, water supply and sewerage.
- Produced weekly and monthly progress reports and presented project status to the Vice Chancellor and Secretary of Higher Education.
- Key deliverables: full UCET campus infrastructure, Administration Block, Library, Student Hostel and Academic Blocks.
Project Site Manager - Arabian Electrical Transmission Line Construction Company - Saudi Arabia
(2013-01 - 2017-01)
- Mobilized new project sites, including batching plant setup and survey team deployment.
- Managed construction teams delivering OHTL and access road works to client-approved drawings.
- Delivered the 380kV transmission line project from Bisha to Wadi ad-Dawasir.
- Delivered 380kV OHTL projects from Turaif to Qurayat and from Turaif to Tabarjal.
- Prepared IPC claims and daily, weekly and monthly progress reports; led and supervised construction teams and coordinated material supply with consultants and client.
Senior Engineer (Civil) - BARQAAB Consultants - Pakistan
(2009-01 - 2013-01)
- Supervised and inspected site works and approved drawings with the client; verified contractor IPC claims.
- Produced progress reports and client presentations covering physical and financial project status.
- Inspected and tested construction materials, including concrete, compaction, steel and asphalt.
- Led a site inspection and supervision team across multiple grid station projects.
- Key projects: 220kV grid station and transmission line, Sukkur to Shikarpur; 220kV grid stations, Loralai and D.I. Khan.
Project Engineer (Civil) - ABEMCO - Saudi Arabia
(2006-01 - 2009-01)
- Set out power plant electrical and control buildings, crude oil tanks, main step-up transformers, turbine foundations and platforms.
- Set out a 200m underground cable tunnel, 9ft in height.
- Issued steel schedules to site engineers and supervised construction delivery.
- Managed drawing approvals with client and consultant; enforced safety and quality control policy on site.
- Supervised construction of precast roofs and walls for main transformer buildings.
- Managed multi-disciplinary teams across steel fixing, concreting, brickwork, flooring, plastering and finishing.
- Key deliverables: local electrical and control buildings, transformer foundations/platforms/firewalls, crude oil storage tanks, underground cable tunnel.
Education
B-Tech (Honours) - Civil Engineering - Preston University (2008-01)
D.A.E. - Civil Engineering - Government College of Technology, Rasul (1998-01 - 2001-01)