
Rifaquat Aleem
Panel Operator
Hire this person
Send a job offer directly to this candidate
About
Seeking a challenging position as a Senior Position where I can utilize my experience and education to serve your enterprise.
Experience
Senior Operator Utilities - Qatar Energy LNG Company Ltd.
- Qatar (2015-07) - Leading the team of operators. Training the junior team members, Improving basic skills to operate the plant safely and efficiently. Working experience of Gas Turbines, Steam Turbines, Steam Boilers, HRSG, Water Treatment, Air Compressor, Flare.
- Completed all mandatory trainings, e PTW, defensive driving, H2S, working at heights, SCABA, Gas Detector, Confined Space, Permit to work system, Mustering system Production Technician- I I - Eni Pakistan Ltd - Pakistan – Karachi (2011-03 - 2015-06) - Gas Turbines power generation, Control system up-gradation, performance testing. Inlet receiving, slug catchers, amine treatment, Mol Sieve Dehydration, Export gas metering system, Dehydration system, Export gas compressors, SAP, Permit to work, integrated management system IMS, reading, logging, log book writing, hand over machines for maintenance, start up, shut down, emergency handling, working in shift.
Head Operator Utilities
Plant - Pak Arab Fertilizers Limited - Pakistan – (2007-02 - 2011-02) - Gas Turbines generators 03 units, ISO/Droop mode operation, load management system Boiler feed water treatment, chemical dosing, logging, reading, Cogeneration, Heat Recovery Steam Generator, Steam Boilers, water treatment, Air Compressors, Boiler feed water treatment, high pressure pumps, chemical dosing, plant inspection, reading, permit to work, safety caption,procedure revision, check list preparations, emergency handling, plant inspection, routine audit, housekeeping, working with maintenan Plant Operator-1 - Fauji Fertilizer Bin Qasim Ltd FFBL - Pakistan – Karachi (1999-10 - 2007-02) - Responsibilities to operate all Utilities of the plant.Like Gas Turbines, Frame - V, Mark-V, TMR concept, Steam Boilers, capacity 200 T/hour high pressure steam, Water Treatment through Ion Exchange process called Demineralization, Air compressor, Boiler feed water treatment, chemical dosing, IBD, CBD apply, annual turn around, commissioning, start up and shut down of the plant since its erection. fire fighting member, first aid training, training the apprentices, working in shift, team player, Apprentice Chemical Plant Operator - Fauji Fertilizer Company - Pakistan (1997-10 - 1999-10) - obtain professional degree of competence to work as an Operator, study of PFD's, PID's, API, Steam boilers, water treatment, boiler feed water preparation, de-aerator, high pressure pumps. compressor Permit to work system learning, emergency response, Line tracing of the plant, emergency handling of the plant techniques
Education
Bachelor's degree - Economics, History, English
DAE Chemical 03 Years
Intermediate - Physics, Chemistry, Math, English