Construction Manager at TSL Projects (2026-07 – Present)
Lead the safe and schedule-driven delivery of civil, structural and architectural works on a £4bn+ programme for Agratas Battery Manufacturing Facility.
- Lead the safe and schedule-driven delivery of civil, structural and architectural works, managing subcontractor performance, logistics, quality, sequencing and productivity.
- Develop construction sequences, short-term schedules and three-to-six-week lookaheads aligned with the project master schedule and contractual milestones.
- Review progress, labour resources and planned productivity against the schedule, implementing mitigation and recovery measures where emerging delays are identified.
- Coordinate CSA activities with mechanical, electrical, process and specialist installations, resolving design, access and sequencing interfaces before they affect downstream works.
- Manage subcontractors from mobilization through installation, inspection, completion and handover, ensuring compliance with approved design information and contractual requirements.
- Monitor RFIs, technical submittals, procurement schedules and information releases, escalating constraints and establishing clear ownership of actions.
- Work closely with planning and commercial teams to assess package progress, variations, change events, cost exposure, valuations and forecast completion.
- Chair progress and production meetings and provide senior management and client reporting covering schedule, commercial risk, safety, quality, labour and key decisions required.
Site Superintendent at TSL Projects (2025-02 – 2026-07)
Managed site-level delivery of a CAD $160m, 278,000 sq ft cold-storage and food-production facility for Hilton Foods.
- Managed site-level delivery of a CAD $160m, 278,000 sq ft cold-storage and food-production facility, reporting directly to the Project Director.
- Managed daily site operations across civil, structural and architectural packages, coordinating subcontractors, logistics, safety, quality and issue resolution.
- Worked with the Project Director to develop and refine the Microsoft Project schedule, including work breakdowns, activity durations, sequencing and recovery planning.
- Reviewed structural and architectural drawings in Bluebeam Revu to develop phased work packages and coordinated methods of work.
- Tracked subcontractor labour, productivity, progress, budgets and schedule performance, intervening where resources or output were insufficient.
- Led production meetings and site walk-throughs with subcontractor project managers, superintendents and foremen to resolve constraints and establish clear commitments.
- Conducted quality-control inspections of material deliveries, installations and completed workmanship, coordinating deficiencies through closeout.
- Sourced and managed additional subcontractors and coordinated material deliveries to protect schedule requirements and maintain project momentum.
Construction Supervisor at Safetech Scaffold (2024-02 – 2024-09)
Supervised a 15-person crew delivering approximately 300,000 sq ft of access scaffolding and temporary roofing during the restoration of Douglas College.
- Supervised a 15-person crew delivering approximately 300,000 sq ft of access scaffolding and temporary roofing during the restoration of an operational college.
- Planned labour, materials, temporary works and site logistics while maintaining safe access for concurrent construction and college operations.
- Reviewed technical and engineering drawings, prepared material requirements and coordinated design matters with the client and engineering teams.
- Developed alternative material-handling and storage arrangements in response to geotechnical and loading limitations.
- Identified, estimated and secured approximately CAD $100,000 in additional scope and T&M work.
- Delivered the project ahead of schedule and under budget, strengthening the client relationship and contributing to additional project awards.
Scaffold Foreman at Skookum Scaffold (2023-02 – 2024-02)
Led a 16-person crew delivering access scaffolding and a temporary roof system for a major commercial development (OCC 2).
- Led a 16-person crew delivering access scaffolding and a temporary roof system for a major commercial development.
- Planned labour, materials and site logistics while coordinating requirements with the general contractor and other subcontractors.
- Provided technical advice and secured approximately CAD $100,000 in additional scope and T&M work.
- Completed the project ahead of schedule and under budget, contributing to the award of additional TransLink projects.
Scaffold Chargehand at DWG Scaffolding (2021-08 – 2023-02)
Managed scaffold delivery across three blocks of a multi-phase residential development at Barking Riverside, with structures reaching 12 storeys.
- Managed scaffold delivery across three blocks of a multi-phase residential development, with structures reaching 12 storeys.
- Coordinated installation and dismantling sequences with the project manager, brickwork contractor and other trades.
- Managed daily labour briefings, access scaffolds, loading platforms and schedule requirements across concurrent phases.
- Delivered each assigned phase ahead of schedule and within budget.