Site Engineer at Wyke Construction (2026-02 – Present)
- Setting out for holding down bolts for warehouse units 5 & 6
Site Engineer at Higgins Partnerships (2026-01 – Present)
- Setting out and supervision of hoarding for Phase 2, Ledbury Estates
Site Engineer at Wyke Construction (2025-12 – 2026-01)
- Setting out for holding down bolts for warehouse units 3, 4 & 5
- Setting out and supervision of foul and storm water drainage systems
Site Manager / Engineer at Higgins Partnerships (2025-07 – 2025-12)
Phase 2, Ledbury Estates — full site management and engineering oversight
- Setting out and supervision of demolition cut lines within existing car park structure
- Setting out the MUGA pitch and 2 No. substations
- Supervision of groundworks, rebar and ply scheduling for substation construction
- Concrete quantification and supervision of placement for substation walls and slabs
- Setting out for ground floor and roof slabs; supervision of concreting operations at both levels
Site Engineer at Telford Homes (2025 – 2025)
Worked on 3 No. RC buildings in Brentford (2 weeks)
- Setting out grid lines on 3 No. 11-storey buildings
- Setting out for fibre wrap on the soffit of the slab
- As-built survey of external RC stairs
Site Engineer at Higgins Partnerships (2025 – 2025)
(1 week)
- As-built survey of housing project site in Wandsworth
- As-built survey of Section 278 highway works
- Produced survey reports in PDF and AutoCAD format
Site Engineer at Ram Group (2025-04 – 2025-06)
- Setting out for roads, kerbs and edgings for a housing project in Epping
- As-built survey of completed works
- Material quantification and procurement scheduling
- Labour organisation and day-to-day site management
Site Engineer at Higgins Partnership (2025-02 – 2025-04)
Phase 1 — 3 No. buildings: 13-storey, 5-storey & 4-storey structures
- Transferring and establishing new survey stations and datums for the project
- Marking grid lines and datums on every floor
- As-built surveys of FSF and party walls on all floors
- Setting out for fire hydrant locations on all buildings
- Additional quality assurance works as required
QA Manager at Precast Construction Ltd. (2023-07 – 2025-02)
- Conducted as-built surveys of balcony sockets and Hal fens for 22- and 11-storey buildings
- Responsible for setting out façade panels and balconies across multiple building cores
- Delivered all as-built documentation to St James (Berkeley Group) on schedule, ensuring timely project completion
Site Engineer at DeConstruct Ltd. (2023-04 – 2023-07)
- Managed internal refurbishment of a 10-storey building, including lift and stair core setting out
- Oversaw RC wall removal and installation of new columns across 10 levels
Site Engineer at JB Structures Ltd. (2023-01 – 2023-04)
- Executed landscaping projects, including setting out for edgings, kerbs, car parking areas, planters, and services for a 4-storey residential development
Project Manager at BTR Construction Ltd. (2021-03 – 2022-12)
- Managed day-to-day operations of residential projects in Tulse Hill, including deep excavation and RC structures from basement to level 2
- Ensured site health & safety compliance and document control throughout project lifecycle
- Delivered piling, drainage, and slab work for schools in Enfield and Uxbridge
Site Engineer at Darby Groundworks Ltd. (2018-08 – 2021-03)
- Set out foundations, drainage, and access roads for housing projects
- Supervised labour and liaised with structural engineers and architects to ensure design compliance
Site Engineer at Tamdown Construction Ltd. (2018-05 – 2018-08)
- Worked on a new RC frame development (4–14 floors), managing deep drainage and setting out for structural elements
Project Manager at Marbank Construction Ltd. (2014-09 – 2018-05)
- Managed a new warehouse build in Park Royal and residential flat conversions in London
- Steel frames for 4 warehouses at the Lumina Park site, Enfield — handed over on time and within budget
- Steel frame of 1 No. warehouse in Park Royal for client Neg Earth (8,200 m² total built area) — handed over on time and within budget
- Delivered multiple projects, coordinating with clients, architects, and structural engineers to meet programme deadlines
Site Engineer at Coinford Construction Ltd. (2007-02 – 2014-08)
- Delivered multiple housing and commercial projects, including setting out for drainage, foundations, and multi-storey buildings
- Coordinated with subcontractors and maintained project schedules to ensure timely delivery
Site Engineer at O'Keefe Construction Ltd. (2006-01 – 2007-01)
- Worked on ground beams, drainage, and multi-storey building foundations for major contractors, including Sir Robert McAlpine
Site Engineer at Various Companies (1997 – 2005)
- Gained experience across multiple firms (Wates, Laing O'Rourke, Multiplex) working on high-profile projects including West India Quay and Royal London Hospital