Senior Land Surveyor & Technical Office Specialist at Tasheed Group Developments (2024-01 – Present)
Project Name: Jezzine Project, Alex West City. This includes a total area of 119,175.450 m² with 231 villas and landscaped areas.
- Supervised survey tasks to ensure projects were completed on time and within budget.
- Played a significant role in the planning and execution of a substantial residential project covering about 120,000 square meters, including villas and landscaped areas.
- Developed comprehensive engineering shop drawings for structural walls.
- Created engineering blueprints for roadways and various civil infrastructure.
- Established primary control points for site traverses and addressed any closure discrepancies.
Land Surveyor at Egyptian Company Developers (part of Tasheed Group) (2021-10 – 2023-12)
Project Name: Saluga Muruj Compound. This involves the construction of a residential complex comprising a basement, an administrative floor, and 13 modern residential levels.
- Extracted precise coordinates and survey measurements using AutoCAD and Civil 3D software.
- Accurately calculated earthwork volumes with the use of Civil 3D.
- Conducted precise setups for pile installations and monitored excavation depths.
- Coordinated the foundational layout for columns, beams, and slab edges.
- Supervised masonry works to ensure correct finishes across all floors.
- Established primary control points for site traverses and rectified any identified discrepancies.
Land Surveyor at PETROJET (2020-06 – 2021-10)
Project Name: MIDOR Refinery Expansion Project. Successfully increased refinery capacity from 100,000 to 160,000 barrels per day.
- Managed underground construction projects, including the installation of gravity sewer lines, pressure pipes, manholes, grounding pits, duct banks, and open earth channels.
- Ensured proper alignment for various civil engineering tasks, monitoring vessels, basins, packaged equipment, pumps, and tanks.
- Utilized the Hilti PS 1000 X-Scanner for comprehensive data analysis, ensuring precise placement of wire mesh within concrete to maintain structural integrity during drilling operations.
Land Surveyor at Barons Court Sports & Leisure (2019-02 – 2020-06)
Project Name: Alex West Compound
- Spearheaded the initial phase of infrastructure development at West City Club, focusing on sewer systems, interlocking roads, and surface paving.
- Oversaw site layouts for excavation limits and managed both excavation and backfilling operations for residential villas.
- Leveraged AutoCAD for surveying coordinates and data collection, boosting efficiency in site planning and development.
- Calculated earthwork quantities using Civil 3D to ensure project accuracy and compliance.
Land Surveyor at Consolidated Contractors Company (2017-07 – 2019-01)
Project Name: Opera Grand Tower Project. A 71-story skyscraper developed by Emaar and designed by DP Architects.
- Collected coordinates and surveying data utilizing AutoCAD, ensuring accurate measurements.
- Designed layouts for slab edges, columns, beams, and shear walls, effectively directing construction activities.
- Verified the vertical alignment of towers to ensure structural integrity throughout the project.
- Supervised construction tasks by establishing key finishing points and levels, guaranteeing quality deliverables.
- Produced coordinated drawings and computed quantities for effective project management.
- Compiled detailed surveying reports to monitor progress and ensure alignment with design specifications.
- Established primary control points for site surveying and promptly addressed any discrepancies noted.
Land Surveyor at AlForat Developments (2016-04 – 2017-07)
Project Name: Jewar Compound. Development of a 33-acre residential community featuring villas and a clubhouse.
- Defined and enforced excavation boundaries on-site, ensuring compliance with project guidelines and specifications.
- Monitored excavation and backfilling processes to guarantee adherence to engineering standards.
- Outlined specifications for foundations, columns, beams, and slab edges to effectively guide construction operations.
- Established critical control points for efficient navigation on-site and addressed discrepancies as they arose.