Civil Engineer Team Leader
Send a job offer directly to this candidate
Customer connections involving talking with customers and agreeing upon routing convenience. Digging new track from Toby box to customer property entry points to company depth specifications dependent on ground type. Fibre pulling from FAT connection point to customer premises with light leading verification to company requirements.
Track works completion for customers missing connections to main network. Chamber building for new network chambers to house connection points within company specifications. Blockages, repair and clearing of ducting blockages on OR and CBL networks using A55's and rod testing.
Civil Engineer Team Leader at County Broadband (2025-05 – Present)
Customer connections involving talking with customers and agreeing upon routing convenience. Digging new track from Toby box to customer property entry points to company depth specifications dependent on ground type. Fibre pulling from FAT connection point to customer premises with light leading verification to company requirements.
Track works completion for customers missing connections to main network. Chamber building for new network chambers to house connection points within company specifications. Blockages, repair and clearing of ducting blockages on OR and CBL networks using A55's and rod testing.
Civil Engineer Team Leader at Kelly Communications (2025-03 – 2025-05)
City fibre contract work doing blockages on both public and private land. Locating blockages using A55 provided with job pack. Double checking blockage location by testing ducting using the cobra. If micro ducting was used, fibre was blown and meters measured out to locate blockage. Blockages repaired using repair kits/split ducting (4inc/2inc). Reinstatement/backfill carried out after blockage clearing and fixing to specifications.
Civil Engineer at WHP Telecoms (2023-09 – 2025-02)
VM Greenfield contract work doing complete MBU builds. Reading plans and building network to build to plans and specifications whilst adhering to Health and Safety and job specifications. Track work for either micro duct direct bury or ducting (2/4inch) including C.A.T and genny scan off ground to locate possible services and avoid damage to UG services.
Digging track to correct specifications and backfilling with appropriate materials. Installation of Tobies (fibre pots outside premises) for installation of fibre house feeds in correct location at correct specifications. Trench ramming to make watertight and occasional reinstatement.
Building chambers for VM network at correct specifications along with VM fibre cabs. Locating and digging out correct power cable for VM power cab. Box building - building VM chambers concrete or modular (boxes) all to correct specifications and build plan.
VM cabs - dig out and install VM fibre cabs (L2, L2.5, L3, L4) plus power cabs located where build plan specified. Power hole work including CAT and genny of located area to locate UG services, digging down to correct power cable and to correct specifications for new electric joint to supply VM power cabinet.
Telecoms Engineer at KN Circet – UK (2023-09 – 2025-02)
Started doing civil works on behalf of BT Open Reach for first 5 months including new network tracks and ducting, frame and covers, demo and rebuilding of boxes, blockages. Moved to cabling where testing new and old tracks and recording any problems on b2b's and a55's. Pulling copper cable and fibre cable with splining work pulling off sub-duct and then blowing fibre cable.
Became team leader in charge of 2 labourers giving daily tasks and targets ensuring work carried out effectively and efficiently. Performed head fibre cabling (ultra light weight fibre). Moved to fibre splicing side of job for the past 6 months doing fibre splicing on new and existing networks UG and OH using appropriate OFS's.
Bike Mechanic / Shop Floor Supervisor at Cycle King (2022-04 – 2023-09)
Building, repairing and selling push bikes. Stock taking to ensure stock is correct and investigating why stock discrepancies occur. Giving quotes for bikes coming in for repairs and underlining what problems and issues customers' bikes might have and how they would be repaired.
Position not specified at Cycle King (2018-08 – 2022-04)
Warehouse Worker at Cambridge Assessments (2016-04 – 2016-06)
Working in a warehouse with duties including scanning exam papers on a big industrial scanner, then filing exams into boxes to be stored.
Position not specified at Buildteam Solutions (2015-07 – 2015-09)
Gained extensive practical skills and knowledge used in construction trading and site. Clean working environment maintained for safety reasons.
Site Operative at Camgrain (2014-05 – 2015-07)
Site operative duties included helping Lorry drivers unload and load, keeping site and work areas clean and suitable for a working environment.
– Cambridge Regional College (2014 – 2015)
– Linton Village College (2010-09 – 2014-06)
– Neale-Wade Secondary School (2009 – 2010)
– Murrow Primary School (2002 – 2009)