Assistant Civil Engineer
Send a job offer directly to this candidate
A driven, hands-on civil engineer who has spent the last three years leading live sites across the Kurdistan Region's major government, commercial, and residential projects. Over 80,000 m² delivered directing crews of up to 30, and 200,000 m² personally measured for payment valuation and design-to-field verification. Combines decisive site leadership with the quantity-surveying and quality-control discipline that keeps projects accurate, on schedule, and finished right the first time.
Assistant Civil Engineer at KAVIN GROUP LTD (2025-01 – Present)
Duhok Central Bazar — Sidewalk & Pavement Renovation. Government Project covering 35,000 m². Full renovation of central bazar pavements through the complete interlocking-block sequence — excavation, compacted aggregate subbase, lean-concrete layer, a 3–4 cm sand bedding cushion, laying of the interlocking blocks, compaction, and fine-sand joint filling to seal the voids. Large-scale, high-footfall public works programme.
Assistant Civil Engineer at LAZGIN COMPANY (2024-01 – 2025-12)
Marbella Villas — Residential Development. Developer project covering 27,000 m² of granite, marble, and ceramic finishing across a hillside villa development, plus 13,000 m of granite curbstone. Granite was bonded with mortar onto a lean-concrete bed over compacted subbase; garage areas used reinforced concrete sub-slabs (welded mesh + ready-mix) levelled to receive the granite.
Supervised complex geometry works: 45° mitred (diamond-cut) granite for inclined garage ramps, curved ramps combining vertical fall with horizontal curvature, and black-marble entrance stairs with turned flights and flat landings.
Assistant Civil Engineer at SHAHAN COMPANY (2024-01 – 2025-12)
French Village 2 — Commercial Units & Parking. Developer project covering 9,000 m². Granite storefronts for commercial units (cafés, retail, restaurants) and the commercial parking area, mortar-bonded onto a lean-concrete bed to the same granite specification used at Marbella.
Assistant Civil Engineer at KAVIN GROUP LTD (2024-01 – 2024-12)
Duhok Terminal — Dealership Forecourts. Project covering 3,000 m². Multi-colour pattern interlocking block paving across automotive dealership forecourts (Ram, Dodge, GMC, Chevrolet, Ford), combining red, grey, and black block formats into set patterns, with a continuous stone strip running around the buildings.
Assistant Civil Engineer at KAVIN GROUP LTD (2023-01 – 2023-12)
Kavin Farm — Site Paving. Project covering 9,000 m². Supervised paving and hardscape installation across the development site, coordinating materials, plant, and site logistics to keep crews productive.
BSc in Civil Engineering – University of Duhok (UOD) (2024-01 – 2025-12)