Manager Manufacturing Feeder shop Central AC line at Awal Gulf Manufacturing Co BSc. (Present)
- Manager Manufacturing includes Press shop, Powder coating shop, Fabrication shop, and Coil shop.
- Major responsibility in handling Sheet metal process head for CNC turret & bending, Cut to length GI sheet slitting, Press machines, Powder coating plant, Liquid painting, Effluent treatment, Chemical treatment line & fabrication shop with MIG & TIG Welding, plasma cutting purpose to manufacture structural channels base frames, blower frames, motor mounts for central AC machines.
- CNC programing hand on experience can work on Metallix CNC programing using ACAD drawing & converting to G code programs.(Trained Engineers & supervisors for cnc programing)
- Managing Press machines production of sheet metal items using capacity from 250ton to 400tons
- Managing Powder coating plant overall production to feed for assembly lines.
- Managing Fabrication shop, involves central AC machine blower frames, motor mount, base frames fabricated using MIG Welding, plasma cutting, ss welding, liquid painting.
- Additional Responsible taken care for final Central AC manufacturing lines (Ensure Testing, final labels, EER, Brand name, packing is done according to customer requirements)
- Uses LN System for manufacturing follow Bill of material, Production planning, warehouse orders, Purchase Orders.
- Every month manpower and Production capacity requirement based of marketing forecast.
- Human resource managements through –HRMS (e.g. man management/hrs. of work/Overtime approval)
- Department Man power, tooling, machinery planning every year based on marketing forecast for production.
- Maintaining safety of workers & good housekeeping at work place is always my motto.
- To ensure material availability for production, timely check for shortages and follow up with materials departments.
- Co-ordination with senior managers for resources
- Follow up with maintenance Machine installation engineers, Annual maintenance contracts.
- Process improvement & Housekeeping tools like '5s', KAIZENS, POKOYOKE.
- Innovation in Cost reduction & saving proposals to ongoing projects/production processes has always been my motive.
Plant Manager Press shop at Advance Power Display Systems Pvt. Ltd (2006-05-30 – 2010-12-04)
Manufacturing Switch Mode Power supplies (SMPS), Dealers to CISCO, NORTEL, HP, and JUNIPER –USA. Company engaged into Design & Manufacturing of Switch Mode Power supply's (SMPS).
- Managing entire Press shop for supply of sheet metal items for all 3 lines (units 2500/day)
- Process involve Press machine, Powder coating, Screen printing, heat sinks, Metal yellow passivation's.
- Overall strength of Press shop was 90 employees and 06 Engineer working round the clock
- Planned and executed everyday production activities
- Led overall operations with a view to ensure timely accomplishment of production targets within the time & cost parameters
- Developed new process concepts for production optimization & yield improvement and developed guidelines for sequencing of manufacturing activities in the organization
- Planned and executed Preventive Maintenance, Breakdown Maintenance
- Upgraded technicians' skills & approach for increasing uptime of machines and improving manufacturing efficiency
- Setup of new factory to increase production capacity.
- Making layouts and guiding machine Installation & Erection team
Head of Department (Press metal shop) at Astra Metals Systems Pvt Ltd. (1999-12-04 – 2006-05-26)
Manufacturer of Precision Sheet Metal Parts & Fabrication for Siemens medical Engineering X-RAY machines, Tata Unisys Diebold ATM machines. Company engaged in manufacturing of precision sheet metal fabricated components & assemblies.
- CNC Programming on sheet metal software for Amada Turret machines
- Production planning for press shop based on weekly requirement.
- Project Planning for Design and Prototyping work based on customer inputs.
- Process improvement in press shop by means jigs and fixture's
- Design of welding fixtures & Drilling jigs.
- Reduced Machine downtime by less than 3% through measures such as preventive maintenance, finding root Cause of breakdown by using statistical quality tools, analyzing the risks and inventory management of critical Spares.
- Vendor development by improving processes and providing training.
- Contributed as a team member for various projects functioning.