Skip to main content
Mohammed Abdul Umar

Mohammed Abdul Umar

OVERHEAD CRANE OPERATOR

Talent
BirminghamMember since September 28, 2026
Overhead crane operatorHoke & Magnet Crane Operator
·

Hire this person

Send a job offer directly to this candidate

Overhead crane operatorHoke & Magnet Crane Operator

About

A responsible and challenging position in an organization that would enable me to augment my acquired knowledge, bring to forefront my Skill and offer opportunities for growth based on achievements. The Attitude would be to gain comprehensive understanding of the working of an organization and to contribute meaningfully to its growth for bringing a team member.

Experience

OVERHEAD CRANE OPERATOR - QATAR STEEL (Under Contractor) MTC - Qatar

(2024-08)

Hoke & Magnet Crane Operator in Mill Production Division, operating 10MT, 15MT, 20 MT, 50MT capacity cranes.

  • Check crane mechanism before putting it into regular operation.
  • Follow company safety instructions.
  • Before operating the crane, check that all movements function properly.
  • Before operating, check all motor limit switches and brakes.
  • Dump the crop bucket to the scrap area.
  • Lift bar bundles onto the bed and stack them properly by size.
  • Load trailers as per order for the required size, following signals given by the Dispatchers.
  • Re-bundle short bars with the checker.
  • Check oil in reducers, grease on wire rope, wire rope condition, all movement positions, brakes, and motors.
  • Immediately inform the Foreman or Shift Supervisor of any abnormal noise.
  • Commit to following safety guidelines throughout operations.
  • I try to do work best of my knowledge.

OVERHEAD CRANE OPERATOR (SMS-2) - BHILAI STEEL PLANT (Under Contractor) - Bhilai, India

(2023-03 - 2024-08)

Hoke & Magnet Crane Operator in Mill Production Division, operating 10MT, 15MT, 20 MT, 50MT capacity cranes.

  • Check crane mechanism before putting it into regular operation.
  • Follow company safety instructions.
  • Before operating the crane, check that all movements function properly.
  • Before operating, check all motor limit switches and brakes.
  • Dump the crop bucket to the scrap area.
  • Lift bar bundles onto the bed and stack them properly by size.
  • Load trailers as per order for the required size, following signals given by the Dispatchers.
  • Re-bundle short bars with the checker.
  • Check oil in reducers, grease on wire rope, wire rope condition, all movement positions, brakes, and motors.
  • Immediately inform the Foreman or Shift Supervisor of any abnormal noise.
  • Commit to following safety guidelines throughout operations.
  • I try to do work best of my knowledge.

Education

10th - Central Board of Secondary Education (2021)

Higher Secondary School Certificate Examination (10+2) - Chhattisgarh State Open School, Raipur (2023)

Skills

OVERHEAD CRANE OPERATOR

Reviews

Related