Skip to main content

Nicholas Jay

TOWER ASSEMBLER AND ERECTION TECHNICIAN OF 132, 225, 400 KVS

Talent
NottinghamMember since July 27, 2026
Tool box conductingStringing technicianAssembling and Erection by Derrick poleAssemble and erection by gin poleAssembly and erection by CraneAbility to work without supervisionCapability of meeting targetsHealth and safety implementation
·

Hire this person

Send a job offer directly to this candidate

Tool box conductingStringing technicianAssembling and Erection by Derrick poleAssemble and erection by gin poleAssembly and erection by Crane

About

MOMA PROJECT

Experience

Tower Assembler and Erection Technician - LARSEN AND TURBO CONTRACTOR UNDER AB POWER COMPANY - Mozambique and Malawi

(2023-10 - 2024-04)

MOMA PROJECT

  • 400KV single circuit foundation – Mozambique Tete Province
  • Sorting of tower materials
  • Assembling of tower as per specific tower drawing
  • Lifting of gin pole
  • Section by section erecting of tower
  • Descending of Gin pole
  • Fixing of missing pieces
  • Tightening of the whole tower
  • Leveling of excavated hole
  • Steel fixing of primary box guage
  • Stub setting and vertical steel fixing
  • Cropping of the stub
  • Adjusting of crops as per surveyed measurement
  • 400KV single current stringing Mozambique – Zambezia province
  • Roller Hosting
  • Conductor clipping
  • Anti-vibration dumper fixing
  • 400KV single circuit tower Erection Malawi-Zalewa

Technician - Larsen and turbo - Tanzania (Chalinze-Hydro power station)

(2022-08 - 2023-06)

  • 400KV double circuit line
  • Strings/ glass insulators hanging
  • Stays fitting and tightening
  • Pilot passing using landcruiser pulling
  • Clipping of conductors
  • Ground assembling of tower
  • Fixing of internal diagonals
  • Manual rigging of the tower
  • Conducting of tool box talk
  • Derrick pole lifting
  • Section by section lifting of tower
  • Descending of derrick pole

Technician - Sterling and Wilson - Nyakanazi to rufiji substation

(2022-01 - 2022-08)

  • 400KV double circuit line
  • Insulator hanging
  • Fittings analyzing
  • Checking of pins of glass insulators before hanging
  • Back stays 18mm fixing both drum side and puller side
  • Roller hoisting using small winch machine
  • Pilot passing by platinum rope connected to it to puller machine

Technician - Sieoyone Chinese company - Kenya Kisumu Substation

(2022-01 - 2022-05)

132KV kv face

  • Gantries erecting
  • CVT ,CT structures assembling and erection
  • Structures leveling using horse pipe
  • Tightening and placing of equipment
  • Jumpering of gantries and equipments
  • Conducting of tool box talk
  • Insulator fitting
  • Work tools assessing

Technician - Elemech Eng company

(2019-01 - 2021-09)

  • 400KV double circuit line
  • Manual rigging of the tower
  • Conducting of tool box talk
  • Derrick pole lifting
  • Section by section lifting of tower
  • Descending of derrick pole

Education

Certificate - St. Joseph Secondary School (2015 - 2018)

Certificate - Mayoni Primary School (2005 - 2014)

Skills

TOWER ASSEMBLER AND ERECTION TECHNICIAN OF 132225400 KVS

Reviews