Pictures in job place: upto date to first joining
Send a job offer directly to this candidate
Employer: Mohammed Elias Brothers Poy Manufacturing Plant Ltd.
Position: Deputy General Manager
Duration: January’2024 to present date
Responsibilities: Electro-Mechanical Maintenance, Sales service & Logistic/Customer service work of Yarn Manufacturing plant - POY (partially oriented Yarn) and DTY (Draw Texturized Yarn).
Technical Area: Supervise/operational work of 1000 KVA Sub Station (X-er, VCB, HT, LT, Changeover, PFI), Earthing system and MCC Panel. Supervise /operational work 1,000 KVA x 3 gas generator. Making monthly roster/shift schedule of the personnel (assistant operators of control room). Monitoring and Supervision of all types of Electro-mechanical work. New Production line setup by installing new machinery.
Monthly meeting, Company audit, report making for spare parts for preventive maintenance, purchase local electrical & mechanical Spare. Maintenance of Chips drying tower, Dryer heater, Crystallizer heater & Blower cyclone & wet chips hopper etc. AHU room, Chillers, Compressors, Pumps, HP Dryer, Chips conveying area.
Customer service: Handling incoming calls, emails from customers as well as making outbound calls to customers & interacting with customers in online chat in whatsapp.
Responding & solving the customer complaints within shortest time & processing orders, invoices, payments, claims, credits and returns, updating and maintaining records of customer interactions.
Sales service: Present, promote & sell products/services using solid arguments to existing and prospective customers through cold calling, Achieve agreed upon sales targets annually & outcomes within schedule.
Generating leads, Meeting or exceeding sales goals. Coordinating sales efforts with, Coordinate sales effort with team members and marketing programs, Giving sales presentations to a range of prospective clients. Preparing and submitting sales contracts for orders.
Employer: " New Indian Garden AB", Västgötagränd 18, 118 27 Stockholm, Sweden.
Duration: 01st July’ 2023 to November’2023
Responsibilities: Achieve high levels of customer satisfaction through excellence in receiving, identifying, dispatching & assuring quality of goods.
Measure and report the effectiveness of warehousing activities
Organize/maintain inventory and storage area, Ensure local delivery and inventory transactions’ accuracy
Finished goods dispatches in a timely manner & according to schedule.
Schedule materials being transferred to and from warehouse; coordinates transfer of inventory between departments.
Interface with customers to answer questions or solve problems
Maintain items record, document necessary information and utilize reports to project warehouse status, Monthly report preparation.
Employer: "Equity Petroleum Company Ltd.", Sitakund, Chittagong.
Position: Project Manager
Duration: Jan ’2014 to May’2023
Responsibilities: Project Implementation work of 130 MT Capacity Condensate Fractionation plant.
Logistic support to the Contractor & Daily routine meeting with Engineer/ Subordinate as well as Implementation of various operations through control, coordination, direction, management and communication of the entire process.
Monitoring and Supervision of all types of Electro-mechanical work (Thermo-fluid Heater, Re- Boiler, Stripper Ballon, Fractional Column, Aero-condenser, Degasser, Heat exchanger).
Supervise the fabrication work of Feed Tank, Product storage Tank (SBP, MS, MTT, HSD) with Scale fixing, Floating Roof, Sample collection system, Breather, Drain line, Manhole, Painting etc.
Supervise the fabrication & installation work of Foam Producer Tank & water spray system for fire extinguisher & setup Cooling Tower.
Employer: "United Power Generation & Distribution Company Ltd." United center, Road-51, Gulshan-2, Dhaka 1212. Bangladesh
Position: Senior Project Engineer - Electrical
Duration: Jan. 2011 to Dec.’2013
Responsibilities: Supervision of Installation and Erection, commissioning and operational work of 56 MW power plant – Gas Engine.
Logistic & Technical support to the Contractor/Sub-contractor and Daily routine meeting with Engineer/Subordinate.
Check of Estimation of the Tender offer, BOQ and coordination to Contractor/Sub- contractor.
Supervise the work of laying of cable system (LT and HT)
Earthing (Mesh and boring) system of substation and Engine Hall individually.
Monitoring & Supervise 11/230 KV Sub Station Erection Works (X- er - 70 MVA/80 MVA (tap changing), CB, CT, IVT, DS, LA, MV Panel, LV Panel, MCC panel)
Monitoring & Supervising work of 230 KV Transmission Tower (34 meter height and double circuit) to national grid.
Employer: "Bakhrabad Gas Systems Limited" (A Company of Petrobangla, under Energy Ministry), Head Office, Dist. - Comilla
Position: Senior Maintenance Engineer-Electrical
Duration: 9th July 2000 to 30th July’ 2006.
Responsibilities: As a Shift In-charge at Control room for 02 yrs 6 months, & Maintenance Engineer (Electrical) for 3yrs -
a) as a Shift In-charge (at control room)- (Nov.’2003 to July 2006):
Monitoring & maintaining the operational work of load dispatch for bulk (i.e. Thermal Power Plant, Fertilizer Company & Paper Mill Industry) & commercial consumers at Peak & off Peak period.
Making monthly roster/shift schedule of the personnel (assistant operators of control room).
Team/Group work & coordination maintaining with Staff.
b) as a Maintenance Engineer - Electrical (July’2000 to October’2003):
Maintenance of Sophisticated Electro-Pneumatic instruments (i.e. Emergency Shutdown Valve (ESDV), EVV (Emergency Vent Valve) & Pressure Control Valve (PCV)) & Inlet Separator, Outlet Separator, Condensate Storage Tank, and ancillary devices are Air Compressor, Water Bath Heater/Boiler and its routine maintenance, and Flash Drum/Knockout drum of 350 Million SCFD Capacity Gas Processing/ Regulating station.
Sept. 2006- June. 2008: MSC in Electric Power Engineering:
Chalmers Technical University, Gotenberg, Sweden (full-time SI Scholarship).
April. 1994 – Nov.1999: BSC in Electrical & Electronic Engineering: Chittagong University of Engineering & Technology (former BIT, Chittagong, Bangladesh) with First Class & secured 8th position in order of merit.
Awards & Honors:
Full time Scholarship from Swedish Government for MSC program