Victor Mabuza
Construction Supervisor
About
Seasoned professional with expertise in leadership, health and safety regulations, and strategic planning. Proven ability to lead teams while ensuring compliance with safety standards and driving organizational success. Skilled in problem analysis and quality control, fostering a collaborative work environment. Committed to maintaining high-quality standards and enhancing team performance.
Experience
Construction Supervision - NECSA ENG - Koeberg Nuclear Power Station
(2026-06)
- Implemented safety protocols, reducing workplace accidents and maintaining compliance with OSHA regulations.
- Oversaw daily operations at site, keeping team production moving at optimal pace.
- Supervised daily operations to ensure compliance with safety and quality standards.
Pipe Fitter - BABCOCK ENG
(2025-09 - 2026-05)
- Fabricated and installed screw pipe, socket weld pipe, and stainless steel tubing.
- Threaded pipes using piping machines.
- Installed and maintained industrial piping fittings, valves, flanges and clamps to complete systems setup.
Construction Supervisor - MURRAY & ROBERTS
(2023-11 - 2024-01)
- Structural Modification
- Coordinated construction planning, material resources, and staff scheduling to achieve on-time, under-budget completion profitable projects valued
Mechanical Supervisor - MURRAY ROBERTS
(2023-01 - 2023-12)
- Supervised installation of different types of mechanical equipment, keeping work in line with drawings and specifications.
Mechanical Foreman - MURRAY & ROBERTS
(2022-01 - 2022-12)
- Installation, Aligning
- Installation of Blank Flanges
- Deconnection of Argon Pipes and Oxygen Pipes
- Replacing, Repairing, Installed Motor and Gearbox
- Managed efficient teams of up to 60 employees.
Construction Supervisor - MURRAY & ROBERTS
(2021-01 - 2021-12)
- Modification of PJFF
- Installation of Channel Guide Support
- Installation of Rectifiers
- Installation of Guide Plate
- Installation of Erosion Protection Plate
- Installation of Kicker Plate on Hopper
Supervisor - MURRAY & ROBERTS
(2019-01 - 2020-01)
- Modification on Rotor 1 and 2
- Installation Motors and Gearbox
- Installation of Pin Racks and Align New Ones
- Installation of Sootblowers and Motors
Acting Supervisor (Finishing Department) - MURRAY & ROBERTS
(2017-09 - 2018-12)
- Unit 6 Installing Heat Flux Sensors
- Installing CO2 Sensors
- Installing Site Fire Boxes on Rear and Front Wall
- Unit 3 Maintenance
Ducting Foreman - MURRAY & ROBERTS
(2017-06 - 2017-08)
Mechanical Fitter - MURRAY ROBERTS
(2015-01 - 2015-12)
- Maintenance, Repairing, Replacing Faulty Components
- Lubrication Components Using Force Feed, and Gravity Feed, Alignment of Mechanical Drives
Pipe Fitter - MURRAY & ROBERTS
(2013-01 - 2014-01)
- Installing New Economiser, Sling Tube, Installing Reheater, Super Heater and Screen Tube
Pipe Fitter - MLS ENG Sappi - Nelspruit, Mpumalanga
(2012-07 - 2012-12)
- Strap the Old Economiser, Installing New Economiser and Install New Suitblower Line
- Cutting Damaged Tubes, from Super Heater and Reheater Header, Left and Right Main Steam and Prepare to Install New Pipes
- Cutting Existing Pipe Left Hand Side from Turbine Leg to Boiler Leg on Terminal Point. Cut Old Welding, and Install Stainless Steel Pipes Inside the Boiler
- Tube, Primary Superheater and Primary Re-Heater Refurbishment and Re-Install, Strapping Damaged Steam Pipes and Installing New Ones at the 74 M Level
- Installing New Pumps and New Pipes
- Performed precision cutting of pipes to meet project requirements.
- Assembled pipes using welding equipment, guaranteeing secure connections for long-term usage.
Pipe Fitter - STEINMULLER ENG
(2011-08 - 2011-11)
- Used power tools adeptly during installation and repair processes, ensuring precise workmanship.
- Read blueprints accurately for successful execution of complex piping layouts.
Pipe Fitter - BABCOCK
(2011-01 - 2011-05)
- Strap the Old Economiser, Installing New Economiser and Install New Suitblower Line
Pipe Fitter - BACKCOCK ENG
(2010-01 - 2010-06)
- Cutting Damaged Tubes, from Super Heater and Re-Heater Header, Left and Right Main Steam and Prepare to Install New Pipes
Pipe Fitter - BABCOCK ENG
(2009-08 - 2009-11)
- Cutting Existing Pipe Left Hand Side from Turbine Leg to Boiler Leg on Terminal Point. Cut Old Welding, and Install Stainless Steel Pipes Inside the Boiler
Pipe Fitter - BABCOCK ENG
(2008-01 - 2009-04)
- Tube, Primary Superheater and Primary Re-Heater Refurbishment and Re-Install, Strapping Damaged Steam Pipes and Installing New Ones at the 74 M Level
Semi-Skilled Pipe Fitter - WETBACK ENG - Komati Power Station, Mpumalanga
(2006-01 - 2007-12)
- Installing New Pumps and New Pipes
- Performed precision cutting of pipes to meet project requirements.
- Assembled pipes using welding equipment, guaranteeing secure connections for long-term usage.
Education
National Certificate - N5, Supervisor Management, Strength of Materials and Structures, Power Machines, Engineering Physics, Mechanical Fitter - TZANEEN TECHNICAL COLLEGE (2018 - 2018) Lephalale, Limpopo
National Certificate - Production and Supervision - CENTURION ACADEMY (2014 - 2014) Witbank, Mpumalanga
National Certificate - N4, Supervisory Management, Mechanotechnics, Mechanical, Mathematics, Fundamentals of Project Management - SANDTON TECHNICAL COLLEGE (2017 - 2017) Pretoria, Gauteng
National Certificate - N3, Mechanical Engineering, Supervisor Management, Mathematics, Engineering Science - SANDRINGHAM TECHNICAL COLLEGE (2016 - 2016) Pretoria, Gauteng
National Certificate - Fundamentals of MS Office 2010 - CENTURION ACADEMY (2015 - 2015) Witbank, Mpumalanga
National Certificate - Pipe Fitting - EBS TRAINING CENTRE (2015-01 - 2015-01) Witbank, Mpumalanga
National Certificate - HIRA - OHS ACADEMY (2015-01 - 2015-01) Witbank, Mpumalanga
National Certificate - Pipe Fitting, Drawing, Preparation and Fabrication, Production and Supervision - LAPACE TRAINING CENTRE (2008-01 - 2008-01) Springs, Gauteng
National Certificate - Grade 12 (Matric), Siswati, English, Afrikaans, Economics, Accounting, Business Economics, Commercial Mathematics - LUBOMBO SECONDARY SCHOOL (2005 - 2005) Mpumalanga
National Certificate - Mechanical Fitter Trade Test - KAVOD CAMPS B (2025 - 2025) Witbank, Mpumalanga
International Certificate - Safety Management in Construction - ALISON (2025 - 2025)
International Certificate - Mechanical Engineering Principles and Design - ALISON (2026 - 2026)
International Certificate - Engineering Project Management - ALISON (2026 - 2026)
International Certificate - Introduction to Quality Control - ALISON (2026 - 2026)
International Certificate - Diploma in Solar Energy Engineering - ALISON (2026 - 2026)
International Certificate - Introduction to Nuclear Power Energy - ALISON (2026 - 2026)
International Certificate - Diploma in Project Management - ALISON (2026 - 2026)
