Anson has 5 years of experience of communicating and liaising with the client, design teams and others to overcome the challenges. He has various experience of project management and design in several civil engineering projects. He has been involved in both different scale infrastructure projects such as site formation project for public housing development, footbridge and sewage upgrading works project.

工作經歷

Engineer at Asia Infrastructure Solutions Limited (2024 – Present)

Graduate Engineer, Assistant Resident Engineer at Atkins China Limited (2021 – 2024)

Assistant Engineer at WSP (Asia) Limited (2020 – 2021)

Engineer at AAHK

Contract E1002 - SKYTOPIA Infrastructure (Initial Phase) Design Consultancy Services: The Scope of this project involves the design of Art Piazza, Promenade and Footbridges connecting the developments and existing 11 Skies mall.

  • Coordinate technical workshops and interface meetings
  • Monitor and prepare implementation programme
  • Prepare deliverables for submission to AAHK for approvals

Assistant Engineer at HyD (2024 – Present)

Agreement No. CE 52/2023(HY) Proposed Pedestrian Environment Works in Kwun Tong Business Area – Ngau Tau Kok Portion – Design and Construction. This Agreement mainly includes the construction of a new Subway S1 across Elegance Road, Kwun Tong Road and Hang Yip Street to connect the existing joint-user facility Subways at the entrance structure with lift provision near Ngau Tau Kok MTR Station.

  • Work as the project coordinator to liaise with different teams and government departments
  • Experience in programme monitoring for project implementation
  • Resolve interface issues with different parties

Assistant Engineer at CEDD (2024 – 2024)

Agreement No. CE 18/2019(CE) Development of Fanling North New Development Area, Remaining Phase - Design and Construction.

  • Coordinate and management of the design projects and preparation the engineering Reports
  • Assist in the tender assessment and preparation of tender documents adopting the NEC HK edition
  • Design for the site formation for housing, community, commercial and other developments
  • Work on engineering infrastructures works especially Falling Bypass, Flyover, new interchanges with widening of Fanling Highway for connection with KTN NDA
  • Work on local roads, cycle tracks, drainage, sewerage, waterworks, pumping station, fresh water and flushing water service reservoirs
  • Implement landscaping work and environmental mitigation measures for the works

Project Manager at DSD (2023 – 2024)

Contract No. DC/2018/11 - Upgrading of Central and East Kowloon Sewerage – Phase 3. Provision of professional assistance to RSS at professional ranks or above in the delivery of their duties of the representative or delegate of the Project Manager and the Resident Engineers.

  • Handle traffic issues such as Temporary Traffic Arrangement design and planning
  • Attend TMLG meetings
  • Monitor the application for valid XPs and Road Works Advice for various work fronts for sewer upgrading works
  • Oversee trial pits, open-cut excavations, trenchless pipe jacking, and CIPP works, located on carriageways and footpaths in Tsim Sha Tsui, To Kwa Wan and Hung Hom
  • Assist in the assessment of submissions such as quotations for PMI/CEs
  • Perform ICE checking and completion Certificates

Graduate Engineer at CEDD (2021 – 2023)

Agreement No. CE 39/2021(CE) Site Formation and Infrastructure Works for Public Housing Developments at San Hing Road and Hong Po Road, Tuen Mun and Choi Shun Street, Sheung Shui - Investigation, Design and Construction. Anson was involved in Choi Shun Street Project.

  • Work as the project coordinator to liaise with different teams and government departments
  • Explore feasible schemes and overcome the challenges
  • Arrange and attend various public consultation events and meeting with village representatives related to land and grave issues interfacing with the project
  • Assist CEDD to prepare land resumption plans and gazette documents under different ordinances

Graduate Engineer at HyD (2021 – 2023)

Agreement No. CE 23/2019 (HY) - Footbridge Linking Fanling MTR Station and Luen Wo Hui – Feasibility Study. Studying the engineering feasibility of a potential footbridge linking Fanling MTR Station and Luen Wo Hui. The project involves the improvement of the connectivity between Fanling MTR Station and Luen Wo Hui, especially in light of the foreseeable rapid development in the area in future years.

  • Conduct project coordination tasks involving option assessment
  • Perform cost estimation
  • Address land requirement issues
  • Conduct constructability study
  • Involve in preparation and submission of reports such as Preliminary Geotechnical Appraisal Report, Engineering Feasibility Study Report
  • Involve in public consultation