Senior Mechanical Engineer - PERTAMINA EP - Gundih-Cepu (PPGJ), Central Java-Indonesia
(2009-01 - 2013-12)
Built plant for oil and gas process
- Review mechanical calculation for storage tank, pressure vessel, heat exchanger, pump, air compressor, DEG, GEG.
- Review engineering documents FEED and DED (data sheet, GA drawing, specification, detail drawing, calculation)
- Joint review QAQC documents (QAQC Manual, drawing, procedure inspection & test, WPS/PQR, ITP and Contractor and Sub-contractor reports) and piping documents
- Inspection for fabrication of Storage Tank: Carbon Steel and Stainless Steel
- Inspection for fabrication of Pressure Vessel (CS & SS)
- Inspection for Running Test for pumps, air compressor and the other rotating equipment.
- Witness test and conduct inspection: hydrostatic test, FAT, SAT, inspection materials
- Coordination meeting with contractor and subcontractor
- Make NCR (if any)
- Review punch list and review action solution of punch list
- Conducted in Mechanical Completion, Pre-Comm & Comm, and Start-up
- Review MDR from Contractor
Senior Mechanical Engineer - PERTAMINA EP - Babelan-Bekasi (PMDP), West Java-Indonesia
(2013-01 - 2015-12)
Built plant for oil and gas process
- Review engineering documents FEED and DED (data sheet, GA drawing, specification, detail drawing, calculation)
- Review QAQC documents (QAQC Manual, drawing, procedure inspection & test, WPS/PQR, ITP and reports)
- Inspection for fabrication of Storage Tank: Carbon Steel
- Inspection for fabrication of Pressure Vessel (CS & SS)
- Inspection for Running Test for pumps, air compressor and the other rotating equipment
- Witness test and conduct inspection: hydrostatic test, FAT, SAT, inspection materials
- Coordination meeting with contractor and subcontractor
- Make NCR (if any)
- Review punch list and review action solution of punch list
- Conducted in Mechanical Completion, Pre-Comm & Comm, and Start-up
- Review MDR from Contractor
- Reporting to management
Senior Mechanical Engineer - PERTAMINA EP - Pagardewa-Prabumulih (PGDP), South Sumatera-Indonesia
(2015-01 - 2017-12)
Built plant for oil and gas process
- Review engineering documents FEED and DED (data sheet, GA drawing, specification, detail drawing, calculation)
- Review QAQC documents (QAQC Manual, drawing, procedure inspection & test, WPS/PQR, ITP and reports)
- Inspection for fabrication of Pressure Vessel (CS & SS)
- Inspection for Running Test for pumps, air compressor and the other rotating equipment.
- Witness test and conduct inspection: hydrostatic test, FAT, SAT, inspection materials
- Coordination meeting with contractor and subcontractor
- Make NCR (if any)
- Review punch list and review action solution of punch list
- Conducted in Mechanical Completion, Pre-Comm & Comm, and Start-up
- Review MDR from Contractor
Senior Mechanical Engineer - KRAKATAU STEEL - Cilegon, Banten-Indonesia
(2017-01 - 2019-12)
Built plant for Hot Strip Mill Production
- Review engineering documents (data sheet, GA drawing, specification, detail drawing, Installation procedures for mechanical equipment)
- Supervision and conduct inspection for installation, modification and field fabrication
- Coordination meeting with contractor and subcontractor
- Make NCR (if any)
- Review punch list and review action solution of punch list
- Conducted in Mechanical Completion, Pre-Comm & Comm, and Start-up
- Review MDR from Contractor
- Reporting to management
Senior Mechanical Engineer - PERTAMINA EP - Karawang and Indramayu (BBS-ABG), West Java-Indonesia
(2019-01 - 2021-12)
Built plant for oil and gas process
- Review engineering documents FEED and DED (data sheet, GA drawing, specification, detail drawing, calculation)
- Review QAQC documents (QAQC Manual, drawing, procedure inspection & test, WPS/PQR, ITP and reports)
- Inspection for fabrication of Storage Tank: Carbon Steel
- Inspection for fabrication of Pressure Vessel (CS & SS)
- Inspection for Running Test for pumps, air compressor and the other rotating equipment
- Witness test and conduct inspection: hydrostatic test, FAT, SAT, inspection materials
- Witness test package and problem solving
- Coordination meeting with contractor and subcontractor
- Make NCR (if any)
- Review punch list and review action solution of punch list
- Conducted in Mechanical Completion, Pre-Comm & Comm, and Start-up
- Problem solving before commissioning, and after commissioning
- Review MDR from Contractor
Senior Mechanical Engineer Consultant - PT Syneco Engineering Indonesia (SEI) - Jakarta, Indonesia
(2023-02)
Engineering Consulting for built Mass Rapid Transport (MRT) at Jakarta area
Senior Consultant of Mechanical Engineer - PERTAMINA EP - West Java-Indonesia
(2023-02)
Project Assignment at Fabricator & Manufacture of Mechanical Equipment for JAS Project. Built plant for oil and gas process
- Review mechanical design engineering
- Review QAQC documents (QAQC Manual, drawing, procedure inspection & test, WPS/PQR, ITP and reports)
- Review report of pressure vessel fabrication (CS & SS)
- Review fabrication report for Fuel Gas Package, Dehydration Unit (DHU), CO2 Removal, Storage Tank
- Review report of: Factory Acceptance Test (FAT), Site Acceptance Test (SAT), inspection materials
- Problem solving for punch list, NCR
- Coordination meeting with contractor and subcontractor
Senior Consultant of Mechanical Engineer - PT Petroflexx Prima Daya - Jakarta and Lhocksukon Aceh, Indonesia
(2023-02)
Project Assignment at EPC Contractor Office and Fabricator & Manufacture of Mechanical Equipment for Gas Facilities Project. Built plant for oil and gas process
- Review mechanical design engineering
- Review QAQC documents (QAQC Manual, drawing, procedure inspection & test, WPS/PQR, ITP and reports)
- Review report of pressure vessel fabrication (CS & SS)
- Review fabrication report for Fuel Gas Package, Dehydration Unit (DHU), CO2 Removal, Storage Tank
- Review report of: Factory Acceptance Test (FAT), Site Acceptance Test (SAT), inspection materials
- Inspection for fabrication of Storage Tank: Carbon Steel
- Inspection for fabrication of Pressure Vessel (CS & SS)
- Inspection for Running Test for pumps, air compressor and the other rotating equipment
- Witness test and conduct inspection: hydrostatic test, FAT, SAT, inspection materials
- Coordination meeting with contractor and subcontractor
- Make NCR (if any)
- Review punch list and review action solution of punch list
- Conducted in Mechanical Completion, Pre-Comm & Comm, and Start-up
- Problem solving before commissioning, and after commissioning
- Review MDR from Contractor
- Problem solving for punch list, NCR