Site Engineer / Specialist Project, OKI-3 Project - PT. OKI PULP & PAPER MILLS - Palembang
(2024-08)
- Assisting and follow up superior instruction
- Arranging, monitoring and report contractor activity at site Project
- Monitoring contractor work, infrastructure, piling, foundation, and construction.
- Preparing Technical Bid Evaluation (TBE) for Project Bidding
- Coordination with contractors, vendors, and other departments
Site Manager / Jababeka Project - JIANGSU SUZHONG CONSTRUCTION GROUP CO., Ltd - Cikarang
(2023-02 - 2023-06)
- Arranging manpower, materials, and daily activity at site project
- Coordination with owner and other party, attending weekly meeting
- Making weekly plan, S curve schedule, maintaining schedule and deviation.
- Making daily activity report, weekly progress and monthly report/progress
- Report and support Project Manager
Geotechnical Engineer / Project : Batang Toru Hydro Electrical Power Plant - PT. SINOTECH ENGINEERING INDONESIA
(2021-08 - 2022-02)
- Monitoring and inspecting the Quality Control of all Geotechical work carrief out by Contractor Engineer
- Reviewing the method of Geotechical works, leading Civil Inspector team for inspection, preparing repot, leading and monitoring Civil Inspector repot before bening submitted to Co-PM
- Assisting Co-PM and Group Leader at site to prepare photos, reports, or other documents if requested by employer
- Carrying out the tasks arranged by the superior especially from the Project Manager and Co-PM
Civil Supervisor / Project : Track Work Jakarta MRT CP-107 Bundaran HI - Lebak Bulus - METRO ONE CONSORTIUM (MOC)
(2017-11 - 2019-01)
- Supervising of subcontractor works, quality inspection with QC and consultant such as formwork, rebars, cleanliness, and concrete during rail track bed casting
- Monitoring of repairing work and maintenance before handover to owner.
- Report activity to Site Manager
Site Engineer, Tunnel Engineer / Project : Construction of Jakarta MRT Underground Section CP-106 - SMCC - HK JO
(2015-03 - 2017-06)
- Follow up Site Manager's instructions to maintain the schedule
- Arranging daily workers for daily activity (site cleaning, dewatering, shifting fence for road divertion, safety work)
- Monitoring sub contractors's scope for Dwall, King Post, station box work (excavation, rebar, and casting concrete)
- Coordination with QC team and Consultant supervisor.
- Arranging daily workers and sub contractors in tunnel for repairing damaged ring concrete segment and cleaning, rail maintenance
- Monitoring tunnel excavation and ring segment assemblying as instruction sheet, monitoring for shifting tbm machine and trolley car for next stage excavation, monitoring tunnel equipments/ facilities dismantling
- Report work results and problems (if any), hand over next schedule to next shift engineer or Site Manager.
Supervisor Engineer / Project : Springhill Terrace Residences Apartment - PT. WARINGIN MEGAH - Kemayoran Jakarta
(2014-04 - 2015-03)
- Monitoring and maintaining work schedule, manpowers, stock materials
- Supervising and Monitoring all of activities at site project, such as excavation, formwork, rebar, and casting concrete,
- Coordination with surveyors, engineers, foreman, and Site Manager/Project Manager
Supervisor Engineer / Project : Ramp Access the Mansion Apartment - PT. WARINGIN MEGAH - Kemayoran, Jakarta
(2013-02 - 2014-04)
- Assisting Site Manager to make progress report, checking in ang out materials
- Arranging workers, coordination with foreman, QC engineers, Site Manager, and Owner Inspectors
Site Engineer / Project : Nippon Sukhobai Indonesia Plant SAP and 2AA - PT. SMCC UTAMA INDONESIA - Anyer - Cilegon
(2012-01 - 2012-10)
- Assisting Site Manager to accelerate the progres
- Supervising all of civil work activities based on the Time Schedule, checking materials quality and quantity
- Arranging the workers and to make sure the work quality as the required specification
- Report daily activities to Site Manager
Cost Estimator - PT. DERIMUDA PATRIA
(2011-07 - 2011-12)
- Estimating and preparing BOQ
- Attending the pre-tender / anweizing meeting, preparing documents for Project tender
Drafter , Site Supervisor / Project : Construction of Jati Junction Housing Store - PT. TIMUR RAYA PERSADA - Jl. Perintis Kemerdekaan Medan - North Sumatera
(2010-10 - 2011-07)
- Preparing construction drawing for tender and revision.
- Coordination with Site Engineer/ Inspectors and contractors on site.
- Ensuring all work as drawing, inform the site engineer if any plan change or revision.
Inspector / Project : Supervision of Stimulus Fiscal Water Resources Sector Project District Karo Fiscal Year 2009 - PT. TIMAN PUTRA CONSULTANT - Kaban Jahe - North Sumatera
(2009-08 - 2009-12)
- Supervising Contractor's activities on site project, ensuring the quality/ quantity as specification required
- Reporting and making daily, weekly, monthly report
- Support the Contractor to prepare back up data and documents for payment claim
Fasilitator / Project : Community Based Settlement Tsunami Rehabilitation and Reconstruction Project (CSRRP) - NGO REKOMPAK - Simeulue Island - NAD Aceh
(2007-08 - 2009-05)
- Fasilitating and guiding the local community how to supervise the housing structure or public facility of their own.
- Guiding the comunity how to make accounting report.
- Report the work progress to Coordinator/ Team Leader
Cost Estimator, Drafter, Project Supervisor / Project : Bridge and Ring Road Project Tanjung Balai - Teluk Nibung Section - PT. SIGE SINAR GEMILANG - Tanjung Balai - North Sumatera
(2006-09 - 2007-07)
- Preparing BOQ and document tender
- Assisting Leader for preparing soft drawing
- Arranging daily activities on site project
- Supporting and Monitoring heavy equipment's activities on site (bulldozer, excavator, vibro roller, crawler crane, dump trucks)
- Assisting General Superintendent, liaising with consultant and owner.
Assisstant of Soil Mechanic Laboratory - UNIVERSITY OF HKBP NOMMENSEN, MEDAN
(2003-03 - 2005-12)
- Educating and guiding the junior students about soil mechanic, soil investigation device, practice and final report, and application.
- Handling soil investigation on site and laboratory and make final result as the client request, such as sonding, standart penetration test, field density.
- Coordination with Head Laboratory and Soil Mechanic Lectures