Lewati ke konten utama
Hendro

Hendro

INSTRUMENT TECHNICIAN

Talenta
PalembangAnggota sejak 26 Juni 2026
TerminationInstall GlandInstall GroundingVerification And Calibration Control ValveTroubleshooting
·

Sewa orang ini

Kirim tawaran pekerjaan langsung ke kandidat ini

TerminationInstall GlandInstall GroundingVerification And Calibration Control ValveTroubleshooting

Tentang

Project Oki Pulp And Paper Mills Phase II - SUMATERA SELATAN

Pengalaman

Instrument Electrical Technician - PT. RASMINDO CONTROMATIC AUTOMASI - SUMATERA SELATAN

(2025-09-17 - 2026-01-17)

Project Oki Pulp And Paper Mills Phase II - SUMATERA SELATAN

  • Termination
  • Install Gland
  • Install Grounding

Instrument Technician - PT. ASUKA - Tanjung Uncang - Batam

(2025-06-30 - 2025-09-12)

ELB Add On CCP 39 MW Project PT. Inti Karya Persada Teknik, Tanjung Uncang - Batam

  • Loop Test All Item Instrument
  • Verification And Calibration Control Valve
  • Function Test Instrument, Fild Device and Troubleshooting

Instrument Technician - PT. SHINBO INDONESIA - Cilegon - Banten

(2024-11-12 - 2025-02-11)

Project PT. Lotte Chemical Indonesia, Cilegon - Banten

  • Loop Test All Item Instrument
  • Continuity From Marshaling Panel-Junction Box Fild
  • Verification And Calibration Control Valve
  • Troubleshooting Limit Switch And Positioner Valve
  • Check Range Transmiter
  • Repair Cable In Panel

Instrument Technician - PT. WIJAYA ENGINDO NUSA - Gresik - Jawa Timur

(2024-05-10 - 2024-08-31)

Manyar Smelter Project, Gresik - Jawa Timur

  • Loop Test All Item Instrument
  • Inspection And Test Plant Document
  • Function Test Instrument, Fild Device and Troubleshooting

Pendidikan

Diploma - Jurusan Teknik Otomotif - SMK YPS PRABUMULIH (2017)

Keterampilan

INSTRUMENT TECHNICIAN

Ulasan