Hendro
INSTRUMENT TECHNICIAN
Sewa orang ini
Kirim tawaran pekerjaan langsung ke kandidat ini
Tentang
Project Oki Pulp And Paper Mills Phase II - SUMATERA SELATAN
Pengalaman
Instrument Electrical Technician - PT. RASMINDO CONTROMATIC AUTOMASI - SUMATERA SELATAN
(2025-09-17 - 2026-01-17)
Project Oki Pulp And Paper Mills Phase II - SUMATERA SELATAN
- Termination
- Install Gland
- Install Grounding
Instrument Technician - PT. ASUKA - Tanjung Uncang - Batam
(2025-06-30 - 2025-09-12)
ELB Add On CCP 39 MW Project PT. Inti Karya Persada Teknik, Tanjung Uncang - Batam
- Loop Test All Item Instrument
- Verification And Calibration Control Valve
- Function Test Instrument, Fild Device and Troubleshooting
Instrument Technician - PT. SHINBO INDONESIA - Cilegon - Banten
(2024-11-12 - 2025-02-11)
Project PT. Lotte Chemical Indonesia, Cilegon - Banten
- Loop Test All Item Instrument
- Continuity From Marshaling Panel-Junction Box Fild
- Verification And Calibration Control Valve
- Troubleshooting Limit Switch And Positioner Valve
- Check Range Transmiter
- Repair Cable In Panel
Instrument Technician - PT. WIJAYA ENGINDO NUSA - Gresik - Jawa Timur
(2024-05-10 - 2024-08-31)
Manyar Smelter Project, Gresik - Jawa Timur
- Loop Test All Item Instrument
- Inspection And Test Plant Document
- Function Test Instrument, Fild Device and Troubleshooting
Pendidikan
Diploma - Jurusan Teknik Otomotif - SMK YPS PRABUMULIH (2017)
