Business Development at PT Raharja Bara Indonesia (2023-06 – 2025-12)
Mining company focus on coal offtaker, funding and coal trading
- Increasing total volume coal sales by 30% per year which previously was only 200.000 tonnes per year to 260.000 tonnes of coal per year.
- Succesfully secured long term contract (2 years) for a volume 200.000 tonnes per year with end user in philippines and vietnam.
- Advising the company director to sign a joint operation MoU with miner for increase coal production capacity by 25% from the previous level.
- Managing hauling time to align with the transhipment schedule to avoid demurrage due to cargo delays.
- Reducing cargo rejection rate by client by 95% thought quality control at the stockpile and port loading.
- Increase the avarage selling price by 7% through the sale high-calorie coal >5800GAR.
Geologist at PT Masindo Intienergy Perkasa (2022-07 – 2023-04)
Company coal concession which focus on port rental and mining coal production
- Finding the new prospect area that was previously mining concession, this land just remnant of an old mine and only relied on jetty rental,then using touch core drilling system,resulting in a reserve 120.000 tonnes of coal with qualty <7000GAR.
- Presenting the coal model design to the mine plan engineer for the pit design creation as a reference for the first cut of mining contractor,one week faster then the one-month timeframe given.
- Providing an area for new pit in the former mining site,which has been mine out using the infill drill method,resulting in an additional reserve 10.000 tonnes of coal.
- 30% exploration budget efficiency by hiring a driling team and purchasing drilling equiment ourselves without involving third parties as before.
- Assisting the operation team by supervising the contractor to ensure their plans align with the weekly and monthly design for minimising deviations between the plan and actual.
Pit Control Engineer at PT Berlian Duta Energi (2022-01 – 2022-07)
Mining contractor member of SMP Group
- Aligning the mine engineering plan with daily or weekly field conditions, ensuring striping ratio and production targets are achieved.
- Improving equipment productivity by arranging placement, minimising idle time, and ensuring truck cycle time efficiency.
- Ensuring mining progress aligns with engineering design and minimising deviations
- Ensuring that all operational activities in the pit comply with safety standards to reduce the risk of workplace accidents.
- Operational cost efficiency through optimisation of fuel use and equipment productivity.
- Reducing obstacles in the material hauling and loading flow.
- Ensuring slope stability and operational safety in the work area.
- active in the creation of daily work orders and short-term mine plans.
Geologist & Mine Engineer at PT Mitra Baratama Sinergi (2018-03 – 2021-07)
Mining contractor member of mitra coal which focus on joint operation
- Increasing coal reserves by 10% from 370.000 tonnes to 407.000 tonnes with infill drilling.
- Succesfully identified a new prospect area amounting to 30% of the existing design strike lenght.
- Saving the exploration budget by 15% by optimising the spacing drill points without reducing the accuracy of the coal model.
- Completed core logging 1200 meters in two month,exceeding team's target by 20%
- Managing the reconciliation of geological model data with actual survey data (coal roof floor) and coal stockpile data,achieving 97% accuracy.
- Reducing coal contamination by 15%-20% through strict supervision during excavation,coal cleaning and coal getting.
- Reducing the cycle time of hauler by 10%, through front loading management, disposal management and improving the geometry of mine road.
- Reducing fuel consumtion all hauler by 3% by uptimising road grade from 11% to 9%.
- Reducing the avarage of striping ratio from 1:9 to 1:8 in two months through detailed ground topography and pit redesign with the same amount of coal as before.
- Reducing coal loss from the planned 5% to 3% through strict supervision during the cleaning of the coal roof and during the coal getting process in the section close to coal floor.
- Achieving a coal production target of 110% exceeding the planned target 600.000 tonnes to 660.000 tonnes per year.
- Achieving zero incidents for 12 consecutive months.
Geologist Assistant at PT KTC Coal Mining & Energy (2017-02 – 2017-11)
Mining contractor which focus on high GAR and coking coal
- Succesfully conducted lithology and coal logging with accuracy level 97% to be used by senior gelogist in resources calculation and coal modelling.
- Conducting mapping of outcrops and gelogical structures in a 100-hectares operational area with 95% data accuracy.
- Succesfully cored coking coal with very brittle characteristic when hit by drill bit, achieving a core recovery above 90%.
- Capable of compiling daily and monthly report systematically and on time into the geology database.
- Overcoming various field obstacles by collaborating with the driller and team.