Project Management Officer – Fiber Optic for XLSmart Project at PT Tower Bersama Group, Tbk (2025-10 – 2026-07)
- Ensure 100% execution of all received orders through structured DRM (Design Route Mapping) process with customers
- Plan and determine optical cable routes and calculate detailed material requirements (optical cables, ODP, HDPE, poles, closures, etc.) for projects covering thousands of connection points
- Coordinate with stakeholders and multi-teams as a bridge to determine area scope and manage permits for designated routes
- Function as Quality Control lead – ensuring teams follow work procedures including APD (PPE), standard tools, and safety signage installation
- Create and present daily, weekly, and monthly activity progress reports to management and customers
- Plan, schedule, and oversee Quality Inspection – ensuring OTDR results show no fiber breaks, no strange reflections, and no excessive attenuation
- Ensure all ODP/ODC ports are correctly labeled according to GIS database before handover to operational team or customer
- Oversee documentation process including closing punch lists for electrical systems to ensure complete handover
Project Implementation Coordinator – Telkomsel Project BALINUSRA Area at PT AVIAT Solusi Komunikasi (2024-01 – 2024-05)
- Ensure all orders received are executed properly
- Ensure materials for installation and ensure all request is completed and ready to use
- Ensure the Installation team readiness
- Manage and oversee the installation & testing process running well by installation team
- Planning, scheduling, and oversees the pre-commissioning and commissioning process
- Planning, scheduling, and oversee the Quality Inspection and provide Quality Check List together with QC team or engineering
- Oversee documentation process including closing the punch list of electrical system to ensure the handover are completed
- Create & Present the activity progress report by daily, weekly, and monthly basis
Project Implementation Support at PT NEC Indonesia (2017-12 – 2023-12)
For Telkomsel Project PUMA & BALINUSRA Area - Regional Project Manager (Jul 2020 – Dec 2023) For Telkomsel Project KALIMANTAN Area - Regional Project Coordinator (Dec 2017 – Jul 2020)
- Conducted intensive coordination with customers regarding orders
- Ensured 100% order execution with proper material and installation team readiness
- Managed and oversaw installation & testing processes
- Planned, scheduled, and oversaw pre-commissioning & commissioning processes
- Planned and scheduled Quality Inspection with QC team/engineering
- Oversaw documentation and punch list closure for complete handover
- Created and presented daily, weekly, and monthly progress reports
- Ensured proper installation performance to facilitate smooth invoicing process – including monitoring and tracking invoicing
Project Implementation Coordinator – PT AVIAT / Telkomsel Project BALINUSRA Area at PT ESATEL BUMI INDONESIA (2025-02 – 2025-09)
- Ensured all orders received were executed properly
- Managed material readiness and ensured all requests were completed and ready for use
- Prepared and ensured installation team readiness (puluhan technicians)
- Managed and oversaw installation & testing processes running smoothly
- Planned, scheduled, and oversaw pre-commissioning & commissioning processes
- Coordinated Quality Inspection and provided Quality Check List together with QC team or engineering
- Oversaw documentation process including closing punch lists for handover completion
- Created and presented daily, weekly, and monthly progress reports
Area Coordinator / Technical Coordinator / Field Operation at PT Huawei Service (2012-08 – 2017-06)
Area Coordinator for XL Axiata Tbk, Jul 2016 – Jun 2017 Technical Coordinator for XL Axiata Tbk, Dec 2015 – Jun 2016 Field Operation for XL Axiata Tbk, 2012 – Nov 2015
- Maintain all equipment on sites, and ensure the all equipment is functioning properly
- Monitor the performance of equipment to find out if damage or loss occurs
- Immediately perform troubleshooting on devices detected as having problems, including transmission, BTS, generator, power supply, electricity and trace the cause
Field Operation at PT XL Axiata Tbk (2011-08 – 2012-08)
- Maintain all equipment on sites, and ensure the all equipment is functioning properly
- Monitor the performance of equipment to find out if damage or loss occurs
- Immediately perform troubleshooting on devices detected as having problems, including transmission, BTS, generator, power supply, electricity and trace the cause
Transmission Engineer – For Ericsson / Telkomsel Project Sumbagsel Area at PT JAVACELL (2010-06 – 2011-08)
- Ensure completeness of equipment for commissioning and troubleshooting transmission
- Perform E1 cross connect on B2B transmission system from site to site to BSC
- Conduct testing and check that the E1 that has been cross-connected has penetrated to the BSC
- Create a report document that the work has been completed and is in accordance with the given scenario
Field Engineer – For Ericsson / Telkomsel Project at PT Putra Alinson Perkasa (2007-08 – 2010-06)
- Perform pre-comm and commissioning on devices that have been installed
- create a reporting document that the device is ready to go on air
Project Manager – For Ericsson / XL Axiata Project at PT Evantama Network System (2017-07 – 2017-11)
- Approached customers to secure orders
- Provided manpower as installation team based on customer requirements (puluhan personnel)
- Equipped teams with certified equipment to meet installation standardization
- Provided regular customer updates on work activities to ensure results met expectations
- Managed project budget controlling – both CAPEX and OPEX
- Controlled and monitored team performance in completing orders, including proper post-completion documentation
- Managed invoicing process from document submission to payment completion