Rusli Imran
Telecommunication Engineer | Project Management | Fiber Optic Rollout
Sewa orang ini
Kirim tawaran pekerjaan langsung ke kandidat ini
Tentang
A Telecommunications Engineer with over 19 years of experience in field operations and transmission project implementation. Proven track record as Area Project Manager, Project Implementation Coordinator, and Technical Coordinator for industry leaders including Tower Bersama Group, NEC, Huawei, Telkomsel, IOH, XL Axiata. Successfully managed fiber optic projects covering 10,000+ km of cable rollout, thousands of ODPs/households connected, and project values in the billions of rupiah.
Expert in end-to-end project lifecycle from route planning, permitting, quality control, to handover.
Pengalaman
Project Management Officer – Fiber Optic for XLSmart Project at PT Tower Bersama Group, Tbk (2025-10 – 2026-07)
- Ensure 100% execution of all received orders through structured DRM (Design Route Mapping) process with customers
- Plan and determine optical cable routes and calculate detailed material requirements (optical cables, ODP, HDPE, poles, closures, etc.) for projects covering thousands of connection points
- Coordinate with stakeholders and multi-teams as a bridge to determine area scope and manage permits for designated routes
- Function as Quality Control lead – ensuring teams follow work procedures including APD (PPE), standard tools, and safety signage installation
- Create and present daily, weekly, and monthly activity progress reports to management and customers
- Plan, schedule, and oversee Quality Inspection – ensuring OTDR results show no fiber breaks, no strange reflections, and no excessive attenuation
- Ensure all ODP/ODC ports are correctly labeled according to GIS database before handover to operational team or customer
- Oversee documentation process including closing punch lists for electrical systems to ensure complete handover
Project Implementation Coordinator – Telkomsel Project BALINUSRA Area at PT AVIAT Solusi Komunikasi (2024-01 – 2024-05)
- Ensure all orders received are executed properly
- Ensure materials for installation and ensure all request is completed and ready to use
- Ensure the Installation team readiness
- Manage and oversee the installation & testing process running well by installation team
- Planning, scheduling, and oversees the pre-commissioning and commissioning process
- Planning, scheduling, and oversee the Quality Inspection and provide Quality Check List together with QC team or engineering
- Oversee documentation process including closing the punch list of electrical system to ensure the handover are completed
- Create & Present the activity progress report by daily, weekly, and monthly basis
Project Implementation Support at PT NEC Indonesia (2017-12 – 2023-12)
For Telkomsel Project PUMA & BALINUSRA Area - Regional Project Manager (Jul 2020 – Dec 2023) For Telkomsel Project KALIMANTAN Area - Regional Project Coordinator (Dec 2017 – Jul 2020)
- Conducted intensive coordination with customers regarding orders
- Ensured 100% order execution with proper material and installation team readiness
- Managed and oversaw installation & testing processes
- Planned, scheduled, and oversaw pre-commissioning & commissioning processes
- Planned and scheduled Quality Inspection with QC team/engineering
- Oversaw documentation and punch list closure for complete handover
- Created and presented daily, weekly, and monthly progress reports
- Ensured proper installation performance to facilitate smooth invoicing process – including monitoring and tracking invoicing
Project Implementation Coordinator – PT AVIAT / Telkomsel Project BALINUSRA Area at PT ESATEL BUMI INDONESIA (2025-02 – 2025-09)
- Ensured all orders received were executed properly
- Managed material readiness and ensured all requests were completed and ready for use
- Prepared and ensured installation team readiness (puluhan technicians)
- Managed and oversaw installation & testing processes running smoothly
- Planned, scheduled, and oversaw pre-commissioning & commissioning processes
- Coordinated Quality Inspection and provided Quality Check List together with QC team or engineering
- Oversaw documentation process including closing punch lists for handover completion
- Created and presented daily, weekly, and monthly progress reports
Area Coordinator / Technical Coordinator / Field Operation at PT Huawei Service (2012-08 – 2017-06)
Area Coordinator for XL Axiata Tbk, Jul 2016 – Jun 2017 Technical Coordinator for XL Axiata Tbk, Dec 2015 – Jun 2016 Field Operation for XL Axiata Tbk, 2012 – Nov 2015
- Maintain all equipment on sites, and ensure the all equipment is functioning properly
- Monitor the performance of equipment to find out if damage or loss occurs
- Immediately perform troubleshooting on devices detected as having problems, including transmission, BTS, generator, power supply, electricity and trace the cause
Field Operation at PT XL Axiata Tbk (2011-08 – 2012-08)
- Maintain all equipment on sites, and ensure the all equipment is functioning properly
- Monitor the performance of equipment to find out if damage or loss occurs
- Immediately perform troubleshooting on devices detected as having problems, including transmission, BTS, generator, power supply, electricity and trace the cause
Transmission Engineer – For Ericsson / Telkomsel Project Sumbagsel Area at PT JAVACELL (2010-06 – 2011-08)
- Ensure completeness of equipment for commissioning and troubleshooting transmission
- Perform E1 cross connect on B2B transmission system from site to site to BSC
- Conduct testing and check that the E1 that has been cross-connected has penetrated to the BSC
- Create a report document that the work has been completed and is in accordance with the given scenario
Field Engineer – For Ericsson / Telkomsel Project at PT Putra Alinson Perkasa (2007-08 – 2010-06)
- Perform pre-comm and commissioning on devices that have been installed
- create a reporting document that the device is ready to go on air
Project Manager – For Ericsson / XL Axiata Project at PT Evantama Network System (2017-07 – 2017-11)
- Approached customers to secure orders
- Provided manpower as installation team based on customer requirements (puluhan personnel)
- Equipped teams with certified equipment to meet installation standardization
- Provided regular customer updates on work activities to ensure results met expectations
- Managed project budget controlling – both CAPEX and OPEX
- Controlled and monitored team performance in completing orders, including proper post-completion documentation
- Managed invoicing process from document submission to payment completion
Pendidikan
Bachelor of Engineering in Electrical Engineering – NASIONAL University – Jakarta, Indonesia (1999 – 2006)