Sr. Supplier Quality Engineer at Turnberry Solutions (Contracting to Johnson and Johnson) (2024-03 – 2026-06)
Interface with Johnson and Johnson supply base (~200 suppliers & multiple validations per supplier) to validate their 2D DataMatrix process, by either laser etching, machine engraving chemical etching or other for the EU MDR UDI requirements. Review, process and approve validation documents through Windchill. Once the suppliers process was validated, developed method of implementing 2D DataMatrix at suppliers using a PVE, due to drawings already stating 2D requirements and process specifications stating non-mandatory.
- Implemented 2D DataMatrix processes with over 40 suppliers with the PVE process
- Supported over 32 validation with suppliers
Sr. Technical Project Manager at Turnberry Solutions (Contracting to Johnson and Johnson) (2021-03 – 2024-03)
- Collaborate with SQE's to identify thousands of SKUs produced by suppliers requiring AIDC or 2D Matrix mark for the EU-MDR regulations
- Help define roles and processes of team members for a multi-year project
- Meet with suppliers to instruct and collaborate with over 290 supplier process validations
Sr. Technical Project Manager at Turnberry Solutions/Tata Consultancy Services (Johnson and Johnson) (2018-05 – 2021-03)
- Capture Customer and stakeholder requirements for the development of process equipment for medical instrument supply line for the new EU-MDR UDI
- Design Process flow, Develop PFMEA, Manage Project Risks and Expectations for new equipment and new processes
- Preparing, scheduling, coordinating and monitoring the assigned engineering projects
- Interacting daily with the clients to interpret their needs and requirements and representing them in the field
Sr. Technical Project Manager (Medical Device Business Unit) at Auer Precision Company, Inc. (2015-03 – 2016-03)
- Design Process flow and equipment layout using DraftSight (AutoCAD)
- Developed PFMEA for all processes; URS's, Functional Specs and Design Specs for process equipment
- Work with Design Engineering for fixtures, tooling and equipment components
- Knowledge of statistical analysis for conducting Design of Experiments (DOE's) for statistical equivalence comparisons and optimization
- Experience developing IQ, OQ and PQ validations
Directional Drilling Engineer/Project Manager at Halliburton Energy Services, Sperry Drilling (2012-01 – 2014-01)
- Provide on-site supervision of the Directional Drilling process including projection of well path to pre-determined target coordinates as required by well design plans, directional survey information and another well-site information
- Determines project schedule by studying project plan and specifications; calculating time requirements; sequencing project elements
Senior Project Engineer: Hard Body Armor and Special Projects at BAE Systems, Security and Survivability (2010-03 – 2011-03)
- Worked on converting obsolete military grade hard armor designs found in inventory to commercial grade designs used by law enforcement and international sales
- Translated customer order processes into Engineering projects and production
- Reviewed and corrected all internally controlled engineering process documents for consistency with all corporate level process mandates
- Perform overall quality control of the work (budget, schedule, plans, personnel's performance) and report regularly on project status
- Assign responsibilities and mentor project team
Senior Project Manager III: Hard and Soft Body Armor at BAE Systems, Security and Survivability (2008-03 – 2010-03)
- Defined objectives, scopes and strategies of projects, coordinated between multi-discipline departments to respond to Government solicitations
- Once project acquired, developed and tracked program milestones and budgets, managed risk and opportunities
- Prepared and delivered monthly program and contract status
- Interfaced with contracts, planning and mfg to initiate sales orders, work orders and mitigated any mfg roadblocks
- Worked with the corporate legal counsel and program office to Novate SOCOM SPEAR contract from one entity of BAE systems to another
Senior Project Engineer (Helmet Accoutrement Design) at BAE Systems (Armor Holdings prior to 2007), Security and Survivability (2006-02 – 2008-03)
- Established an infrastructure to design and prototype combat helmet concepts
- Established requirements and designed electronic accoutrements for the advanced combat helmet
- Defined requirements for advanced combat helmet integration and evaluated the performance and functionality against military specifications for First Article Testing
CAD Engineering: ProE/Wildfire and Autocad at BAE Systems (Armor Holdings), Security and Survivability (2005-10 – 2006-02)
Managed the writing and processing of ECO's, utilizing Pro-Engineering Wildfire and AutoCAD 2006 for drafting full drawing package of advanced technology Armor plating, Aircraft Seats, and parachute systems to ANSI Y14 specifications.
Technical Project Manager for Equipment Electrical Test Tooling (R&D) at Intel Corporation (1999-01 – 2005-01)
- Defined requirements such as materials electrical and mechanical properties and all equipment and product interfaces; resulting design would be an integrated socket within the automated equipment, reliably making 100% electrical contact of all contact pins for more than 20,000 cycles without any issues
- Executed Request for Information (RFI's) processes with suppliers, generated Purchase Specification (Design) requirements, and reviewed Design Concepts with competing BIS supply pool
- Created Burn-in socket qualification methodology consisting of work instructions, accompanying data collections sheets
- Methodology streamlined and standardized plans and reporting of the qualification process
- Qualification process earned Intel Manufacturing Excellence Award status in 2000 and is a model to BIS suppliers for standardizing qualification tests
Equipment & Process Development Engineer (R&D), Laser and Manual Inspection, Packing and MVQA at Intel Corporation (1997-01 – 1998-10)
- Defined Module Target Spec from product inception (Discovery Phase) to technology transfer to our off-shore facilities
- Design Process flow and equipment layout and optimized processes for high volume manufacturing
- Produced collaterals such as Equipment Data Sheets, Safety Level check sheets, definition of the equipment and process layout and other module collaterals to establish process Reference Cell; creation of Operational and Maintenance Specs, Level I and II training material, PM schemes, and the module qualification protocol