PLANT HEAD - ALPINE DISTILLERIES PVT. LTD. - HOOGHLY, WEST BENGAL
(2013-10)
From 01/02/22, this service is on contractual basis till date.
- Total responsibility of planning, production, manpower handling with great productivity
- Manpower team of 8 executives, 4 technicians, 22 machine operators and 98 workers
- Quality control at minimum cost
- Monitoring maintenance schedule of entire plant, administration control
- CAPEX preparation
- Maintenance vendors and supply chain developing and co-ordinating
- Health and safety management, renewal of mandatory every legal formalities of plant
PROJECT HEAD - ALPINE DISTILLERIES PVT. LTD. - HOOGHLY, WEST BENGAL
(2011-01 - 2013-09)
- Preparing project report, bank coordination for audit, drawing execution
- Planning & execution of entire project
- Modification of drawing and coordinating with vendor to maintain a schedule of start & control the budget
- Civil, mechanical, electrical work execution
- Total administration control
- Successfully completions of two projects and plant commissioning from January 2011 to September 2013
EXECUTIVE (MANUFACTURING) - PARAG BREWERIES LTD. (A PART OF CARLSBERG GROUP) - HOOGHLY, WEST BENGAL
(2009-05 - 2011-01)
- Planning for production & execution as per schedule
- Preparation of S.O.P. and its application to increase productivity and reduce cost
- Documentation & execute preventive maintenance with T.B.M. & lubrication management in packaging as well as utility and process area
- Daily reports and maintenance schedule were prepared on 'SAP'
ASSISTANT ENGINEER (MAINTENANCE) - PARAG BREWERIES LTD. (A PART OF CARLSBERG GROUP) - HOOGHLY, WEST BENGAL
(2007-03 - 2009-05)
- Maintenance of utility section including water treatment plant, boiler, refrigeration & carbon di oxide recovery plant
- Maintenance of brew house equipment, packing hall machines and E.T.P.
- Earlier in project time: execution and monitoring of erection, installation & commissioning of equipment and machines like boiler, W.T.P, refrigeration, E.T.P & packing hall machineries
- Structural work including utility pipeline
OVERSEER (PLANT) GRADE-II - SIMPLEX INFRASTRUCTURES LIMITED
(2001-03 - 2007-02)
Client: KMC. Project: Sewerage & Drainage; Client: GAMUDA (Malaysia). Project: NHAI (Durgapur Expressway)
- Sewerage pumping station making and commissioning
- Supervision of pipe line work, fabrication & erection of gantry and H-frame
- Maintenance of plant & machine used in construction field
- Fabrication & erection of heavy steel structure likes steel girders, columns, truss, bracing, monorail, and portal etc.
- Shaktigarh 4 lane ROB and Singur 2 lane ROB steel structure fabrication and erection
GOI TRAINEE - HIND LEVER CHEMICAL LIMITED - HALDIA
Four months trainee on utility section
- Water treatment
- Boiler operations