Aditya Kumar
Mechanical engineer
Hire this person
Send a job offer directly to this candidate
About
Mechanical Engineering graduate with 5+ years of specialized experience in PEB and heavy steel structure erection. Expert in structural alignment tolerances, heavy rigging, and leakage-free sheeting execution. Seeking a challenging site execution role with a leading construction firm to deliver mega-scale industrial projects on time.
Experience
PEB (Steel Structure) Erection Engineer at Kirby Building Systems India Pvt. Ltd. (2025-10 – Present)
Project: TATA Semiconductor Assembly and Test; Client: TATA Projects India Ltd.; Tonnage:- 11,300MT / 40770 SQM
- Overseeing the structural steel erection for an 11,300 MT (40,770 Sqm) semiconductor facility.
- Authorizing technical drawings, verifying engineering plans, and ensuring structural alignments match strict design tolerances.
- Coordinating with the customer to manage storage yards and establish optimized approach paths for heavy crane movements.
- Preparing daily progress reports (DPR) and tracking on-site manpower and equipment deployment against the master schedule.
- Providing technical advice & suggestion for improvement on particular project.
- Ensuring materials lifting & shifting in safe method.
- Preparing the checklists for different works.
- Analyze & monitor entire site that the work is in line with schedule & as per plan
- Completing quality assurance & providing feedback to the team.
PEB (Steel Structure) Erection Engineer at Steel Infra Solution Pvt. Ltd. (2025-03 – 2025-09)
Project: MAHSR (bullet train depot); Client: NHSRCL Sabarmati, Gujarat; Tonnage:- 9986MT / 71500 SQM
- Successfully managed site execution and erection sequence for a high-tonnage (9,986 MT 71,500 Sqm) bullet train depot.
- Executed zero-accident operations by rigorously implementing JSA safety guidelines and structural lifting plans.
- Facilitated 3rd-party fitness certifications for all critical rigging tools, cranes, and site tackles before operations.
- Compiled quality assurance reports and performed visual weld, torque, and alignment checks before structural sign-offs.
- Planning as per materials & equipment availability.
- Organizing materials & ensuring sites are safe & clean.
- Ensuring appropriate materials & tools are available.
PEB (Steel Structure) Erection Engineer at Surya Electromech Pvt. Ltd. (2021-06 – 2025-02)
Project 1: MEZZANINE Building
• Client: Dr. Reddy’s Labs, Vizag
• Tonnage:-510 MT / 4,860 Sqm Project 2: MTB6 High Rise Building
• Client: L&T, Whitefield Bengaluru
• Tonnage:-4,500 MT / 65,000 Sqm Project 3: Site Office &
• Canteen Building
• Client: Saint Gobain Glass, Chennai
• Tonnage:-288 MT / 1,350 Sqm Project 4: PEB Warehouse Phase 1 & 2
• Client: ATC Tires/Kirby, Vizag
• Tonnage:-4,025 MT / 90,265 Sqm Project 5: Mezzanine Buildings &
• Conveyor Galleries
• Client: Saint Gobain, Rajasthan &
• Vizag
• Tonnage:-Total 2,070 MT
- Supervised civil-mechanical handovers by executing anchor bolt setting records signed off by clients and consultants.
- Provided technical advice on-site to optimize erection schedules, reducing structural assembly bottlenecks.
- Organizing materials & ensuring sites are safe & clean.
- Ensuring appropriate materials & tools are available.
- Capture the details of Manpower & equipment actually deployed at the site.
- Ensuring good workmanship & zero leakages at the site.
- Pioneered mandatory on-site mock-up training for sheeting teams, eliminating roof leakage and improving craftsmanship.
- Prepare Daily progress reports.
- Controlled site inventory, verified incoming PEB components against the Bill of Materials (BOM), and planned material shifting.
- Drafted and updated weekly work schedules, proactively communicating adjustment plans to stakeholders during delays.
Education
B.tech in Mechanical engineering – IES Institute of technology, BHOPAL (2018 – 2021)
Diploma in Mechanical engineering – HMS polytechnic (govt aided), TUMKUR (2015 – 2018)
High school – GSVM High school, PACHRUKHI (2015)
