Supervisor
Send a job offer directly to this candidate
Working at the water treatment plant where power work involves Lt cable laying & looping, cable glands & termination, cable tray laying, lighting arrester earthing pipe work, earthing plate work, wiring and conduit light fixing work, and earthing strips running 25/3 & 50/6.
Supervisor - Shree Power Engineering Pvt. Ltd. - DURGAPUR
(2022-01)
Working at the water treatment plant where power work involves Lt cable laying & looping, cable glands & termination, cable tray laying, lighting arrester earthing pipe work, earthing plate work, wiring and conduit light fixing work, and earthing strips running 25/3 & 50/6.
Helper - JSW Steel Plant - KARNATAKA
(2020-10 - 2021-12)
Performed cable tray laying, gland and termination. Performed Ht and Lt cable laying and looping. The job involved 3 phase motor continuity checking, in addition to wiring and conduit lighting work.
Assembly Machine Operator - Valeo Lighting System - CHENNAI
(2019-07 - 2020-09)
Worked at the 4-wheeler head lamp assembly line for Maruti Suzuki units such as NEXA and WagonR.
Diploma - Electrical Engineering - Maulana Abul Kalam Azad University of Technology (2019-06)
Senior Secondary (10+2) - Bihar School Examination Board (2015-05)
Higher Secondary (10th) - Bihar School Examination Board (2012-05)