Skip to main content
Anshul Verma

Anshul Verma

Lab Technician

Talent
UnnāoMember since July 4, 2026
Soil testConcrete testBituminous testAggregate testGSB and WMM testCement testDLC and PQC
·

Hire this person

Send a job offer directly to this candidate

Soil testConcrete testBituminous testAggregate testGSB and WMM test

About

Construction Of 2-Lane with Paved Shoulder Configuration of Khilchipur Bypass of Length 5.500 Km. (From 0+000 to 5.500, Total Design Length 5.500km) Section of NH-752B in the State of Madhya Pradesh under EPC Mode. Client: PWD-MORTH

Experience

Lab Technician - SBCC Infra Pvt Ltd - Raigarh, Madhya Pradesh

(2023-04)

Construction Of 2-Lane with Paved Shoulder Configuration of Khilchipur Bypass of Length 5.500 Km. (From 0+000 to 5.500, Total Design Length 5.500km) Section of NH-752B in the State of Madhya Pradesh under EPC Mode. Client: PWD-MORTH

  • Soil test
  • Concrete test
  • Bituminous test
  • Aggregate test
  • GSB and WMM test
  • Cement test
  • DLC and PQC

Lab Technician - Dilip Buildcon Ltd - Nagpur, Maharashtra

(2021-09 - 2023-04)

Saoner to Gondhkhiari 4 Lanning from km 4.700 to km 33.575 in the state of Maharashtra on EPC mode. Client: NHAI

  • Soil test
  • Concrete test
  • Bituminous test
  • Aggregate test
  • GSB and WMM test
  • Cement test
  • DLC and PQC

Education

Intermediate (2020)

Skills

Lab Technician

Reviews

Related