Manager-Operations - Zion Engineering Services and consultancy - India
(2024-10)
The unit comprises of the following plants
- 2MW Power plant, ALBA Titania, Tuticorin
- 1MW Power Plant, Ayya Ricemill, Thanjavur
- Kinyara Sugars 40TPH Boiler Commissioning work, UGANDA
Commissioning Shift Engineer - Dangote cements - Nigeria
(2024-02 - 2024-05)
The unit comprises of the following plants
- Working in the Yokogawa DCS System
- Capacity of 1x30 MW, Air cooled condensate Turbine with 3 Extractions at Main Steam Parameter 540°C Temperature, 110 Kg/Cm2 Pressure
- Turbine make Siemens
- Capacity of 1 x130TPH Boiler make Thermax
Commissioning Engineer - BW ENERGY KAZAKHSTAN LLP - Kazakhstan
(2023-02 - 2023-10)
Client: TENGIZCHEVROIL PROJECT, KAZAKHSTAN. The unit comprises of the following plants
- Simple cycle Gas turbine 5x132MW make Baker Hughes GEFrame9E
- Boiler Capacity of 3x291.5TPH Make MACCHI, at Main Steam parameters 371°C Temperature, 83 Kg/Cm2 pressure
- Working in the Yokogawa DCS system
- Capacity of 2x24.25MW, Aircooled condensate Turbine with 3 Extractions at Main Steam Parameter 510°C Temperature, 86 Kg/Cm2 Pressure
- Turbine make Shin Nippon Machineries Limited
- Capacity of 2x130TPH Boiler Make Thermax
Senior Executive Officer - Chemplast Sanmar Limited - Tamilnadu, India
(2019-08 - 2023-01)
The unit comprises of the following plants
- Working in the Yokogawa DCS system
- Capacity of 2x24.25MW, Aircooled condensate Turbine with 3 Extractions at Main Steam Parameter 510°C Temperature, 86 Kg/Cm2 Pressure
- Turbine make Shin Nippon Machineries Limited
- Capacity of 2x130TPH Boiler Make Thermax
Commissioning Engineer - Smaragda Solutions LLP - Pune, India
(2018-08 - 2019-07)
Working Plant: Arignar Anna Sugar Mills Limited
- Working in the ABB DCS System
- Capacity of 15MW, Aircooled condensate Turbine with 3 Extractions at Main Steam parameter 510°C Temperature, 86 KG/Cm2 pressure
- Turbine Make Siemens (12 stages)
- Capacity of 80TPH Boiler Make Walchand Nagar
Desk Engineer - Thermax Limited - Pune, India
(2013-12 - 2016-05)
Client: DCW Limited, Tuticorin, India
Shift Engineer - Uttam Energy Limited - Pune, India
(2017-08 - 2018-07)
Client: Isabella La Suerte Ricemill Corporation, Philippines
- Working in the Honeywell DCS system
- Capacity of 5MW, Aircooled condensing Turbine with Single Extraction at Main Steam parameter 490°C Temperature, 67 kg/Cm2 pressure
- Turbine Make Shin Nippon Machineries Limited
- Capacity of 25TPH Boiler Make Uttam
Shift Engineer - Thermax Limited - India
(2016-05 - 2016-12)
Client: Bicol Biomass Energy corporation Philippines
- Working in the Honeywell DCS system
- Capacity of 2X25MW, 1x8.27MW Water cooled condensing Turbine with 3 Extractions at Main Steam parameter 515°C Temperature, 86 kg/Cm2 pressure
- Turbine Make Shin Nippon Machineries Limited
- Capacity of 2x125TPH Boiler Make Thermax
Desk Engineer - OEG India Pvt. Ltd. - India
(2009-04 - 2013-12)
Client: Sunvik Steels Pvt. Ltd.
- Working in the ABB DCS system
- Capacity of 1X10MW, aircooled condensing Turbine with single bleed at Main Steam parameter 495°C Temperature, 69 kg/Cm2 pressure
- Turbine Make Siemens
- Capacity of 1x25TPH AFBC, 3x10 TPH WHRB Boiler Make Cheema Boiler
- Monitoring and recording the parameters in DCS as well as local of Steam Turbine & Auxiliary systems
- Pays Particular attention to safety by ensuring safe working practice and environment form and machinery
- Planning, controlling & supervising safe, reliable and smooth plant operation, startup, shutdown and emergency conditions
- Having experience on load dispatch in accordance with Regional Load Dispatch Centre instruction
- Conducting the scheduled and emergency change overs for reliable and smooth plant operation
- Handling mechanical & electrical isolation of various equipments & drives as per lockout & tagout procedure
- Coordinating with maintenance department for various kinds of maintenance
- Preparing reports (Generation report, Start-up report, Monthly report etc.)
- Reporting to higher officials regarding plant activities
- Operation and monitoring of Balance of plants equipments through DCS
- Unit start-up and shut down activities through DCS from Control room
- Involves isolation & normalization of system as per approves Permit to Work System
- Preparation of Checklists and log Sheets
- Preparation and implementation of various standard operating procedures
- Inspection of Turbine as per P&I Drawing
- Carryout Steam boil out of turbine as per standard
- Checking of starting permissive and trip logic
- Co-ordination with Technical drawings/Design department for necessary changes in routing of piping
- Having good experience Hydrotesting high pressure boiler
- Carry out commissioning of Turbine System
- Responsible for Overhauling, breakdown, Regular and preventive maintenance of Boiler feed pumps, Condensate Extraction Pumps, Oil Centrifuge Pumps, CW Pumps, CT Fans, turbine auxiliaries
- Turbine steamline parallelity with stop valve flange
- Performing Turbine rolling and checking of protecting system
- Heater tube side chemical cleaning
- Performing Vacuum fill test
- Very Efficient Startup works, Safe shut down work of the plant BoilerFeed Pump Startup, safe Shut down and Trial works handling