32 year experience as Structural Engineer, In managing entire Projects with good amount of exposure in structural, fabrication, erection & timely execution of project. Earlier responsible for Production and profitability of fabrication unit Business responsible for Marketing, Production, Sales.
Presently Heading Upstream
Project as Head Structures
Experience
Sr. General Manager at Arcelor Mittal Nippon Steel Pvt Ltd. (2022-05 – Present)
Heading the Fabrication and Erection of steel Structures of Upstream Project which Includes 2 Nos. Blast furnace, Steel Melting Plant, Hot strip Mill, RMHS, Balance of Plant.
- Ensure the Execution is done in safe manner, Review of SOP, Methodology, Lift Plan, Maximising Modular erection, Conducting safety meeting as per schedule
- Defining scope of work along with technical specifications, Vendor evaluation and preparation of technical recommendations
- Monitoring and controlling of project and achieving schedule targets
- Timely providing front to other deptt for further civil works, Equipment erection, EOT erection etc
- Managing the storage area by optimizing the space to stack Steel strs, Precast concrete members, Equipment's in a given area. All loading and Unloading
General Manager at Jindal Steel & Power Ltd. (2000-12 – 2022-05)
Heading the Fabrication business – Responsible for Production, Dispatch, Marketing, negotiating orders, inventory, Procurement of Raw material, Costing, Profit and Loss, inventory control.
- Spearheading efforts across inspection of fabrication & erection of building structures of rail & universal beam mill, plate mill, SMS Billet caster, Sinter Plant, Coke Oven etc
- Contributing comprehensive project management expertise in the areas of – Project Planning, scheduling, drawing cost estimates, procurement /inventory management, detailed engineering – and judiciously deployed manpower, machines and material resources to optimize overall efficiency
- Taking care of project layout finalization, Equipment selection, civil & structural works, erection of equipments, manpower & resource management
- Defining scope of work along with technical specifications, created tender documents, inviting /evaluating offers from qualified contractors, negotiating and finalizing work contracts on most competitive terms
- Engaging services of consultants and coordinated with them to create cost effective and superior structures
- Efficiently structure tender documents complete with all essential ingredients - Scope of work, Technical Specification, Drawings and inviting bids from qualified suppliers
- Responsible for preparing Production schedule and updating cost
- Monitoring and controlling of project and achieving Production target
- Regularly liaison with local authorities and statutory bodies to secure necessary clearances / approvals to ensure smooth project implementation
- Leading, mentoring & monitoring the performance of the team members to ensure efficiency in process operations and meeting of individual & group targets
- Administering the construction of the factory building and coordinating procurement, installation, commissioning and handing over of machines/ facilities/ equipment to different users as per agreed project plan
Assistant Project Manager at Tyazhprom India Pvt. Ltd. (1997-02 – 2000-11)
Project Handled: Sintering Plant -III (Package –2). Project structure consist of columns, Roof trusses, Crane girder, Gallery girder, Bunker beams, Hopper, pipelines, chute, Liners and Chimney.
- Participated in inspection of fabricated & erected building & technological structure
- Managed Contractor billing & coordinated for its remittance
Assistant Engineer- Design at Nathpa Jhakri Power Corporation (1994-02 – 1997-02)
- Managed analysis & design of rock support for various tunnels for holding complex as well as design of residential buildings & design of steel truss bridge
- Participated in inspection of hydraulic model studies carried out at UPIRI Roorkee
Assistant Engineer at Birla Technical Services (1992-02 – 1994-02)
- Prepared & Analysed structural design of various steel structures of Conveyor Galleries, Trestle & related foundations
- Design of civil structures for HT Substations
- Collection of various data from Site & Estimation of quantities (Steel Structures)
Structural Engineer at Ceacon Consultants (1991-10 – 1992-01)
Assistant Engineer at Continental Construction Ltd (1991-06 – 1991-08)
Education