Sr. General Manager at Arcelor Mittal Nippon Steel Pvt Ltd. (2022-05 – Present)
Heading the Fabrication and Erection of steel Structures of Upstream Project which Includes 2 Nos. Blast furnace, Steel Melting Plant, Hot strip Mill, RMHS, Balance of Plant.
- Ensure the Execution is done in safe manner, Review of SOP, Methodology, Lift Plan, Maximising Modular erection, Conducting safety meeting as per schedule
- Defining scope of work along with technical specifications, Vendor evaluation and preparation of technical recommendations
- Monitoring and controlling of project and achieving schedule targets
- Timely providing front to other deptt for further civil works, Equipment erection, EOT erection etc
- Managing the storage area by optimizing the space to stack Steel strs, Precast concrete members, Equipment's in a given area. All loading and Unloading
General Manager at Jindal Steel & Power Ltd. (2000-12 – 2022-05)
Heading the Fabrication business – Responsible for Production, Dispatch, Marketing, negotiating orders, inventory, Procurement of Raw material, Costing, Profit and Loss, inventory control.
- Spearheading efforts across inspection of fabrication & erection of building structures of rail & universal beam mill, plate mill, SMS Billet caster, Sinter Plant, Coke Oven etc
- Contributing comprehensive project management expertise in the areas of – Project Planning, scheduling, drawing cost estimates, procurement /inventory management, detailed engineering – and judiciously deployed manpower, machines and material resources to optimize overall efficiency
- Taking care of project layout finalization, Equipment selection, civil & structural works, erection of equipments, manpower & resource management
- Defining scope of work along with technical specifications, created tender documents, inviting /evaluating offers from qualified contractors, negotiating and finalizing work contracts on most competitive terms
- Engaging services of consultants and coordinated with them to create cost effective and superior structures
- Efficiently structure tender documents complete with all essential ingredients - Scope of work, Technical Specification, Drawings and inviting bids from qualified suppliers
- Responsible for preparing Production schedule and updating cost
- Monitoring and controlling of project and achieving Production target
- Regularly liaison with local authorities and statutory bodies to secure necessary clearances / approvals to ensure smooth project implementation
- Leading, mentoring & monitoring the performance of the team members to ensure efficiency in process operations and meeting of individual & group targets
- Administering the construction of the factory building and coordinating procurement, installation, commissioning and handing over of machines/ facilities/ equipment to different users as per agreed project plan
Assistant Project Manager at Tyazhprom India Pvt. Ltd. (1997-02 – 2000-11)
Project Handled: Sintering Plant -III (Package –2). Project structure consist of columns, Roof trusses, Crane girder, Gallery girder, Bunker beams, Hopper, pipelines, chute, Liners and Chimney.
- Participated in inspection of fabricated & erected building & technological structure
- Managed Contractor billing & coordinated for its remittance
Assistant Engineer- Design at Nathpa Jhakri Power Corporation (1994-02 – 1997-02)
- Managed analysis & design of rock support for various tunnels for holding complex as well as design of residential buildings & design of steel truss bridge
- Participated in inspection of hydraulic model studies carried out at UPIRI Roorkee
Assistant Engineer at Birla Technical Services (1992-02 – 1994-02)
- Prepared & Analysed structural design of various steel structures of Conveyor Galleries, Trestle & related foundations
- Design of civil structures for HT Substations
- Collection of various data from Site & Estimation of quantities (Steel Structures)
Structural Engineer at Ceacon Consultants (1991-10 – 1992-01)