Executive in Maintenance (Electrical) - Canpac Trends Pvt. Ltd. - Hyderabad
(2024-06)
- A new plant set up & installation work handling.
- Electrical installation at HT & LT side and utilities equipment's installation and maintenance like Transformer, UPS, Air compressor, Air Humidifier Unit, DG set, Packaged AC system etc.
- Production machines installation.
- Cost estimation & materials purchase
- Audit handling i.e. FSC, BRC, SEDEX etc.
- Planning & execution on timely.
Jr. Engineer - TCPL Packaging Ltd - Kamrup, Assam
(2019-10 - 2023-05)
- New Solar projects (1.5 megawatt) installation has been done with the guidance of solar installation team at out plant.
- New machineries installation & commissioning
- Attending machine breakdown and repaired as soon as possible
- Power analyzing, MTTR and MTBF calculating
- Physical stock maintaining
- Preventive maintenance scheduling and executed time to time with team
- New modification or development for machines to enhance production speed
- 33KVA transformer, 750KVA DG set, cooling tower, air compressor and all the electrical equipment monitoring
- ISO, BRC and all the internal documentation work used to do by me
Electrician - Nextgen Printers Pvt Ltd (Unit-1) - Majhitar, East Sikkim
(2017-08 - 2019-10)
- New 500 KVA dg set installing and commissioning
- All the pharmacy industry audits have been handled
- New machine installation with engineers and commissioning
- All the documentary work like stock maintain, Purchase order, audit related, preventive maintenance used to do
- Basic electrical wiring with planning used to do with my team
- Communicating with HOD's and service engineer time to time
Electrical Fresher - Nextgen Printers Pvt Ltd (Unit-2) - Uluberia, Howrah
(2016-08 - 2017-08)
- Learning about basic electrical equipment's
- Learning about industry, system, team work etc.
- Basic electrical wiring, wire dressing, cable laying etc.