Technical Manager (Quality Control) at MOSIL LUBRICANTS PVT.LTD (2026-07 – Present)
- MAINTAINING QUALITY MANAGEMENT SYSTEM IN LAB
- QVERALL RESPONSIBILITY OF LAB TESTING
- PREPARATION OF SOP AND WORK INSTRUCTIONS
- PT/ ILC PROGRAMME
- INTERMEDIATE CHECKING OF SAMPLES
- ACTIONS RELATED TONONCONFORMITY
- CALIBRATION OF MEASURING AND MONITORING EQUIPMENT
- EQUIPMENT MAINTENANCE
- PREPARATION OF TEST REPORTS
- RESOURCE MANAGEMENT
- REVIEW CALIBRATION CERTIFICATES
Sr. Quality Control Executive at LSR SPECIALITY OILS PVT.LTD (2017-01 – 2026-07)
An ISO 9001-2001 & ISO14001-2004 and TS-16949 Certified company. LSR Lubricant company Manufactures Specialty oils, Lubricants VM & Coolants.
- TESTING OF RAW MATERIALS (BASE OILS & ADDITIVES)
- TESTING OF FINISHED PRODUCTS
- PREPARATION OF LAB-BLENDS
- INDUCTIVE COUPLE PLASMA (ICP)
- CHNS INSTRUMENT (ELEMENTAR)
- SHEAR STABILITY TESTER
- AUTO VISCOSITY BATH (CANNON)
- MANUAL VISCOSITY BATH
- COLD-CRANKING SIMULATOR (CCS)
- AIR RELEASE VALUE (ARV)
- FOURIER TRANSMITTANCE INFRARED (FTIR)
- WATER SEPARABILITY TEST (WADEGATI)
- PH METER (METLER TOLEDO)
- FOAMING TEST (SETA)
- AUTO DENSITY METER (ANTON PAAR)
- AUTOTITRATOR-METROHM (TAN & TBN)
- FLASHPOINT APPARATUS
- BOILING POINT APPARATUS
- OVENS, HYDROMETER, THERMOMETER, VISCOMETER
- NOACK VOLATILITY (NCK 2 5G)
- BROOKFIELD VISCOMETER
- MINI ROTARY VISCOMETER (MRV CANNON)
- HTHS HIGH TEMPERATURE HIGH SHEAR (TANNAS)
Q.A - INSPECTOR at REHAU POLYMER PVT.LTD (2015-03 – 2016-12)
REHAU Polymers are processed by: extrusion, injection, molding, and extrusion blow molding. REHAU offers expertise in painting, surface finishing
- IMPROVEMENT OF QUALITY & WORK METHOD 5S, KAIZEN ACTIVITY ETC
- CARRY OUT INTERNAL PROCESS AUDITS
- PROVIDE QUALITY AWARENESS TRAINING TO SHOP FLOOR OPERATORS
- MAINTAIN THE HOUSEKEEPING AND SAFETY OF THE Q.A. WORK AREAS AND LABORATORY
- DO THE ONLINE INSPECTION & LAB TESTING OF FINISH PRODUCT, LIKE- EDGE BAND, WINDOW PROFILE, AND GASKET
- I HAVE HANDLED INSTRUMENT LIKE, PROFILE PROJECTOR
- COORDINATION WITH PLANNING, PRODUCTION RELATED ISSUES
Q.A INSPECTOR at LEAR CORPORATION PVT.LTD (2014-02 – 2015-02)
Lear Corporation Pvt. Ltd. is a manufacture of seating for Automotive companies like VW, GM, M&M and TML.
- IN–PROCESS QUALITY AUDIT FOR SEAT ASSEMBLY LINE & ACTION PLAN ON FINDINGS
- IPPM MONITORING, WEEKLY REPORTS
- Q-CAPABILITY AUDIT PREPARATION
- MONITORING OF IPPM & ACTION PLAN TO REDUCE THE GRAPH
- DAILY FEEDBACK TO SUPPLIERS FOR LINE REJECTION & QUALITY IMPROVEMENT
- MAKING OF SOP/INSPECTION STANDARDS FOR FINAL INSPECTION STAGE
- ONLINE AUDITS FOR PROCESS, PRODUCT & DOCK
- EVALUATION OF SKILL MATRIX
- INVOLVEMENT IN QUALITY IMPROVEMENT ACTIVITIES
- IMPLEMENTATION OF KAIZENS
- INVOLVEMENT IN NEW PROJECTS SAMPLING BUILD
- INVOLVING TOOL TRIALS INSPECTION (LAYOUT) FOR ALL UPCOMING PROJECTS TO TRIALS TO FINAL PRODUCT
- UNDERSTANDING & DISCUSSING CUSTOMER SPECIFIC REQUIREMENT WITH ALL CFT MEMBERS
- INFORM PRODUCTION DEPT. WHEN DEFECTIVE/NON-SPECIFICATION PRODUCT PRODUCED & HAS AUTHORITY TO STOP PRODUCTION & SCRAP THE NONCONFORMANCE PART FROM PRODUCTION & ASSEMBLY AREA