I am Electrical Manager with over twenty years industry experience, principally in electrical maintenance, having excellent practical understanding of HV & LV electrical installation and equipments; Skilled in Maintenance, Troubleshooting, Managing and supervising project, HSE mindset, Computer literate with experience in a computerized maintenance management system, highly motivated, strong work ethic, with excellent team-working skills.To built a promising career & achieve success in the field of Electrical Department with responsibilities, hard work & innovation to achieve the goal of the organization.
Experience
SR.MANAGER - SEVEN STAR STEEL LTD - JHARSUGUDA
(2020-06)
Electrical Department. Employer: Sponge Iron and Power plant, capacity: 200 TPD Sponge, 12MW Power Plant & 12TPH SMS. Company Profile: SEVEN STAR STEELS is a Steel Plant and 8 MW Power Plant at GUDIGAON in Jharsuguda. The current operations include 60000 TPA Sponge Iron plant (2 x 100 TPA DRI Kilns), 8 MW Power plant (4 AFBC x 4 WHRB), 28,800 Tons per Annum of Billet (Size-100 mm x100mm x6M).
- Manage the preventive and corrective maintenance works, Troubleshooting of Electrical related problems, machinery fault analysis and reliability.
- Switching and isolating/de-isolating electrical systems and equipment in accordance with electrical safety rules including HV/MV distribution system
- Perform all necessary servicing, condition monitoring, fault diagnosis rectification and restorative maintenance duties and tasks on electrical systems, sub-systems and equipment.
- Order and supplies equipment.
- Project Management & Development.
- Electrical designing.
- Good understanding of Electrical Drawings, Planning of Projects, Erection & Maintenance.
- Both practical as well as theoretical knowledge of Different Electrical Instruments.
- Working more efficiently and productively so that maxes. Output comes.
- Regular analyzing of organizations Electrical Load Consumption with Ratios and analysis.
- Also company has a 8MW Thermal Power Plant (CPP) is running.
- Operation and Maintenance of 1 x 8MW (4MW AFBC & 4MW WHRB) Synchronous Generator with Brushless excitation and Woodward505 make Digital Automatic Voltage Regulator.
- I had worked in 1 x 12MW SHINNIPPON make TG, ANDRITZ make generator having brushless excitation.
- Involved in transformer testing and maintenance.
- Maintenance of 33KV grid substation, protective relays and associated equipments.
- Transformers 11/15MVA, KVA 11/0.415 KV.
- HT/LT switchgear & allied protection system with provision for DCS interlocking.
- Variable A.C drives rating from 0.75 KW to 160 KW.
- Electrically operated overhead traveling crane, lift & hoist.
- HT/LT synchronous, slip ring and squirrel cage induction motors.
- Invensys Automation DCS System.
- Electrostatic precipitators, high voltage transformer rectifiers.
- Maintenance & trouble shooting of UPS, Battery Charger & battery banks.
- I was given the project responsibility to handle the complete electrical project for our 8-MW power plant, 12 Tone SMS and CMS.
- I am also entrusted the responsibility of 8MW12×2 Tone SMS project of inducto therm furnace.
MANAGER PROJECT - SINGHAL STEEL - Raigarh, District - Chhattisgarh
(2017-11 - 2020-05)
Key Job: 350TPD KILN PROJECT. Electrical Department. Employer: Sponge Iron capacity:4 X100 TPD, 2 X350 TPD Sponge, Power Plants, SMS.
- Supervised installation and commissioning of HT/LT Panels, MCC,/PCC panels, Motors, VFDs, DG set and other electrical equipment’s.
- Work on electrical equipment arrangement, cable routing and electrical system representations.
- Electrical equipment installation, Testing and commissioning.
- Prepared electrical SLDs, load schedules, ,equipment layout, cable schedules and BOQs.
- installation of switchyard of 33/11 kV transformer, CTs/PTs/LAs/Isolators etc.
- Ensured compliance with applicable electrical safety requirement, statutory requirement and project specification.
MANAGER - SEVEN STAR STEEL LTD - JHARSUGUDA
(2011-12 - 2017-11)
Electrical Department. Key Job: 8MW POWER PLANT AND 11/33KV SWITCH YARD PROJECT. Employer: Sponge Iron and Power plant, capacity: 100X2 TPD Sponge, 12MW Power Plant & 12TPH SMS.
PROJECT MANAGER - maithan ispat ltd. - kalinganagar, Jajpur District
(2008-09 - 2011-12)
350TPD KILN AND SMS PROJECT. Electrical. Employer: Sponge Iron and Power plant capacity: 350 X 2 TPD, Power Plant & SMS.
- Power and Distribution Transformers of various ratings.
- H.T. and L.T. Motors.
- Battery Chargers /UPS/ Battery Banks.
- Variable Frequency Drives of various ratings up to 250KW of different makes.
- 33 KV, 11 KV, VCB switchgear, Power and Motor Control Centers and other downstream equipment’s e.g. DCDB, ACDB etc.
- 33KV & 6.6KV overall electrical system with SCADA monitoring for main receiving Sub-station Erection, commissioning & Operation.
- EOT Cranes Erection, commissioning & Operation.
- Erection & commissioning of electrical & instrument system of 350TPD sponge iron & ESP unit.
- Good knowledge of hazardous areas classification, equipment selection and installation and maintenance practices of electrical equipment’s.
- Exposure to other mechanical equipment and instrumentation.
MANAGER - bajrang ispat - Kuarmunda, Rourkela District sundargarh
(2005-08 - 2008-09)
Electrical Department. Employer: Sponge Iron capacity: 50 x 2 and 100 x2 TPD Sponge Iron Plant. Siemens & Schneider telemecanique Electrical HV/LV equipment & installation, Bharat Bijile & L&T VFD.
- Expertise in installing, testing, commissioning & maintenance of electrical equipments.
- Adept at preventive and breakdown maintenance.
- Effective communicator with assertive and strong leadership & analytical qualities
- Proactively identify areas of obstruction/breakdowns and take steps to rectify the equipment’s through application of trouble shooting tools.
- Prepared and reviewed engineering plans, specifications, project schedules, designs, and circuit diagrams.
- Coordinated projects with other departments.
- Knowledge and troubleshooting experience of Instrumentations like RTD, Limit Switches, Transmitters, Pneumatic Valves, Load cells, Level Switches etc.
Asst. Manager - GOVINDAM PROJECTS (P) LTD. - ROURKELA; Kuarmunda, District sundargarh
(2004-01 - 2005-07)
Electrical Department. Employer: Sponge Iron capacity: 2×100 TPD Sponge Iron Plant. Siemens & Schneider telemecanique Electrical HV/LV equipment & installation, CG Motors & L&T VFD with Man Automation PLC.
- Expertise in installing, testing, commissioning & maintenance of electrical equipments.
- Adept at preventive and breakdown maintenance.
- Effective communicator with assertive and strong leadership & analytical qualities
- Proactively identify areas of obstruction/breakdowns and take steps to rectify the equipment’s through application of trouble shooting tools.
- Prepared and reviewed engineering plans, specifications, project schedules, designs, and circuit diagrams.
- Coordinated projects with other departments.
- Knowledge and troubleshooting experience of Instrumentations like RTD, Limit Switches, Transmitters, Pneumatic Valves, Load cells, Level Switches etc.
Shift-In charge - MAA TARINI INDUSTRIES LTD. - Kalunga, Rourkela District sundargarh
(2002-02 - 2004-01)
Electrical Department. Employer: Sponge and Power plant, capacity: 2×50 TPD Sponge Iron Plant. Merlin Gerin, Siemens and Schneider telemecanique Electrical HV/LV equipment & installation, Siemens Motors & ABB and L&T VFD with Esani Automation PLC.
- Indication Motor maintenance.
- To co-ordinate with Electrical Contractor for Electrification, Execution, Erection & Commissioning.
- HT & LT transmission line & sub-station (33KV).
- Handling of electrical load as per requirement.
- Analysis of electrical consumption & consumed demand.
- Daily maintain the power consumption report.
- To provide the proper Preventive maintenance of machines.
- Weekly preparing the Formats of Preventive Maintenance.