INSTRUMENTATION ENGINEER - HETERO DRUGS - NAKKAPALLI
(2014-09 - 2018-09)
- Working at HETERO DRUGS LTD, 6.1MW POWER PLANT and 45 Ton(AFBC) Boiler with Honeywell software
- I alone installed and calibrated transmitters in 3 process boilers in Hetero Infrastructure Private Limited
- Calibrating flow and pressure Transmitters using hart communicator
- Calibrating Siemens positioner and installing the control valve
- Installing the pressure switch and float type level control switch
- Calibrating RTD and thermocouple
- Repairing the auto drain valve and solenoid coil
- Necessary maintenance to compressors and dryers
- Service the power cylinder which operates the damper
- Service the pull cord switch and belt sway switch
- I have experience in calibrating the belt weigher and load cell adjustment with chain calibration and rod calibration
- Calibrating PH meter and conductivity meters
- I have experience in installing oppositive meter (S.P.M)
- I have little knowledge in D.C.S. operation and bypassing the trip interlock in boiler and turbine
- I have a boiler 2nd class certificate
- Best knowledge in understanding circuits
- Preventive maintenance to the motor
SHIFT ENGINEER FOR INSTRUMENTATION - HINDUSTAN NATIONAL GLASS PRIVATE LIMITED - MENAKURU
(2018-10 - 2020-02)
- Controlling and monitoring the temperatures of FOREHEARTH in SIEMENS PLC
- Maintenance to Servo motors
- Half yearly Maintenance of Forehearth Burners
- Daily Maintenance of Lehr Burners
- Calibration to load cells of essae and shrenk process and Calibration to bench weighing scale of essae
- Changing the sensors like 3-wire proximity
- Maintenance to blow, blank and valve block panel
- Maintenance and servicing paddle level switches
- Troubleshooting on PLC and I/O modules
SHIFT ENGINEER FOR ELECTRICAL AND INSTRUMENTATION - Virchow Petrochemical Private Limited - JADCHERLA
(2020-02 - 2025-08)
- Providing necessary connections for various reactors like SSR and GLR
- Alone done the project of 4.5MW thermal power plant (30tph Thermax boiler and 4.5MW Triveni turbine)
- Commissioning of 14.5MW power plant (75 ton CFBC ISGEC boiler and Siemens condensate turbine)
- Worked in a solar power plant of 10MW
- Commissioning of 30kl, 150kl and 250kl fermentation reactors along with media preparation tank, soya oil preparation tank, sugar solution preparation tank, ammonia and PAA tanks automation
- CIP tank automation for fermenters
- Providing connections to ANFDs and centrifuges
- Commissioning vacuum pumps of EDWARDS ES-400 and its troubleshooting
- Done the project on utility automation
- Done the project of 150 KLD ETP automation
- Done the project of solvent dispensing system
- Cross-checking checking of RTD sensor through RTD simulator
- Calibrating pH meter of global using standard solutions
- Have well-known knowledge in installing camera and media converters
- Have knowledge of intercom connections
SPECIALIST FOR ELECTRICAL AND INSTRUMENTATION - Crest Cellulose Private Limited - NAIDUPETA(MENAKURU VILLAGE)
(2025-08)
- Handling of shift schedule and shift activities
- Following the documentation and preventive maintenance schedule
- Speed door of GFA maintenance works
- Knowledge of packing machines like Techno weigh scale and TIA
- Done the automation for dehydrator in ETP
- Adding interlocks to thermopack and boiler
- I made a separate VFD panel for speed door operations by using photoelectric electric sensors
- Knowledge of dynamic and static pass box
- Knowledge in focus app for material indent and to follow the vendors
- Involved in 11kV to 33kV upgrade works