
Deepak Sulgekar
STP Operator
Hire this person
Send a job offer directly to this candidate
About
Experienced Water and Sewage Treatment Plant Operator with 9+ years of expertise in operating STP, WTP, and potable water pump stations across the UAE. Skilled in SCADA monitoring, chemical dosing, RO units, chlorination, and pump station operations with strong focus on HSE and water quality compliance. Proven ability to optimize plant performance, reduce downtime, and train junior staff.
Worked with Emirates Link Nitco LLC (ICAD-3 STP – 40,000 m³/day), TAMAS Projects LLC (Potable Water Pump Station – Al Ghadeer Community), and currently with Veolia Environmental Services Emirates LLC on the EGA wastewater treatment project. Committed, safety-conscious, and adaptable to 24/7 operations, delivering reliable water and wastewater treatment solutions.
Experience
STP Operator at Veolia Environmental Services (2025-08 – Present)
- Skilled in managing the operation of complex systems, ensuring optimal performance and safety standards. Proficient in monitoring equipment, troubleshooting issues, and executing routine maintenance tasks to minimize downtime. Demonstrates expertise in following strict protocols and regulatory guidelines while efficiently operating machinery. Effectively collaborated with team members to enhance operational efficiency, leading to a 15% reduction in processing time.
- Implemented preventive maintenance schedules that improved equipment reliability and extended lifespan, resulting in cost savings.
- Conducted safety inspections and training sessions, contributing to a 30% decrease in workplace incidents.
- Utilized strong analytical skills to interpret data and optimize processes, driving continuous improvement initiatives that aligned with company objectives.
Potable Water Pump Station (SCADA) Operator at Tamas Projects (2020-09 – 2025-07)
Potable Water Pump Station at TAMAS Projects LLC. Working Location: Al Ghadeer Waterfall Community, Abu Dhabi
- Operate and maintain water treatment plant systems to ensure a consistent supply of clean potable water.
- Monitor SCADA systems, plant equipment, and chemical dosing processes for optimal performance.
- Perform preventive maintenance and troubleshoot operational issues promptly.
- Supervise and guide team members while ensuring strict adherence to safety protocols.
- Reduced plant downtime by 15% through effective preventive maintenance strategies.
- Successfully trained over 5 new operators on SCADA system operations and safety compliance.
Sewage Treatment Plant Operator at Emirates Link Nitco (2015-12 – 2020-09)
Sewage Treatment Plant Operator at Emirates Link Nitco LLC, Abu Dhabi. Working Locations: ICAD 3STP, GhayathiSTP, RuwaisSTP, Baya Al SilaSTP.
- Operated and monitored 40,000 m³/day Sewage Treatment Plant (STP) at ICAD 3, Abu Dhabi.
- Managed process units like screening, aeration tanks, clarifiers, sludge dewatering, and chlorination.
- Monitored SCADA systems and recorded critical parameters (pH, DO, flow rates).
- Performed routine inspections, basic maintenance, and reported abnormalities.
- Ensured compliance with environmental and HSE standards.
- Improved plant efficiency and reduced chemical consumption by optimizing dosing practices.
- Played key role in handling emergency situations and restoring plant operations without downtime.
- Recognized for maintaining accurate documentation and smooth shift handovers.
Education
MS-CIT in computer information – MS-CIT Kowad, India (2013)
Diploma in Engineering – Sanjay Ghodawat University, Kolhapur., India (2013)
